Want tender expert help? See our tender preparation service
Tenders

Reconstruction of Sinimäe Boiler House

Closed

Submission Deadline Has Passed

This tender's submission deadline has passed and is no longer accepting applications. The information below is kept for reference purposes.

Browse Active Tenders
Deadline
Expired
January 30, 2026
Contract Details
Category
Construction
Reference
304803
Value
€394,000
Location
Estonia
Published
January 15, 2026
Organization
CPV Code
Project Timeline

Tender Published

January 15, 2026

Deadline for Questions

January 23, 2026

Submission Deadline

January 30, 2026

Tender Opening

January 30, 2026

Win ProbabilityPRO
🔒
Upgrade to Professional
See your estimated win probability based on historical data.
Upgrade to Professional →
Buyer IntelligencePRO
🔒
Unlock Buyer Intelligence
See spending patterns, preferred procedures, and more.
Upgrade to Professional →
Sector InsightsPRO
🔒
Unlock Sector Insights
See average winning prices, competition levels, and market trends.
Upgrade to Professional →
Budget
€394,000
Duration
Not specified
Location
Estonia
Type
Construction
71
Quality Score/100
Good
Market Benchmark
Avg. Winning Price
€524,963
Avg. Bids
4.7
Competition
Medium
SME Winners
94%
5,932 tenders analyzed

Original Tender Description

Katlamaja ja selle juurde kuuluva hakkelao ehitusprojekti koostamine, ehitustööde teostamine, katlamaja ja pelletilao seadmete tarnimine ja paigaldamine, katlamaja automaatjuhtimise süsteemi väljaehitamine.
EU FundedElectronic Submission

Run Risk Analysis

Identify potential risks, inconsistencies, and red flags across all tender documents. Get a detailed risk report with severity levels and mitigation recommendations.

Login

Win Strategy

Get an AI-powered winning strategy tailored to this tender. Includes win probability score, key opportunities and challenges, recommended bid focus areas, competitive positioning insights, and actionable recommendations to maximize your chances.

Login

Competitors

Upgrade to see which companies are likely to bid on this tender, based on historical procurement data.

Login

Requirements & Qualifications

26 requirements across 5 categories

Submission (8)
Mandatory (3)
Compliance (6)
Technical (7)
Financial (2)
SUBMISSION REQUIREMENTS8
--Submit a written confirmation of the absence of mandatory exclusion grounds (e.g., bankruptcy, liquidation, tax debt).
--Submit proof of no tax debt, if applicable.
--Complete and submit the form confirming legal status, agreement with tender conditions, fulfillment of qualification criteria, and offer validity.
MANDATORY EXCLUSION GROUNDS3
--Bidder must not be in bankruptcy.
--Bidder must not be in liquidation.
--Bidder must not have tax debt.
ELIGIBILITY REQUIREMENTS6
--Confirm legal status.
--Confirm agreement with all tender conditions.
--Fulfill all qualification criteria.
TECHNICAL CAPABILITY REQUIREMENTS7
--Design and construct a fully automated, bio-fuel-fired boiler house.
--Adhere to the specified location, existing utilities, and technical parameters for the boiler house reconstruction project.
--Ensure the proposed design and construction comply with the Piping and Instrumentation Diagram (P&ID) for the new biofuel boiler and reserve boiler.
FINANCIAL REQUIREMENTS2
--Submit a total cost offer for the project.
--Provide detailed unit and total costs for design, demolition, construction, equipment, and installation works for the reconstruction of the Sinimäe boiler house.

Requirements Preview

Sign up to view complete requirements and analysis

Documents

14 documents available with AI summaries

VastavustingimusedPDF
304803_vastavustingimused.pdf -- 3.8 KB

This document outlines the tender submission requirements, including the list of offered equipment, a detailed cost table, a construction schedule, and a power of attorney for joint bidders.

