Connection of Elektrilevi OÜ at Soo and Võru substations

Closed

Updated October 12, 2026

Submission Deadline Has Passed

This tender's submission deadline has passed and is no longer accepting applications. The information below is kept for reference purposes.

Browse Active Tenders
Deadline
Expired
February 27, 2026
Contract Details
Category
Construction
Reference
303477
Value
€3,343,000
Location
Estonia
Published
January 15, 2026
Organization
CPV Code
Evaluation Criteria
Total tender cost (excluding VAT)100%
Project Timeline

Tender Published

January 15, 2026

Deadline for Questions

February 20, 2026

Submission Deadline

February 27, 2026

Tender Opening

February 27, 2026

Contract Start Date

March 16, 2026

Win ProbabilityPRO
🔒
Upgrade to Professional
See your estimated win probability based on historical data.
Upgrade to Professional →
Buyer IntelligencePRO
🔒
Unlock Buyer Intelligence
See spending patterns, preferred procedures, and more.
Upgrade to Professional →
Sector InsightsPRO
🔒
Unlock Sector Insights
See average winning prices, competition levels, and market trends.
Upgrade to Professional →

Key facts

Buyer
Elering AS
Estimated value
€3,343,000
Deadline
Expired
CPV Code
45232220-0 — Substation construction work
Procedure
Simplified procedure
Budget
€3,343,000
Duration
Not specified
Location
Estonia
Type
Construction
63
Quality Score/100
Good
Market Benchmark
Avg. Winning Price
€524,963
Avg. Bids
4.7
Competition
Medium
SME Winners
94%
5,932 tenders analyzed

Original Tender Description

Execution of construction works at Soo and Võru substations in accordance with the conditions set out in the public procurement documents. The work will be carried out using the 'turnkey' method. Turnkey means that all equipment within the scope of the project will be supplied, along with the necessary design works, installed, configured, tested, etc., and finally handed over to the Client in an energized state. Facilities will be designed and built and handed over to the Client in a finished state. All supplied equipment must be installed and commissioned by the contractor. The works must be carried out in an environmentally safe manner. More detailed conditions are set out in the public procurement documents, and some of the public procurement documents are confidential. To review confidential documents, a confidentiality agreement must be signed.
Electronic Submission

Run Risk Analysis

Identify potential risks, inconsistencies, and red flags across all tender documents. Get a detailed risk report with severity levels and mitigation recommendations.

Login

Win Strategy

AI-powered analysis of this tender's requirements, opportunities, and challenges. Get strategic insights to maximize your win probability.

65%
Estimated Win ProbabilityModerate Fit

This tender requires comprehensive substation construction works with a 'turnkey' approach. Success hinges on demonstrating robust technical capability, meticulous adherence to 'turnkey' delivery, and competitive, well-structured pricing. While social value and innovation are not explicitly weighted, demonstrating environmental safety and efficient project execution will be key differentiators.

Key Winning Messages

Proven 'Turnkey' Substation Expertise: Delivering complete, operational substations from design to commissioning, ensuring seamless project execution and minimal client involvement.

Technical Excellence and Compliance: Offering state-of-the-art, compliant equipment and a highly qualified team to guarantee the reliability and safety of the Soo and Võru substations.

Cost-Effective and Predictable Delivery: Providing competitive, fixed pricing with a transparent financing schedule, ensuring budget certainty and timely project completion.

Key Opportunities
Detailed technical specification tables for primary and high-voltage primary equipment offer a chance to showcase superior equipment choices and supplier relationships.
The 'turnkey' method allows for a holistic approach, enabling a bidder to demonstrate integrated project management and efficiency.
The specific questionnaires for relay protection and automation are critical for demonstrating specialized expertise and understanding of Elering's operational needs.
The financing schedule requirement provides an opportunity to demonstrate financial stability and a clear understanding of project cash flow.
Key Challenges
Confidentiality of some tender documents requires prompt action to sign the NDA and access crucial details.

Immediately initiate the process to sign the confidentiality agreement upon receiving the tender documents. Allocate dedicated resources to review confidential information thoroughly and promptly.

Lack of specified evaluation criteria means a strong focus on meeting all mandatory requirements and demonstrating value through technical excellence and competitive pricing is essential.

Assume a balanced evaluation approach where technical capability, price, and adherence to all requirements are heavily weighted. Ensure all technical specifications are met or exceeded, and pricing is competitive yet profitable. Thoroughly address all submission requirements to avoid disqualification.

The 'turnkey' nature demands a high level of coordination and responsibility across multiple project phases (design, procurement, construction, commissioning).

Develop a comprehensive project execution plan that clearly outlines responsibilities, timelines, and risk management strategies for each phase. Highlight past 'turnkey' project successes and the integrated project management approach.

