Want tender expert help? See our tender preparation service
Tenders

Nant y Mwyn 25-26 Scour Protection Works

Closed

Submission Deadline Has Passed

This tender's submission deadline has passed and is no longer accepting applications. The information below is kept for reference purposes.

Browse Active Tenders
Deadline
Expired
January 29, 2026
Contract Details
Category
Open Procedure
Reference
008381-2026
Value
Not disclosed
Location
Derbyshire and Nottinghamshire, United Kingdom
Published
October 03, 2026
CPV Code
Project Timeline

Tender Published

January 30, 2026

Deadline for Questions

January 22, 2026

Submission Deadline

January 29, 2026

Contract Start Date

February 16, 2026

Budget
Not disclosed
Duration
3 months
Location
Derbyshire and Nottinghamshire
Type
Open Procedure

Original Tender Description

The purpose of these works is to prevent the Nant y Bai watercourse from continuing to scour (causing active erosion of) spoil heaps that make up its banks and causing mobilisation of metal-rich spoil into the watercourse. It is proposed to install a mixture of scour protection interventions including rock filled rolls and bags, geotextile matting and wooden stakes at a number of discrete areas along the bank to stabilise the spoil and prevent ongoing erosion by the Nant y Bai. We would welcome input from the Contractor regarding current design methodology based on previous experiences. The Works comprise the following: • Install scour protection measures in accordance with the drawings; • Install slope stabilisation measures in accordance with the drawings; • Supply and install 150No. rock filled bags as specified on the drawings and as directed on site to provide scour protection in Areas 3, 5 and 6; • Translocate Purple Moor grass into the working area in accordance with the drawings. The source of Purple Moor grass to be agreed with the ecological supervisor but shall be within the Site; • Install silt traps in accordance with the drawings; • Install an overland pipe with associated capture structure and outfall structure in accordance with the drawings; • Deliver plant and materials along designated routes to limit impact on the protected ecology and provide any equipment necessary to minimize the impact on the designated routes. This may include helicopters to aid in load lifting and placement of rock roll bags; and • Plan and execute temporary flow diversion measures to enable the Works in the river bed to be completed. The Works must be carried out, including transportation of plant and materials, in a way that: • Does not cause undue harm to the local ecology, including plants, trees and particularly the protected Calaminarian habitats (comprising metallophyte flowering and non-flowering plant species); • Does not damage local heritage features, including historic mining structures and artefacts; • Does not cause undue disruption to the local community; • Does not cause damage to existing services; • Does not cause damage to the forest track road, • Is in accordance with the relevant Environmental Action Plan (EAP) as prepared by the Mining Remediation Authority and agreed with NRW.

Risk Analysis

Risk analysis is not yet available for this country's tenders. Currently supported: Estonia, Latvia, Lithuania, Poland, France, UK, Denmark, Netherlands, Norway, and Finland.

Win Strategy

Get an AI-powered winning strategy tailored to this tender. Includes win probability score, key opportunities and challenges, recommended bid focus areas, competitive positioning insights, and actionable recommendations to maximize your chances.

Login

Competitors

Upgrade to see which companies are likely to bid on this tender, based on historical procurement data.

Login

Requirements & Qualifications

AI extracts and organizes all requirements from tender documents — mandatory qualifications, technical specifications, financial conditions, and submission rules — clearly categorized so you know exactly what's needed to bid.

Login

Basic Requirements

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Documents

3 documents available with AI summaries

OCDS RecordDOC
008381-2026_ocds_record.json

This tender seeks contractors for environmental remediation works to prevent erosion and metal-rich spoil mobilization in the Nant y Bai watercourse, involving scour protection, slope stabilization, and ecological measures, while adhering to strict environmental and heritage protection guidelines.

OCDS Release PackageDOC
008381-2026_ocds_release.json

This OCDS Release Package details the award and contract for works to prevent erosion of metal-rich spoil heaps in the Nant y Bai watercourse through scour protection and slope stabilization, with strict environmental and heritage protection.

Official PDF VersionPDF
008381-2026_official.pdf

This document is a contract award notice for the Nant y Mwyn Scour Protection Works, detailing the scope of ecological and civil engineering interventions to prevent erosion and stabilize spoil heaps, which has been awarded to SANCTUS LIMITED for £151,415.73.

Documents Preview

Sign up to view document summaries and analysis

Quality Score

Comprehensive quality analysis of this tender scoring legal compliance, clarity, completeness, fairness, practicality, data consistency, and sustainability on a 0-100 scale with detailed breakdown and recommendations.

Login