Want tender expert help? See our tender preparation service
Tenders

Replacement of air conditioning system for the server room of Jelgava Municipality building

Closed

Updated October 14, 2026

Submission Deadline Has Passed

This tender's submission deadline has passed and is no longer accepting applications. The information below is kept for reference purposes.

Browse Active Tenders
Deadline
Expired
March 06, 2026
Contract Details
Category
Supplies
Reference
166095
Value
Not disclosed
Location
Zemgale, Latvia
Published
February 18, 2026
CPV Code
Evaluation Criteria
Offered price60%
Offered price60%
Warranty period40%
Warranty period40%
Project Timeline

Tender Published

February 18, 2026

Deadline for Questions

February 27, 2026

Submission Deadline

March 06, 2026

Tender Opening

March 06, 2026

Win ProbabilityPRO
🔒
Upgrade to Professional
See your estimated win probability based on historical data.
Upgrade to Professional →
Buyer IntelligencePRO
🔒
Unlock Buyer Intelligence
See spending patterns, preferred procedures, and more.
Upgrade to Professional →
Sector InsightsPRO
🔒
Unlock Sector Insights
See average winning prices, competition levels, and market trends.
Upgrade to Professional →

Key facts

Deadline
Expired
CPV Code
42512000 — Air-conditioning installations
Procedure
Open procedure
Lots
Divided into lots
Budget
Not disclosed
Duration
3 months
Location
Zemgale
Type
Supplies
60
Quality Score/100
Good
Market Benchmark
Avg. Winning Price
€112,318
Avg. Bids
2.0
Competition
Low
SME Winners
98%
1,049 tenders analyzed

Original Tender Description

Replacement of air conditioning system for the server room of Jelgava Municipality building

Run Risk Analysis

Identify potential risks, inconsistencies, and red flags across all tender documents. Get a detailed risk report with severity levels and mitigation recommendations.

Login

Win Strategy

AI-powered analysis of this tender's requirements, opportunities, and challenges. Get strategic insights to maximize your win probability.

65%
Estimated Win ProbabilityModerate Fit

This tender requires the replacement of a server room air conditioning system for Jelgava Municipality. While specific evaluation criteria are not fully detailed, a winning strategy will focus on demonstrating technical expertise, reliability, and a clear understanding of the critical nature of server room cooling. Proactive engagement with the contracting authority and a well-structured, compliant bid are essential.

Key Winning Messages

Uninterrupted Server Room Operation: Ensuring maximum uptime and data integrity through a reliable and efficient cooling system.

Expertise in Critical Environments: Demonstrating specialized knowledge in designing and installing HVAC solutions for sensitive IT infrastructure.

Value Beyond Installation: Offering a comprehensive solution that includes robust support and maintenance to guarantee long-term performance.

Key Opportunities
Lack of specified evaluation criteria allows for strategic emphasis on technical merit and reliability.
Short 3-month duration suggests a need for efficient project management and rapid deployment.
Potential for upselling or offering value-added services if not explicitly excluded.
Key Challenges
Absence of detailed technical and financial requirements makes it difficult to tailor the bid precisely.

Thoroughly review all provided tender documents (Nolikums, Part 1 & 2 requirements) for any implied or explicit technical specifications. If possible, seek clarification from the contracting authority regarding expected performance metrics, equipment standards, and financial stability indicators.

Unspecified evaluation criteria mean bidders must make educated assumptions about what the authority values most.

Prioritize demonstrating technical competence, reliability, and a clear understanding of the criticality of server room cooling. Focus on the benefits of uninterrupted operation and data protection. Assume that cost-effectiveness will be a significant factor, but not at the expense of performance or reliability.

Limited information on Green and Social aspects might mean these are not primary drivers, but ignoring them entirely could be a missed opportunity.

While not explicitly required, consider incorporating energy-efficient equipment choices and responsible waste disposal practices as part of the technical solution. This can subtly enhance the bid's appeal without requiring extensive effort.

Ideal Bidder Profile
A specialist HVAC (Heating, Ventilation, and Air Conditioning) contractor with proven experience in critical environment cooling solutions, particularly for server rooms or data centers. The ideal bidder will possess relevant certifications, a strong track record of successful project delivery within budget and timeline, and the capacity to provide prompt and effective post-installation support. They should also be adept at navigating Latvian public procurement procedures.
Key Requirements
Replacement of the server room air conditioning system.
Compliance with mandatory exclusion grounds.
Submission by the deadline: 2026-03-06T10:00:00.
Addressing requirements outlined in 'Iepirkuma priekšmeta 1.daļas prasības, 1.versija' (Part 1 Requirements) and 'Iepirkuma priekšmeta 2.daļas prasības, 1.versija' (Part 2 Requirements).
Key Discriminators
Demonstrated experience with similar critical infrastructure cooling projects (e.g., data centers, server rooms) in public sector or similar environments.
A proposed solution that goes beyond basic replacement, offering enhanced energy efficiency, redundancy, or advanced monitoring capabilities.
A clear and concise project plan outlining a rapid and efficient installation process, minimizing disruption to the municipality's operations.
A strong after-sales support and maintenance package, including guaranteed response times for critical issues.
Social Value Opportunities
Commitment to using local suppliers for ancillary services or materials where feasible, contributing to the local economy of Jelgava Municipality.
Ensuring that all waste generated during the installation is disposed of in an environmentally responsible manner, adhering to Latvian regulations.
Bid Focus Areas
Technical Solution (Acquisition and Installation of Server Room AC)High (assumed)