Ideal Bidder Profile
An experienced electrical engineering and construction company with a proven track record in substation construction, including design, equipment supply, installation, and commissioning. The ideal bidder possesses a strong team of certified electrical leads, designers, and adjusters, and has established relationships with reliable suppliers of high-voltage primary equipment. They must also have a solid financial standing and a clear understanding of 'turnkey' project delivery.
Key Requirements
Demonstrate qualifications for substation construction works (via questionnaires).
Provide detailed technical parameters for primary and high-voltage primary equipment.
Team must include A-competence electrical works lead, primary/secondary part designers, and adjusters.
Complete and submit specific questionnaires for relay protection and automation for both substations.
Offer new and defect-free equipment meeting specified technical parameters.
Adherence to 'turnkey' delivery method (design, supply, install, commission, handover).
Confirmation of absence of exclusion grounds for bidder and first-tier subcontractors.
Submit a financing schedule for 2026-2028.
Key Discriminators
Demonstrated experience with 'turnkey' substation projects of similar scale and complexity.
Proactive identification and mitigation of environmental safety risks during construction.
Innovative solutions for equipment integration or operational efficiency, even if not explicitly requested.
A highly experienced and certified project team with a strong track record in high-voltage electrical works.
Social Value Opportunities
Commitment to local employment and skills development during the construction phase, even though not explicitly required. This can be framed as a contribution to the local economy and community.
Bid Focus Areas
Technical Capability (Team Qualifications, Equipment Specifications)

Exceed minimum requirements by providing detailed CVs of key personnel, highlighting their specific experience in similar projects. For equipment, offer best-in-class solutions that meet or exceed technical parameters, supported by manufacturer certifications and warranties. Emphasize the 'new' and 'defect-free' nature of all offered equipment.

Price (Total Cost, Unit Prices, Financing Schedule)

Develop a highly competitive yet profitable pricing structure. Ensure unit prices are fixed and reflect accurate costings. The financing schedule should be realistic and demonstrate financial planning capability, aligning with the project duration and potential cash flow needs.

Compliance (Exclusion Grounds, Contract Terms, Submission Requirements)

Meticulously review and address every submission requirement. Ensure all forms are completed accurately and on time. Provide clear confirmations regarding exclusion grounds for both the bidder and first-tier subcontractors. Accept all tender terms and the draft works contract without reservations.

Project Execution (Turnkey Method, Environmental Safety)

Clearly articulate the 'turnkey' project management methodology. Detail how environmental safety will be ensured throughout the project lifecycle, referencing relevant standards and best practices. This demonstrates a responsible and professional approach.

Recommendations7
Promptly Sign Confidentiality Agreement
CriticalLow effort

Access to confidential documents is essential for a complete understanding of the project scope and technical requirements. Initiate the NDA signing process immediately.

Enables full bid preparation and avoids last-minute information gaps.
Thoroughly Address All Questionnaires
CriticalHigh effort

The specific questionnaires for relay protection and automation are critical. Dedicate expert resources to complete these accurately and comprehensively, showcasing deep technical understanding.

Demonstrates specialized expertise and compliance with specific project needs.
Highlight 'Turnkey' Project Management Prowess
HighMed effort

Emphasize a robust project management framework that effectively integrates design, procurement, installation, and commissioning. Showcase past successful 'turnkey' projects.

Builds confidence in the bidder's ability to deliver a complete, hassle-free solution.
Detail Equipment Specifications Meticulously
HighHigh effort

Provide exhaustive technical details for all primary and high-voltage primary equipment, ensuring they meet or exceed specified parameters. Include manufacturer data and certifications.

Proves technical capability and commitment to quality and compliance.
Proactive Environmental Safety Planning
HighMed effort

Outline a clear plan for ensuring environmental safety during all construction phases, even though not explicitly weighted. This demonstrates responsible procurement.

Reduces perceived risk and aligns with broader sustainability expectations.
Commit to Local Employment (Optional)
MediumLow effort

If feasible, include a commitment to utilize local labor or training initiatives during the construction phase. This adds a positive social dimension.

Enhances bidder's reputation and aligns with potential unstated client priorities.
Competitive and Transparent Pricing
MediumMed effort

Ensure pricing is competitive while reflecting true costs and a reasonable profit margin. The financing schedule should be clear and supportable.

Directly influences the financial evaluation and overall bid attractiveness.
Competitive Positioning
Position the bid as the most reliable and experienced 'turnkey' solution provider, capable of delivering the Soo and Võru substations on time and within budget, with minimal client oversight.
Highlight the technical superiority of the proposed equipment and the expertise of the project team as key differentiators, ensuring the highest standards of safety and performance.
Emphasize a proactive approach to project management and risk mitigation, particularly concerning environmental safety and project execution.

