Want tender expert help? See our tender preparation service
Tenders

Preparation of the Construction Project for the Reconstruction of the Hirvepark Lighting Installation

Closed

Updated October 14, 2026

Submission Deadline Has Passed

This tender's submission deadline has passed and is no longer accepting applications. The information below is kept for reference purposes.

Browse Active Tenders
Deadline
Expired
March 13, 2026
Contract Details
Category
Services
Reference
306674
Value
€60,000
Location
Estonia
Published
February 25, 2026
CPV Code
Evaluation Criteria
Preparation of the construction project for the reconstruction of the Hirvepargi lighting installation100%
Project Timeline

Tender Published

February 25, 2026

Deadline for Questions

March 06, 2026

Submission Deadline

March 13, 2026

Tender Opening

March 13, 2026

Win ProbabilityPRO
🔒
Upgrade to Professional
See your estimated win probability based on historical data.
Upgrade to Professional →
Sector InsightsPRO
🔒
Unlock Sector Insights
See average winning prices, competition levels, and market trends.
Upgrade to Professional →

Key facts

Estimated value
€60,000
Deadline
Expired
CPV Code
71320000-7 — Engineering design services
Procedure
Open procedure
Budget
€60,000
Duration
19 months
Location
Estonia
Type
Services
75
Quality Score/100
Good
Market Benchmark
Avg. Winning Price
€71,415
Avg. Bids
4.8
Competition
Medium
SME Winners
99%
2,006 tenders analyzed

Original Tender Description

The purpose of the procurement is to conclude a procurement contract for the preparation of the main project for the reconstruction of the Hirvepark lighting installation.
Green ProcurementEU FundedElectronic Submission

Run Risk Analysis

Identify potential risks, inconsistencies, and red flags across all tender documents. Get a detailed risk report with severity levels and mitigation recommendations.

Login

Win Strategy

AI-powered analysis of this tender's requirements, opportunities, and challenges. Get strategic insights to maximize your win probability.

65%
Estimated Win ProbabilityModerate Fit

This tender for Hirvepargi lighting reconstruction design is heavily weighted towards cost. A winning strategy will focus on delivering a technically compliant, BIM-integrated solution at the most competitive price, while subtly highlighting expertise in public infrastructure projects and sustainable design principles.

Key Winning Messages

Cost-Effective Technical Excellence: Delivering a fully compliant and technically superior design at the most competitive price.

Seamless BIM Integration: Demonstrating mastery of BIM workflows for efficient and accurate project delivery.

Proven Public Project Expertise: Highlighting experience in similar municipal projects to build trust and confidence.

Key Opportunities
Dominant focus on price as the primary evaluation criterion.
Mandatory BIM integration provides a clear technical benchmark for differentiation.
The 'comprehensive solution' nature allows for a holistic and potentially more efficient cost structure.
Green procurement is explicitly stated, allowing for value-added proposals.
Key Challenges
Intense price competition due to the evaluation criteria.

Conduct a thorough cost analysis, optimize internal processes, and explore efficient subcontractor engagement to ensure a highly competitive bid without compromising quality.

Strict BIM requirements necessitate robust technical capability and adherence to specific formats.

Ensure the bidding team has proven BIM expertise and has successfully delivered projects with similar BIM requirements. Conduct internal reviews to confirm compliance with all specified geometry and file format requirements.

Potential for delays due to legal proceedings impacting contract commencement.

Acknowledge this risk in the bid strategy and ensure internal project planning accounts for potential flexibility. Focus on delivering a flawless bid to minimize any grounds for dispute.

Ideal Bidder Profile
A technically proficient engineering design firm with proven experience in public infrastructure projects, specifically lighting and urban park environments. The ideal bidder will possess strong BIM capabilities, a demonstrated understanding of Estonian technical standards, and a lean operational structure allowing for competitive pricing.
Key Requirements
Adherence to technical description including lighting calculations, environmental class, and corrosion resistance.
Comprehensive use of BIM models as per provided technical conditions, including geodetic surveys and BIM coordinator involvement.
Submission of BIM models in original format (preferably DWG) and other open formats, with sufficient detail.
Completion and submission of a BIM implementation plan template.
Lowest price for construction project preparation works.
Confirmation of meeting all tender document conditions and no grounds for exclusion.
Submission of subcontractor data if not visible in the commercial register.
Key Discriminators
Demonstrated cost leadership in BIM-enabled infrastructure design.
A highly detailed and practical BIM implementation plan that exceeds minimum requirements.
A clear understanding and integration of sustainable lighting solutions within the technical design, aligning with the 'Green Procurement' aspect.
Social Value Opportunities
Commitment to employing local skilled labor for specific project tasks where feasible, contributing to the local economy.
Bid Focus Areas
Cost of construction project preparation worksMaximum score for lowest price

Develop a lean and efficient cost model. Benchmark against similar projects and ensure all overheads are accurately accounted for but minimized. Explore opportunities for process optimization within the design phase.