Detail the proposed system's specifications, ensuring it meets or exceeds industry standards for server room cooling. Emphasize reliability, redundancy, energy efficiency, and ease of maintenance. Provide clear diagrams and technical data sheets. Highlight experience with similar critical environments.

Project Management and TimelineHigh (assumed)

Present a detailed, realistic project plan with clear milestones for procurement, installation, testing, and handover. Demonstrate the capacity to complete the 3-month duration efficiently and with minimal disruption. Include contingency planning.

Compliance and Risk MitigationCritical

Ensure all mandatory exclusion grounds are addressed and documented. Clearly state how the proposed solution mitigates risks associated with server room temperature fluctuations, equipment failure, and operational downtime. Provide evidence of financial stability and relevant certifications.

Recommendations6
Thoroughly Review All Tender Documents
CriticalHigh effort

Obtain and meticulously review 'Nolikums ar pielikumiem', 'Iepirkuma priekšmeta 1.daļas prasības, 1.versija', and 'Iepirkuma priekšmeta 2.daļas prasības, 1.versija'. Pay close attention to any implicit technical specifications, performance requirements, or submission formats.

Ensures full compliance and avoids disqualification.
Assume Technical Merit and Reliability are Key
CriticalMed effort

Given the lack of specified criteria, assume the contracting authority will prioritize a technically sound, reliable, and robust cooling solution that guarantees uninterrupted server room operation. Focus on demonstrating expertise in critical environments.

Aligns bid with likely evaluation priorities.
Seek Clarification on Ambiguities
HighMed effort

If any technical specifications, eligibility criteria, or submission requirements are unclear after reviewing the documents, proactively submit a formal request for clarification to Jelgavas novada pašvaldība well before the deadline.

Reduces risk of misinterpretation and improves bid quality.
Highlight Proven Server Room Expertise
HighMed effort

Provide specific examples and case studies of previous successful server room or data center cooling installations. Quantify benefits achieved (e.g., energy savings, uptime improvements) if possible.

Builds confidence and sets the bidder apart from general HVAC providers.
Develop a Detailed Project Execution Plan
CriticalHigh effort

Create a clear, step-by-step plan for the 3-month duration, including procurement, site preparation, installation, testing, commissioning, and handover. Include a risk assessment and mitigation strategy for potential delays or technical issues.

Demonstrates organizational capability and preparedness.
Incorporate Sustainable Practices
MediumLow effort

While not a mandatory requirement, propose energy-efficient equipment and outline environmentally sound waste disposal methods. This can be a subtle positive differentiator.

Enhances bid's appeal without significant cost or effort.
Competitive Positioning
Position as the most reliable and technically competent provider for critical IT infrastructure cooling, emphasizing minimal disruption and maximum uptime.
Highlight a proactive approach to problem-solving and a commitment to long-term system performance through robust support.
Emphasize a deep understanding of the specific needs of a municipal server room environment.

Competitors

Upgrade to see which companies are likely to bid on this tender, based on historical procurement data.

Login

Requirements & Qualifications

6 requirements across 5 categories

Submission (2)
Mandatory (1)
Compliance (1)
Technical (1)
Financial (1)
SUBMISSION REQUIREMENTS2
--The bid must be submitted by the deadline: 2026-03-06T10:00:00.
--The bid must address the replacement of the server room air conditioning system.
MANDATORY EXCLUSION GROUNDS1
--Bidders must not be subject to mandatory exclusion grounds as per national and EU public procurement regulations.
ELIGIBILITY REQUIREMENTS1
--Specific eligibility criteria are not provided in the given information.
TECHNICAL CAPABILITY REQUIREMENTS1
--Specific technical capability requirements (e.g., experience, certifications, personnel qualifications) are not provided in the given information.
FINANCIAL REQUIREMENTS1
--Specific financial requirements (e.g., turnover, financial stability) are not provided in the given information.