Competitors

Upgrade to see which companies are likely to bid on this tender, based on historical procurement data.

Login

Requirements & Qualifications

29 requirements across 5 categories

Submission (10)
Mandatory (2)
Compliance (2)
Technical (10)
Financial (5)
SUBMISSION REQUIREMENTS10
--Sign and submit a confidentiality agreement through RHR teabevahetus to access confidential documents.
--Confirm absence of criminal, tax debt, or sanction-related exclusion grounds by answering six yes/no questions.
--Provide details for the A-competence electrical works lead.
MANDATORY EXCLUSION GROUNDS2
--Bidders must confirm the absence of criminal, tax debt, or sanction-related reasons for exclusion.
--First-tier subcontractors must not have grounds for exclusion (e.g., corruption, terrorist acts).
ELIGIBILITY REQUIREMENTS2
--Accept all tender terms.
--Accept the terms of the draft works contract.
TECHNICAL CAPABILITY REQUIREMENTS10
--Team must include an A-competence electrical works lead.
--Team must include primary part designers.
--Team must include secondary part designers.
FINANCIAL REQUIREMENTS5
--Submit a total tender cost (excluding VAT).
--Submit fixed unit prices for various project components.
--Submit fixed total prices for various project components.

Requirements Preview

Sign up to view complete requirements and analysis

Documents

19 documents available with AI summaries

Alltöövõtjate kontrollimise tingimused lepingu täitmise etapisPDF
303477_alltoovotjate_kontrollimise_tingimused... -- 39.2 KB

This document outlines the conditions for controlling subcontractors during the contract execution phase, focusing on grounds for excluding first-tier subcontractors, such as corruption and terrorist acts, and poses questions regarding their compliance.

VastavustingimusedPDF
303477_vastavustingimused.pdf -- 15.4 KB

This document outlines bid submission conditions, requiring bidders to confirm acceptance of all tender terms, the newness and defect-free status of offered equipment, and to provide proof of representative authorization, especially for joint bids and foreign companies.

Esitage täidetud küsimustik „031A Kõrgepingeseadmete spetsifikatsioon (Soo)“DOC
031A Kõrgepingeseadmete spetsifikatsioon Soo_... -- 59.9 KB

This document is a mandatory part of the tender, requiring bidders to submit technical specifications for high-voltage primary equipment by filling in provided tables with parameters and manufacturer details for the offered devices.

Esitage täidetud küsimustik „031A Kõrgepingeseadmete spetsifikatsioon (Võru)“DOC
031A Kõrgepingeseadmete spetsifikatsioon Voru... -- 60.2 KB

This document is a mandatory part of the tender, requiring bidders to provide detailed technical parameters for primary equipment (e.g., circuit breakers) in specified specification tables.

Esitage täidetud küsimustik „041 Scope for relay protection and automation (Soo ...DOC
041 Scope for relay protection and system aut... -- 304.5 KB

To submit a tender, complete and submit the questionnaire detailing the scope of relay protection and automation for the Soo 110kV substation.

Esitage täidetud küsimustik „041 Scope for relay protection and automation (Võru...DOC
041 Scope for relay protection and system aut... -- 231.5 KB

This document is a questionnaire to be completed and submitted, detailing the scope for relay protection and system automation at the Võru 110kV substation.

Finantseerimise graafikXLS
Finantseerimise graafik.xlsx -- 24.0 KB

Bidders must submit a financing schedule for 2026-2028, detailing the dates of acts and corresponding amounts.

HinnatabelXLS
Hinnatabelid pakkujatele- Alajaamad erinevate... -- 106.6 KB

This document is a mandatory price table for the Elektrilevi OÜ connection project at Soo and Võru substations, requiring bidders to submit fixed unit and total prices for various project components, excluding VAT but including all other costs.

Meeskonna CVDOC
Meeskonna CV (vorm).docx -- 36.4 KB

Bidders must confirm their team includes necessary specialists for contract execution, including an A-competence electrical works lead and primary/secondary part designers and adjusters, by providing details for the electrical works lead.

Hindamiskriteeriumid ja hinnatavad näitajadPDF
303477_hindamiskriteeriumid.pdf -- 4.7 KB

The tender will be evaluated solely based on the total tender cost (excluding VAT), with the lowest price receiving the maximum points.

Kõrvaldamise alused ja kvalifitseerimistingimusedPDF
303477_korvaldamise_alused_ja_kvalifitseerimi... -- 12.1 KB

This document outlines the grounds for exclusion from the procurement procedure and requires bidders to confirm the absence of criminal, tax debt, or sanction-related reasons for exclusion by answering six yes/no questions.