Recommendations6
Aggressively Price for the Win
CriticalHigh effort

Given that price is the sole evaluation criterion, a highly competitive price is paramount. Conduct a detailed cost breakdown, identify areas for efficiency, and ensure the bid is at the lower end of what is financially sustainable.

Directly influences the maximum score achievable.
Master BIM Compliance
CriticalHigh effort

Thoroughly review and ensure absolute adherence to all BIM requirements, including geometry, file formats, geodetic surveys, and the BIM coordinator role. Demonstrate this capability through the BIM implementation plan and technical proposal.

Ensures technical compliance and avoids disqualification.
Integrate Green Procurement Principles
HighMed effort

While not explicitly evaluated, subtly weave in how the design will contribute to energy efficiency, reduced light pollution, and long-term sustainability, aligning with the 'Green Procurement' aspect. This can be mentioned in the technical description or a supporting document.

Adds perceived value and aligns with the contracting authority's broader objectives.
Thoroughly Complete All Forms
HighMed effort

Pay meticulous attention to detail when completing all required forms, including the BIM implementation plan template and any subcontractor declarations. Ensure all mandatory fields are populated accurately and completely.

Avoids administrative disqualification and demonstrates attention to detail.
Proactive Subcontractor Vetting
MediumMed effort

If subcontractors are to be used, ensure their suitability and provide all required data promptly. Verify their commercial register status and authorized representative details to avoid submission issues.

Prevents submission errors and potential disqualification.
Incorporate Local Employment Mention
LowLow effort

Include a brief statement about the potential for utilizing local skilled labor where appropriate, aligning with broader social value principles without adding significant cost or complexity.

Enhances the bid's broader appeal.
Competitive Positioning
Position as the most cost-effective provider of technically compliant BIM design services for public infrastructure. Highlight efficiency gains through BIM that translate to lower costs for the client. Emphasize a streamlined project delivery process that minimizes risk and maximizes value for the €60,000 budget.

Competitors

Upgrade to see which companies are likely to bid on this tender, based on historical procurement data.

Login

Requirements & Qualifications

21 requirements across 5 categories

Submission (7)
Mandatory (1)
Compliance (3)
Technical (6)
Financial (4)
SUBMISSION REQUIREMENTS7
--Bidders must submit their bid in accordance with the prescribed form.
--The deadline for submission is 2026-03-13 12:00:00.
--The tender is an open procurement procedure.
MANDATORY EXCLUSION GROUNDS1
--Bidders must not have participated in corrupt practices.
ELIGIBILITY REQUIREMENTS3
--Bidders must confirm that they meet all tender document conditions.
--Bidders must confirm that they have no grounds for exclusion from the procurement procedure.
--If subcontractor data is not visible in the commercial register, data on authorized representatives must be provided.
TECHNICAL CAPABILITY REQUIREMENTS6
--The construction project must be prepared in accordance with the technical description, including lighting calculations, environmental class, and corrosion resistance specifications.
--BIM models must be used in the preparation of the construction project according to the provided technical conditions, including geodetic surveys, involvement of a BIM coordinator, and specific data content requirements.
--Requirements for the geometry and file formats of BIM models at different design stages are defined.
FINANCIAL REQUIREMENTS4
--The total value of the tender is 60000.0 EUR.
--The duration of the contract is 19 months.
--Bidders must submit the cost of the construction project preparation works and a payment schedule in the prescribed form.

Requirements Preview

Sign up to view complete requirements and analysis

Documents

15 documents available with AI summaries

VastavustingimusedPDF
306674_vastavustingimused.pdf -- 10.0 KB

Bidders must confirm compliance with all tender document conditions and non-involvement in corrupt practices, submitting the bid price according to the specified format.

Lisa 2. Riigihanke pakkumuse maksumuse esildise vorm ja maksegraafikXLS
Lisa 2 Riigihanke pakkumuse maksumuse esildis... -- 22.3 KB

Bidders must submit the form for the cost and payment schedule of the Hirvepark lighting installation reconstruction design project.

Hindamiskriteeriumid ja hinnatavad näitajadPDF
306674_hindamiskriteeriumid.pdf -- 2.8 KB

The tender evaluation criteria focus on the cost of preparing the Hirvepark lighting installation reconstruction construction project, where the lowest price receives the maximum score.

Hankepass täiendatavate selgitustegaPDF
306674_hankepass_taiendavate_selgitustega.pdf -- 80.1 KB

The procurement pass (ESPD) is a self-declaration by the economic operator serving as preliminary evidence of meeting the qualification requirements set by the contracting authority, but it is not filled out directly.

Lisa 1.1 Hirvepargi_TTSIG
Lisa 11 Hirvepargi_TT.asice -- 18.1 MB

No summary available for this document.

Lisa 1.2 Tehniline kirjeldus Hirvepargi treppide rekonstrueerimiseks 1311DOC
Lisa 12 Tehniline kirjeldus Hirvepargi treppi... -- 260.4 KB

No summary available for this document.

Lisa 1.3.1 BIM rakenduskava alusmallDOC
Lisa 131 BIM rakenduskava alusmall.docx -- 108.6 KB

This document is a BIM implementation plan template containing basic project information and stage timelines that needs to be completed and submitted.