Requirements Preview

Sign up to view complete requirements and analysis

Documents

3 documents available with AI summaries

Iepirkuma priekšmeta 1.daļas prasības, 1.versijaPDF
166095_PD.ANY_1_1_1_20260218134128.pdf -- 94.9 KB

This document contains the procurement requirements and evaluation criteria for Part 1 of the tender, which involves the acquisition and installation of cooling equipment (chiller) for Jelgava Municipality.

Iepirkuma priekšmeta 2.daļas prasības, 1.versijaPDF
166095_PD.ANY_1_1_2_20260218134129.pdf -- 94.9 KB

This document contains the requirements and evaluation criteria for Part 2 of a procurement, specifically for the acquisition and installation of server room air conditioning equipment, including selection, technical, financial, and other submission details.

Nolikums ar pielikumiemDOC
NOLIKUMS_05_EIS.doc -- 1.0 MB

This document contains the regulations for an open competition organized by Jelgava Municipality for the replacement of the air conditioning system in the building's server room, detailing general information, submission requirements, evaluation criteria, and deadlines.

Documents Preview

Sign up to view document summaries and analysis

60
Good

Tender Quality Score

This tender for an air conditioning system replacement has a clear objective and open procedure, but significant concerns exist regarding the clarity and completeness of requirements and evaluation criteria. The non-disclosure of estimated value and potential document access issues also impact fairness and practicality.

Score Breakdown

Legal Compliance75/100

The tender defines a clear open procedure and appropriate CPV codes. The submission deadline is reasonable (17 days). Mandatory exclusion grounds are referenced, indicating adherence to national and EU regulations. However, the potential lack of detailed requirements and evaluation criteria in the main documents could pose a legal risk if challenged.

•Potential lack of detailed eligibility, technical, and financial requirements in the main documents.
•Potential lack of clearly defined evaluation criteria.
Clarity55/100

The tender's title and description are clear. However, the AI-extracted requirements indicate a significant lack of specific eligibility, technical, and financial criteria. Furthermore, the automated flags highlight that evaluation criteria are not specified, which is a major clarity issue for potential bidders.

•Specific eligibility, technical, and financial requirements are not clearly provided or easily extractable.
•Evaluation criteria are flagged as missing or unclear.
Completeness60/100

Basic information such as title, organization, reference, and deadlines are complete. All four tender documents are listed and summarized. However, the estimated value is not disclosed, and critically, specific eligibility, technical, financial requirements, and evaluation criteria appear to be missing or poorly defined in the provided summaries, impacting overall completeness.

•Estimated value is not disclosed.
•Specific eligibility, technical, and financial requirements are not clearly defined.
Fairness50/100

While the tender uses an open procedure and supports e-procurement, several factors reduce its fairness score. The estimated value is not disclosed, hindering bidders' ability to assess the opportunity. The flagged 'restricted document access' and 'no evaluation criteria specified' are significant concerns, potentially leading to an opaque and subjective evaluation process.

•Estimated value is not disclosed.
•Restricted document access (if documents are not easily available).
Practicality65/100

Electronic submission is supported, and contract duration is specified. However, the lack of a direct document URL (implied by 'restricted document access') makes it less practical for bidders to quickly access all necessary information. Financing information is also not available, and the contract start date is not explicitly stated.

•No direct document URL provided for easy access.
•Financing information is not available.
Data Consistency70/100

Most key fields are populated, and dates are logical and consistent. There are no reported disputes or suspensions. A minor inconsistency exists between the 'E-Procurement' characteristic and the 'No e-submission' automated flag, though the former is assumed correct. The main consistency issue lies in the discrepancy between document summaries mentioning 'evaluation criteria' and the AI-extracted requirements stating they are not provided.

•Discrepancy between document summaries and AI-extracted requirements regarding evaluation criteria and specific requirements.
Sustainability20/100

The tender does not include any explicit green procurement, social aspects, or innovation focus. It is also not indicated as EU funded, which often correlates with higher sustainability standards.

•No green procurement criteria.
•No social criteria.

Strengths

Clear tender title and description.
Open procedure and E-Procurement enabled.
Reasonable submission deadline (17 days).
CPV code and NUTS code provided.
Tender is divided into parts, potentially encouraging broader participation.

Concerns

Estimated value not disclosed.
Lack of specific eligibility, technical, and financial requirements in the AI summary.
Missing or unclear evaluation criteria.
Restricted document access (if documents are not easily available).
No sustainability (green, social, innovation) considerations.

Recommendations

1. Ensure all specific eligibility, technical, and financial requirements, along with clear evaluation criteria, are explicitly detailed and easily accessible in the tender documents.
2. Disclose the estimated value to provide better context for potential bidders.
3. Provide direct links to all tender documents for improved accessibility and transparency.

AI Scoring Preview

Sign up to view complete requirements and analysis

Complete quality score analysis
Detailed sub-score breakdown
Strengths & concerns insights
Strategic recommendations

No credit card required • Setup in 2 minutes