Upgrade to see which companies are likely to bid on this tender, based on historical procurement data.
Login30 requirements across 6 categories
Sign up to view complete requirements and analysis
10 documents available with AI summaries
Two-part mandatory tender: build a turnkey fishermen’s shed (complete HVAC, refrigeration, certified installers) and replace a 24 m floating quay with two 12 m monolith pontoons plus wooden walkway; bidders must hold §24 construction licence, use PRIA price form, and certify no >10 % Russian-involved sub-contracting.
ESPD v2.0 laiendatud esitamisvorm, mida pakkujad peavad täitma ja esitama oma kvalifikatsiooni tõendamiseks.
This is a 100% price-only tender (lowest bid wins) for two mandatory lots—building a fully fitted fishermen’s shed (incl. heat-pump, ice-maker, finish) and replacing a floating pier—so only contractors holding Estonian §24 construction qualification and able to deliver/commission the specified equipment themselves (or via certified subcontractors) should bid.
Mandatory: builder must hold §24 professional qualification, submit PRIA price form, deliver complete fishermen’s shed (excluding PV) incl. heat-pump, ice-maker, finish & install, plus replace 24 m pontoon with two 12 m monolith pontoons & wooden gangway, all within 6 months; subcontractors need valid certs—bid only if you can supply & warrant the full package for 24 months.
PRIA vormi kuur - esitamise vorm, mida tuleb täita ja esitada hankele vastamisel.
PRIA vorm ujuvkai projekti jaoks, mis tuleb täita ja esitada hankelepingu sõlmimiseks.
This is the draft works contract for Part I of the Orjaku fishermen’s shed project; it obliges the contractor to build the complete shed (except PV panels) to KAMP Arhitektid project no. 24006, confirms that EU/EMFF co-financing applies, and states that by signing the contractor warrants it already possesses all professional experience, specialist know-how, qualified labour and equipment needed to deliver the work on time and without later claims for extra payment or design changes.
This draft contract for Part II of the Orjaku harbour procurement requires the mandatory replacement of a 24 m floating quay with two 12 m monolith pontoons plus a wooden gangway and life-ring set, and bidders must confirm they possess professional marine-construction experience, qualified personnel and full oversight of the works before signing.
Construction firm must deliver a fully-finished 2026-08-31 turnkey fishermen’s shed (per Kamp Arhitektid projekt 24006, incl. heat-pump, ice/flake machine, interior, excluding PV) and replace a 24 m floating pier with two 12 m concrete pontoons, submitting PRIA-form price on §24 building licence (or equal sub-contractor certs) and evaluated 100 % on lowest compliant price.
This Part II tender (mandatory) requires supply and installation of a 24 m floating pier—two 12 m monolith modules, 8 concrete anchors, wooden gangway 1.2 × 5 m, life-ring set—using deep-impregnated timber, hot-dip-galvanised fixings and 5.1 kN/m² floats; bidders must include Hiiumaa transport, crane and assembly works, price on PRIA form, and may inspect the site before bidding.
Sign up to view document summaries and analysis
Quality analysis for this tender is being processed. Please check back shortly.
Hello! I'm your AI assistant for this tender. I can help you understand requirements, deadlines, eligibility criteria, and provide strategic insights.
No credit card required