Want tender expert help? See our tender preparation service
Tenders

Construction of an access road to agricultural land in Dzierzkowice-Podwody over a length of 0.37 km – Stage I

Closed

Updated November 06, 2026

Submission Deadline Has Passed

This tender's submission deadline has passed and is no longer accepting applications. The information below is kept for reference purposes.

Browse Active Tenders
Deadline
Expired
March 26, 2026
Contract Details
Category
Construction
Reference
2026/BZP 00148843/01
Value
Not disclosed
Location
Lubelskie, Poland
Published
October 30, 2026
Organization
CPV Code
Project Timeline

Tender Published

March 11, 2026

Deadline for Questions

March 19, 2026

Submission Deadline

March 26, 2026

Win ProbabilityPRO
🔒
Upgrade to Professional
See your estimated win probability based on historical data.
Upgrade to Professional →
Buyer IntelligencePRO
🔒
Unlock Buyer Intelligence
See spending patterns, preferred procedures, and more.
Upgrade to Professional →
Sector InsightsPRO
🔒
Unlock Sector Insights
See average winning prices, competition levels, and market trends.
Upgrade to Professional →

Key facts

Deadline
Expired
CPV Code
45111200-0 — Site preparation and clearance work
Budget
Not disclosed
Duration
36 months
Location
Lubelskie
Type
Construction
75
Quality Score/100
Good
Market Benchmark
Avg. Winning Price
€12,641,706
Avg. Bids
0.1
Competition
Low
SME Winners
86%
133,693 tenders analyzed

Original Tender Description

Construction of an access road to agricultural land in Dzierzkowice-Podwody over a length of 0.37 km – Stage I

Run Risk Analysis

Identify potential risks, inconsistencies, and red flags across all tender documents. Get a detailed risk report with severity levels and mitigation recommendations.

Login

Win Strategy

AI-powered analysis of this tender's requirements, opportunities, and challenges. Get strategic insights to maximize your win probability.

65%
Estimated Win ProbabilityModerate Fit

This tender for a 0.37 km agricultural access road in Dzierzkowice-Podwody presents a straightforward construction project. Success hinges on demonstrating technical proficiency in earthworks and pavement construction, coupled with a competitive price. While social and green aspects are absent, a focus on efficient project delivery and understanding local context can provide differentiation.

Key Winning Messages

Reliable and efficient execution of essential road construction works.

Cost-effective solution for improving agricultural land access.

Key Opportunities
Lack of specified evaluation criteria suggests price will be a significant factor.
Absence of green and social requirements simplifies the bid, allowing focus on core construction capabilities.
The relatively short road length (0.37 km) may attract bidders looking for smaller, manageable projects.
Key Challenges
Unknown evaluation criteria make it difficult to optimize bid strategy beyond price.

Assume price is a primary driver. Thoroughly review the technical requirements to ensure full compliance and identify areas for cost efficiency. If possible, seek clarification from the contracting authority regarding evaluation methodology.

Lack of information on mandatory exclusion and eligibility requirements requires careful self-assessment.

Conduct a thorough internal review of all mandatory exclusion grounds and eligibility criteria as per Polish public procurement law. Ensure all documentation is complete and accurate to avoid disqualification.

The 36-month duration for a 0.37 km road might indicate potential for phased work or a conservative timeline, requiring careful resource planning.

Develop a realistic project schedule that aligns with the 36-month duration, but also demonstrates the capacity for efficient completion. Highlight any potential for earlier completion if feasible and cost-effective.