Lisa 1.3.2 BIM tehnilised tingimusedDOC
Lisa 132 BIM tehnilised tingimused.docx -- 37.9 KB

The contracting authority requires the use of BIM models for the construction project preparation according to the provided technical conditions, including geodetic surveys, involvement of a BIM coordinator, and specific data content requirements.

Lisa 1.3.3 Esitatavate mudelite nimekirjadXLS
Lisa 133 Esitatavate mudelite nimekirjad.xlsx -- 28.9 KB

The contracting authority requires submitted models to be provided in their original format (preferably DWG) and, if necessary, in other open formats, ensuring sufficient detail for design and verification work.

Lisa 1.3.4 TLN_infra_andmesisu-nouded_180925XLS
Lisa 134 TLN_infra_andmesisu-nouded_180925.xl... -- 2.0 MB

This document specifies requirements for deliverable geometry and file formats for BIM model creation at various design stages.

Lisa 1 Tehniline kirjeldusDOC
Lisa 1 Tehniline kirjeldus.docx -- 1.2 MB

This technical specification defines the requirements for the construction project design of the Hirvepark lighting installation reconstruction, including specifications for lighting calculations, environmental class, and corrosion resistance.

Lisa 3.1 Alltöövõtja kinnitusedDOC
Lisa 31 Alltöövõtja kinnitused.docx -- 23.0 KB

The subcontractor must confirm that they have no grounds for exclusion from the procurement procedure and provide information about authorized representatives if they are not visible in the commercial register.

Lisa 3. Alltöövõtu kasutamise vormDOC
Lisa 3 Alltöövõtu kasutamise vorm.docx -- 23.4 KB

The bidder must submit a form listing subcontractors used, confirming their suitability and representative details.

Lisa 4. Lepingu projektDOC
Lisa 4 Lepingu projekt.rtf -- 275.9 KB

No summary available for this document.

RHADDOC
RHAD.docx -- 98.9 KB

The Contracting Authority, Tallinn Environment and Public Works Department, invites bids for the design of the Hirvepark lighting installation reconstruction project through an open procurement procedure.

Documents Preview

Sign up to view document summaries and analysis

75
Good

Tender Quality Score

This tender for the Hirvepargi lighting reconstruction project design is generally well-structured, with clear technical requirements and a straightforward evaluation based on price. However, it could benefit from more explicit sustainability considerations and a slightly more accessible submission process.

Score Breakdown

Legal Compliance75/100

The tender adheres to standard legal compliance requirements, including a clear procedure, a relevant CPV code, and no reported disputes. Deadlines appear reasonable within the context of the procedure type. Regulatory compliance is assumed based on the available information.

Clarity80/100

The description of the project's objective is clear. Technical requirements, particularly regarding BIM usage, are detailed. Evaluation criteria are explicitly stated as price-based. Conditions for contract execution in case of delays are also outlined.

Completeness70/100

Most basic information is present, including estimated value, duration, and deadlines. A significant number of documents are provided, detailing technical specifications, qualification requirements, and submission forms. However, some document formats (.rtf, .asice) are not machine-readable for full analysis, potentially impacting completeness for automated systems.

Fairness85/100

The tender is open and accessible, with full document access indicated. The value is disclosed, and criteria are objective (lowest price). E-submission and e-procurement are mandated, promoting fairness. The decision not to divide into lots is justified by the need for a 'comprehensive solution', which is a reasonable, non-discriminatory approach.

Practicality65/100

E-submission and e-procurement are in place. The contract start date is not explicitly stated but implied to follow the tender process. Financing information is not detailed. The duration is specified. The reliance on specific file formats for some documents might pose a minor practical challenge for bidders not fully equipped for them.

•Financing information not detailed.
Data Consistency90/100

Key fields such as title, reference, organization, value, and deadlines are populated. There are no reported suspensions or disputes. Dates are logically sequenced (reveal, submission, opening). The tender valid period aligns with the submission deadline.

Sustainability50/100

The tender explicitly mentions 'Green Procurement' and 'EU Funded', indicating a commitment to these aspects. However, there are no specific social criteria or innovation requirements detailed within the provided information, limiting the overall sustainability score.

•Lack of specific social criteria.
•Lack of specific innovation requirements.

Strengths

Clear technical specifications, especially regarding BIM.
Objective evaluation criterion (lowest price).
Mandatory e-procurement and e-submission.
Justified decision not to divide into lots.

Concerns

Limited detail on financing.
Some document formats not machine-readable for full analysis.
Lack of specific social and innovation criteria.

Recommendations

1. Provide more detailed financing information.
2. Consider including specific social or innovation objectives to enhance sustainability.
3. Ensure all essential documents are provided in machine-readable formats.

AI Scoring Preview

Sign up to view complete requirements and analysis

Complete quality score analysis
Detailed sub-score breakdown
Strengths & concerns insights
Strategic recommendations

No credit card required • Setup in 2 minutes