Pakutavate seadmete nimekiriXLS
Lisa 5 Pakutavate seadmete nimekiri Sinimäe K... -- 10.6 KB

To submit a bid, companies must complete this form, listing the brand, parameters, and quantity of proposed equipment (e.g., boiler, multicyclone, smoke extractor) for the Sinimäe boiler house reconstruction.

Maksumuse tabelXLS
Lisa 6 maksumuse vorm Sinimäe KM.xlsx -- 11.2 KB

This document is a cost form that must be completed when submitting a bid, detailing the unit and total costs for design, demolition, construction, equipment, and installation works for the reconstruction of the Sinimäe boiler house.

EhitusgraafikXLS
Tööde teostamise graafik Sinimäe KM.xlsx -- 10.4 KB

This document is a template for submitting the construction schedule for the Sinimäe boiler house reconstruction, outlining the project timeline by month.

Vorm IDOC
Vorm I – Pakkuja kirjalik kinnitus hankemenet... -- 15.7 KB

This form requires bidders to confirm their legal status, agreement with tender conditions, fulfillment of qualification criteria, and offer validity.

Hindamiskriteeriumid ja hinnatavad näitajadPDF
304803_hindamiskriteeriumid.pdf -- 2.8 KB

Tender offers will be evaluated 100% based on the total cost of the offer, with the lowest-priced bid receiving the maximum points.

Kõrvaldamise alused ja kvalifitseerimistingimusedPDF
304803_korvaldamise_alused_ja_kvalifitseerimi... -- 4.5 KB

This document outlines bidder exclusion grounds (e.g., bankruptcy, liquidation, tax debt) and requires bidders to submit a written confirmation of their absence, along with proof of no tax debt if applicable.

Kinnituskiri projekteerimistingimuste vajaduse puudumise kohtaDOC
Fw_ Projekteerimistingimuste taotlusel oleva ... -- 83.5 KB

No summary available for this document.

HDDOC
Hankedokument_Sinimäe katlamaja.docx -- 22.6 KB

These tender documents (HD) provide general instructions and conditions for the Sinimäe boiler house reconstruction tender, specifying the contracting authority, deadlines, contacts, and bid submission requirements.

Hanke tehniline kirjeldusPDF
Lisa 1 - Tehniline kirjeldus Sinimäe KM.pdf -- 226.4 KB

This document outlines the objective of the Sinimäe boiler house reconstruction project, which involves designing and constructing a fully automated, bio-fuel-fired boiler house, specifying its location, existing utilities, and technical parameters.

Torustiku skeemPDF
Lisa 2 - KM PID skeem.pdf -- 357.4 KB

This document is a piping and instrumentation diagram (P&ID) for the Sinimäe boiler house reconstruction, detailing the piping, valves, sensors, and other components for the new biofuel boiler and reserve boiler, complete with a legend and notes.

AsendiplaanPDF
Lisa 3 - KM asendiplaan.pdf -- 597.2 KB

This document is the site plan for the Sinimäe boiler house reconstruction, detailing the gas measuring node, asphalted areas, fire hydrant location, new and existing chimneys, pellet loading and storage areas, and the heating main connection point.

Töövõtulepingu projektDOC
Töövõtuleping (katlamaja projekteerimine ja e... -- 129.5 KB

This document is the draft contract agreement for the design and construction of the Sinimäe boiler house, outlining the terms and obligations of the future contract.

Ühispakkujate volikiri_Vorm IVDOC
Vorm IV - Ühispakkujate volikiri Sinimäe KM.d... -- 14.9 KB

This document is a power of attorney for joint bidders, allowing multiple companies to authorize one of them to act on their behalf in the procurement procedure.

Documents Preview

Sign up to view document summaries and analysis

71
Good

Tender Quality Score

This tender for the reconstruction of the Sinimäe boiler house is generally well-documented with clear technical requirements and promotes fairness. However, it suffers from a critical inconsistency regarding evaluation criteria and lacks explicit details on contract duration and additional sustainability aspects beyond the project's inherent green nature.