Hankelepingu kavand (Töövõtuleping)DOC
Hankelepingu kavand (Töövõtuleping).docx -- 77.9 KB

This document is a draft works contract between Elering AS and a contractor, detailing the scope of construction and connection works at the Soo and Võru substations, including remuneration and payment terms.

Hanke mahtZIP
Hanke maht.zip -- 27.0 MB

No summary available for this document.

Juhised pakkujateleDOC
Juhised pakkujatele.docx -- 45.9 KB

This document provides general tender information, instructions for submitting and fixing the bid cost, and conditions for rejecting bids.

Konfidentsiaalsusleping hanke alusdokumentidega tutvumiseksDOC
Konfidentsiaalsusleping hanke alusdokumentide... -- 46.4 KB

This confidentiality agreement is required to access the tender's underlying documents, defining rules and restrictions for processing confidential information within the "Elektrilevi OÜ liitumine Soo ja Võru alajaamades" procurement procedure.

KüsimustikudDOC
Küsimustikud.doc -- 97.5 KB

This document contains questionnaires for bidders to complete, demonstrating their qualifications for substation construction works.

NäidisvormidZIP
Näidisvormid.zip -- 175.5 KB

No summary available for this document.

Skeemid, plaanidZIP
Skeemid plaanid.zip -- 17.1 MB

No summary available for this document.

Tehnilised nõudedZIP
Tehnilised nõuded.zip -- 32.2 MB

No summary available for this document.

Documents Preview

Sign up to view document summaries and analysis

63
Good

Tender Quality Score

This tender for substation construction works presents a detailed scope and clear requirements but is significantly hampered by a critical CPV code error and internal inconsistencies regarding evaluation criteria and procedure type.

Score Breakdown

Legal Compliance40/100

The tender suffers from a critical error in CPV code assignment, classifying 'Substation construction works' under 'Sporting services' (9284), which is a major legal non-compliance. The procedure type 'LM' is also vaguely defined without a standard code.

•Incorrect CPV code (9284 instead of construction-related code)
•Vague procedure type 'LM (Code: N/A)'
Clarity75/100

The project description and AI-extracted requirements are generally clear and comprehensive. However, there is a direct contradiction between the stated 'relative_weighting' evaluation characteristic and the explicit instruction to evaluate 'solely based on the total tender cost (excluding VAT), with the lowest price receiving the maximum points.'

•Contradiction in evaluation criteria (relative weighting vs. lowest price)
Completeness65/100

Basic information, deadlines, and value are provided. Detailed requirements are outlined, and location information is clear. However, the contract duration is not explicitly stated in the main tender data, and the AI could not analyze the content of many crucial .zip documents, limiting a full assessment of their completeness.

•Contract duration not explicitly stated
•Content of many critical .zip documents not analyzed
Fairness85/100

The tender supports e-procurement and discloses the estimated value. Deadlines for submission are reasonable. While access to some documents requires a confidentiality agreement, the process is outlined, and there is no indication that requirements are tailored to a specific company.

•Access to some documents requires a confidentiality agreement
Practicality70/100

Electronic submission is supported, and financing information is available through the draft contract and required bidder schedule. The contract start date is provided, though noted as indicative. The overall duration is not explicitly stated, relying on the draft contract.

•Contract duration not explicitly stated in main data
•Contract start date is indicative
Data Consistency60/100

A significant inconsistency exists between the 'relative_weighting' characteristic and the 'lowest price' evaluation criterion. The procedure type 'LM' is vague, and the 'Value Classified: Yes' label contradicts the disclosed estimated value.

•Contradiction in evaluation criteria
•Vague procedure type
Sustainability35/100

The tender includes a general statement about environmentally safe execution of works but lacks specific green procurement criteria, social aspects, or an innovation focus. It is not indicated as EU-funded.

•Lack of specific green procurement criteria
•No social or innovation focus

Strengths

Clear project description and detailed AI-extracted requirements
Electronic submission and e-procurement enabled
Reasonable submission deadline and disclosed estimated value
Comprehensive set of tender documents provided
Clear location information for the works

Concerns

Critical error in CPV code assignment (9284 'Sporting services' for construction)
Contradiction between 'relative_weighting' and 'lowest price' evaluation criteria
Vague definition of the procurement procedure type ('LM')
Access to some tender documents requires a confidentiality agreement
Lack of specific sustainability (green, social, innovation) criteria

Recommendations

1. Correct the CPV code to accurately reflect substation construction works.
2. Clarify and ensure consistency in the evaluation criteria (either relative weighting or lowest price).
3. Clearly define the procurement procedure type according to national or EU standards.

AI Scoring Preview

Sign up to view complete requirements and analysis

Complete quality score analysis
Detailed sub-score breakdown
Strengths & concerns insights
Strategic recommendations

No credit card required • Setup in 2 minutes