Want tender expert help? See our tender preparation service
Tenders

MEP Tender Notice

Open
Deadline
22 days left
October 14, 2026
Contract Details
Category
Open Procedure
Reference
079192-2026
Value
£10,800,000
Location
London, United Kingdom
Published
September 15, 2026
CPV Code
Project Timeline

Tender Published

August 19, 2026

Deadline for Questions

October 07, 2026

Submission Deadline

October 14, 2026

Contract Start Date

March 31, 2027

Buyer IntelligencePRO
🔒
Unlock Buyer Intelligence
See spending patterns, preferred procedures, and more.
Upgrade to Professional →
Budget
£10,800,000
Duration
12 months
Location
London
Type
Open Procedure

Original Tender Description

MEPH 1. Survey, isolate, strip out and dispose of relevant existing services in a safe manner. 2. Survey and report on condition of existing services in the Phase 1 areas that are being retained 3. Enabling works and decommissioning of Phase 1 works 4. CCTV Survey of existing drainage/rainwater stacks 5. Above ground soil & waste drainage consisting of new pipework, thermal and acoustic insulation, chlorination and treatment 6. Above ground rainwater drainage system consisting of new pipework, thermal and acoustic insulation, sump pump 7. Supply and installation of sanitaryware including, but not limited to WCs, sinks, taps 8. Domestic cold water services including mains supply, boosted distribution, storage tank, booster set, pumps, conditioner, trace heating, leak detection and insulation 9. Water booster set located in the 'Strands vaults', provided as Part of Phase 1 is to be extended as part of Phase 2 works. 9. Hot water plant and distribution pipework including insulation 10. Low temperature hot water (LTHW) heating systems 11. Dry riser system 12. Water treatment, flushing & chlorination 13. Specialist water treatment / humidification systems (RO plant) 14. Pipework insulation & trace heating 15. Chilled water systems 16. Heat pump plant & associated infrastructure 17. Underfloor heating systems 18. Variable refrigerant flow (VRF) system including cooling units, controllers, refrigerant & condensate pipework distribution, FCUs and insulation 19. Refrigerant leak detection 20. Electric heating systems - radiant heaters and controls 21. Gas installation to Kitchens 22. Boiler flue 23. Meters - heat interface, water and gas. All meters shall be connected and monitored from the Courtauld's automated metering system. 24. Liaison with Thames Water VENTILATION 1. Air handling units and heat recovery units 2. Toilet extract fans 3. Attenuators including cross talk 4. Fresh air intake ductwork 5. Exhaust ductwork 6. Supply ductwork 7. Extract ductwork 8. Kitchen fire rated ductwork 9. Diffusers, grilles and flexible connections 10. Motorised fire / smoke dampers 11. Thermal Insulation 12. Acoustic lining where required 12. Ductwork cleaning 13. General fire rated ductwork 15. Volume control dampers 15. Variable air volume (VAV) systems 16. Smoke extract and smoke control systems 17. Natural ventilation controls & actuated windows 18. Air handling plant ancillary equipment 19. Ceiling and wall fans within East wing & Library ELECTRICAL 1. Survey, isolate, strip out and dispose of relevant existing services in a safe manner. 2. Survey and report on condition of existing services in the Phase 1 areas that are being retained 3. Enabling works and decommissioning of Phase 1 works 4. Liaison with UKPN for their works involving upgraded supply 6. LV switchgear 7. Distribution boards 8. Sub-main cabling distribution 9. Sub-metering 10. Busbar systems 11. Life safety LV cable distribution 12. Life safety emergency lighting cable 13. Primary and secondary containment 14. Mechanical power supplies 15. Power supplies for specialist systems 16. Floor boxes 17. Isolators 18. Sockets 19. General lighting systems 20. Emergency lighting systems 21. Lighting Control including cabling 22. Transformer enclosures 23. Hook up connection to be utilised for a generator to provide temporary power for changeover of UKPN supply 24. Energy metering & monitoring 25. Main equipotential bonding 26. Earthing to lift shafts 27. Surge protection 28. Electromagnetic screening 29. Automatic Transfer Switches (ATS) including mimic panels for evacuation lifts. MEP COMMON 1. Plant handling and movement 2. Testing & commissioning 3. Interfaces & overall systems integration 4. Bracketry and secondary steelwork 5. O&M manuals 6. Labelling and identification 7. Integrated and black building testing 8. Integrated systems testing (IST) 9. BREEAM requirements 10. Surveys and validations 11. Final clean 12. Temporary protection 13. Inertia bases 14. Client training 15. 12 month warranties 16. Samples 17. Soft landings 18. Noise & vibration control 19. Seasonal commissioning 20. Fire protection pillows within containment 21. Intumescent Putty Pads (supply and install) / Hockey Sticks (supply and free issue to Dryliner) 22. Fire Stopping and Fire Collars to all penetrations of 50mm x 50mm or less through all walls or floors (including concrete). 23. Existing services being retained 24. Arrange lift & shift equipment 25. BWIC up to 50mm 26. Big foot system and hop overs

Risk Analysis

Risk analysis is not yet available for this country's tenders. Currently supported: Estonia, Latvia, Lithuania, Poland, France, UK, Denmark, Netherlands, Norway, and Finland.

Win Strategy

Get an AI-powered winning strategy tailored to this tender. Includes win probability score, key opportunities and challenges, recommended bid focus areas, competitive positioning insights, and actionable recommendations to maximize your chances.

Login

Competitors

Upgrade to see which companies are likely to bid on this tender, based on historical procurement data.

Login

Requirements & Qualifications

AI extracts and organizes all requirements from tender documents — mandatory qualifications, technical specifications, financial conditions, and submission rules — clearly categorized so you know exactly what's needed to bid.

Login

Basic Requirements

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Documents

3 documents available with AI summaries

OCDS RecordDOC
079192-2026_ocds_record.json

No summary available for this document.

OCDS Release PackageDOC
079192-2026_ocds_release.json

No summary available for this document.

Official PDF VersionPDF
079192-2026_official.pdf

No summary available for this document.

Documents Preview

Sign up to view document summaries and analysis

Quality Score

Comprehensive quality analysis of this tender scoring legal compliance, clarity, completeness, fairness, practicality, data consistency, and sustainability on a 0-100 scale with detailed breakdown and recommendations.

Login