Score Breakdown

Legal Compliance75/100

The tender generally appears compliant with public procurement principles, including reasonable deadlines and the 'or equivalent' clause. The CPV code is appropriate. However, the non-standard procedure/type codes and the private organization issuing an EU-funded 'government tender' introduce minor ambiguities regarding the specific regulatory framework.

•Non-standard procedure/type codes (Type: E, Procedure: MS with N/A codes)
•Private organization (SW ENERGIA OÜ) issuing an EU-funded 'government tender' might imply a sub-procurement or specific national context not fully clear.
Clarity70/100

The project description, technical requirements, and submission forms are well-detailed and clear. However, a significant contradiction exists between the stated 'Evaluation Criteria: relative_weighting' and the document specifying '100% based on the total cost of the offer,' which creates ambiguity for bidders.

•Contradiction in evaluation criteria (basic info states 'relative_weighting' while Document 10 states '100% based on total cost').
Completeness70/100

Most essential information, including title, reference, organization, description, deadlines, and value, is provided. Requirements and criteria are extensively defined through various documents. However, the explicit contract duration is not stated in the basic information, and one document (.msg) was not processed.

•Missing explicit contract duration in basic information.
•One tender document (.msg format) was not processed for content analysis.
Fairness85/100

The tender promotes fairness through full document access, disclosed value, and the crucial 'or equivalent' clause for technical specifications, preventing undue tailoring. E-procurement is enabled, ensuring equal access. The 100% cost-based evaluation (if consistently applied) is objective.

Practicality65/100

Electronic submission is supported, which enhances practicality. Financing information (EU Funded) is available. However, the absence of an explicit contract start date and the overall contract duration in the basic information reduces the practicality for bidders in planning and resource allocation.

•Missing explicit contract start date.
•Missing explicit contract duration.
Data Consistency60/100

While most dates are logical and no disputes are present, a critical inconsistency exists between the 'Evaluation Criteria: relative_weighting' in the basic information and the '100% based on the total cost' specified in Document 10. There's also a minor contradiction with 'Value Classified: Yes' vs. the explicitly disclosed value.

•Major contradiction in evaluation criteria (basic info vs. Document 10).
•Minor contradiction: 'Value Classified: Yes' despite the estimated value being explicitly disclosed.
Sustainability60/100

The project itself, involving a bio-fuel-fired boiler house, is inherently a green initiative, which is a significant positive. However, the tender documents do not appear to include additional explicit green procurement criteria (e.g., specific environmental certifications, waste reduction targets), social aspects, or innovation focus beyond the core project scope.

•Lack of explicit additional green procurement criteria beyond the project's inherent nature.
•No explicit social criteria included.

Strengths

Clear and detailed technical requirements and submission forms.
Inclusion of 'or equivalent' clause for technical specifications, promoting fair competition.
Project is EU Funded and involves a bio-fuel boiler house, contributing to green initiatives.
Electronic submission and e-procurement enabled.
Value disclosed and full document access provided.

Concerns

Critical contradiction in evaluation criteria (relative weighting vs. 100% cost).
Missing explicit contract duration and start date in basic information.
Non-standard procedure/type codes and private organization issuing 'government tender' create minor ambiguity.
Lack of explicit additional green, social, or innovation criteria in the tender documents.
One document (.msg) was unprocessable.

Recommendations

1. Clarify and resolve the contradiction in evaluation criteria immediately to ensure transparency and avoid bidder confusion.
2. Provide explicit contract duration and anticipated start date in the basic tender information for better bidder planning.
3. Consider incorporating additional explicit green, social, and innovation criteria, especially for an EU-funded project, to maximize sustainability impact.

AI Scoring Preview

Sign up to view complete requirements and analysis

Complete quality score analysis
Detailed sub-score breakdown
Strengths & concerns insights
Strategic recommendations

No credit card required • Setup in 2 minutes