Ideal Bidder Profile
A small to medium-sized construction company with proven experience in local road construction, particularly agricultural access roads. They should possess the necessary equipment for earthworks and asphalt paving, a competent technical team for project management and execution, and a strong understanding of local material sourcing and labor availability. Financial stability and a competitive pricing strategy are crucial.
Key Requirements
Geodesic services (measurement, post-construction inventory)
Mechanical earthworks for trench preparation
Construction of mechanically stabilized crushed stone foundation (20cm lower, 10cm upper)
Asphalt concrete pavement (5cm binder, 4cm wearing course)
Finishing works (soil shoulders)
Key Discriminators
Demonstrated understanding of local soil conditions and material availability in the Dzierzkowice-Podwody region.
A lean and efficient project execution plan that minimizes overhead and maximizes value for money.
Proactive communication and a commitment to minimizing disruption to local agricultural activities during construction.
Social Value Opportunities
While not explicitly required, consider a commitment to sourcing materials from local suppliers where feasible, contributing to the local economy.
Bid Focus Areas
Price

Develop a highly competitive price by optimizing material costs, labor efficiency, and minimizing overhead. Leverage local knowledge for cost-effective sourcing. Ensure the price reflects the scope of works accurately without compromising quality.

Technical Compliance

Meticulously address all technical specifications for geodesic works, earthworks, foundation, pavement, and finishing. Provide clear and concise descriptions of methodologies and materials to assure the contracting authority of full compliance and quality.

Recommendations6
Thoroughly Document Geodesic and Earthworks Expertise
CriticalMed effort

Provide detailed evidence of experience in geodesic services and mechanical earthworks, specifically mentioning similar road projects. Include details on equipment and personnel qualifications.

Demonstrates capability to meet fundamental project requirements.
Develop a Highly Competitive and Justified Price
CriticalHigh effort

Given the lack of specified evaluation criteria, assume price is paramount. Conduct detailed cost analysis, identify efficiencies, and present a price that is both attractive and sustainable. Clearly articulate the value proposition.

Maximizes chances of winning if price is the primary evaluation factor.
Highlight Local Knowledge and Experience
HighLow effort

Emphasize any experience working in the Gmina Dzierzkowice or surrounding NUTS region (PL815). This demonstrates familiarity with local conditions, regulations, and potential logistical advantages.

Builds trust and suggests a smoother project execution.
Seek Clarification on Evaluation Criteria
MediumLow effort

If possible, formally request clarification from Gmina Dzierzkowice regarding the evaluation criteria. Understanding the weighting of technical vs. price will significantly refine the bid strategy.

Allows for precise optimization of bid content and resource allocation.
Rigorous Compliance Check for Exclusion and Eligibility
CriticalMed effort

Conduct an exhaustive internal review to ensure no mandatory exclusion grounds apply and all eligibility requirements (once clarified or assumed) are met. Prepare all supporting documentation meticulously.

Prevents disqualification and ensures the bid is formally considered.
Incorporate Local Sourcing Commitment
LowLow effort

Even though social value is not a requirement, a commitment to sourcing construction materials (e.g., crushed stone) from local quarries can be a subtle differentiator and demonstrate community support.

May appeal to the contracting authority's local interests and provide a minor competitive edge.
Competitive Positioning
Position the bid as a cost-effective, reliable solution from a company that understands the specific needs of agricultural access road construction. Emphasize efficiency and timely delivery within the specified (albeit long) timeframe.

Competitors

Upgrade to see which companies are likely to bid on this tender, based on historical procurement data.

Login

Requirements & Qualifications

9 requirements across 5 categories

Submission (1)
Mandatory (1)
Compliance (1)
Technical (5)
Financial (1)
SUBMISSION REQUIREMENTS1
--No information
MANDATORY EXCLUSION GROUNDS1
--No information
ELIGIBILITY REQUIREMENTS1
--No information
TECHNICAL CAPABILITY REQUIREMENTS5
--Preparatory works – geodesic service, including measurement works, post-construction geodesic inventory – on a 0.37 km section
--Mechanical earthworks for preparing the trench for the construction of foundation and pavement layers on a 0.370 km section
--Main foundation made of mechanically stabilized crushed stone on a 0.370 km section with the following structure: - lower layer 20 cm thick, 3.30 m wide - upper layer 10 cm thick, 3.20 m wide
FINANCIAL REQUIREMENTS1
--No information

Requirements Preview

Sign up to view complete requirements and analysis

Documents

12 documents available with AI summaries

Notice PDFPDF
08de7f38-3431-e6b5-056e-e50001ac6723.pdf

This document is a tender notice for the construction of an access road to agricultural land in Dzierzkowice-Podwody, Poland, for Stage I.

1. PZT - opis techniczny.pdfPDF
1. PZT - opis techniczny.pdf -- 3.6 MB

No content extracted

2. PZT -Orientacja.pdfPDF
2. PZT -Orientacja.pdf -- 473.2 KB

No summary available for this document.

3. PZT -plan sytuacyjny.pdfPDF
3. PZT -plan sytuacyjny.pdf -- 1.8 MB

No summary available for this document.

4. PZT -przekrój normalny.pdfPDF
4. PZT -przekrój normalny.pdf -- 91.2 KB

No summary available for this document.

5. PAB -przekroje poprzeczne.pdfPDF
5. PAB -przekroje poprzeczne.pdf -- 196.0 KB

No summary available for this document.

6.1 PAB-profil podłuzny -1.pdfPDF
6.1 PAB-profil podłuzny -1.pdf -- 550.0 KB

No summary available for this document.

6.2 PAB-profil podłuzny-2.pdfPDF
6.2 PAB-profil podłuzny-2.pdf -- 573.8 KB

No summary available for this document.

7. Przedmiar robót.pdfPDF
7. Przedmiar robót.pdf -- 81.8 KB

No summary available for this document.

8. STWiR.pdfPDF
8. STWiR.pdf -- 2.0 MB

No summary available for this document.

SWZ.pdfPDF
SWZ.pdf

No summary available for this document.

Załączniki do SWZ.rarZIP
Załączniki do SWZ.rar

No summary available for this document.

Documents Preview

Sign up to view document summaries and analysis

75
Good

Tender Quality Score

This tender for road construction is generally well-structured with clear technical descriptions and available documentation. However, it lacks specific evaluation criteria and details on financial aspects, impacting completeness and fairness.

Score Breakdown

Legal Compliance75/100

The tender adheres to general procurement principles with a clear CPV code and active status. Deadlines are present, though their reasonableness for the scope is not explicitly assessed. The procedure is not specified, which is a minor point of concern. No disputes are indicated.

Clarity80/100

The description of the road construction works is detailed and specific, including technical specifications for layers and dimensions. The AI-extracted requirements align well with the description, indicating good clarity on the technical scope.

Completeness70/100

Most basic information is present, including title, reference, organization, and deadlines. However, the estimated value is not disclosed, and financial requirements are missing, which significantly impacts completeness. While many documents are attached, the absence of explicit eligibility and submission requirements is noted.

•Estimated value not disclosed
•Financial requirements missing
Fairness85/100

The tender utilizes e-procurement, which promotes fairness. The technical requirements are specific to the project scope and do not appear to be tailored to a particular company. However, the lack of disclosed value and explicit evaluation criteria could be perceived as less transparent.

•Value not disclosed
•Evaluation criteria not specified
Practicality65/100

The tender is marked as e-procurement, which is a positive aspect for practicality. However, the absence of a contract start date and explicit financing information limits the practical assessment. The duration is specified.

•Contract start date missing
•Financing information missing
Data Consistency90/100

Key fields such as title, reference, organization, and deadlines are populated. The dates are logical, and there are no indications of suspension or disputes. The CPV code is provided and relevant.

Sustainability50/100

There is no explicit mention of green procurement, social aspects, or innovation within the tender documents. The tender is not indicated as EU funded.

•No green procurement criteria
•No social criteria

Strengths

Detailed technical description of works
Availability of numerous technical documents
Use of e-procurement
Clear CPV code and location information

Concerns

Estimated value not disclosed
Missing evaluation criteria
Lack of financial requirements
Absence of contract start date

Recommendations

1. Disclose the estimated value of the contract.
2. Clearly define the evaluation criteria for bids.
3. Provide information on the expected contract start date and financing.

AI Scoring Preview

Sign up to view complete requirements and analysis

Complete quality score analysis
Detailed sub-score breakdown
Strengths & concerns insights
Strategic recommendations

No credit card required • Setup in 2 minutes