Want tender expert help? See our tender preparation service
Tenders

Construction of a hybrid lamp at the bridge over the Kłodnica River on the cycling route from Jesienna Street to Kujawska Street in a design and build system

Closed

Updated October 16, 2026

Submission Deadline Has Passed

This tender's submission deadline has passed and is no longer accepting applications. The information below is kept for reference purposes.

Browse Active Tenders
Deadline
Expired
March 30, 2026
Contract Details
Category
Construction
Reference
2026/BZP 00153206/01
Value
Not disclosed
Location
Śląskie, Poland
Published
October 10, 2026
Organization
CPV Code
Project Timeline

Tender Published

March 12, 2026

Deadline for Questions

March 23, 2026

Submission Deadline

March 30, 2026

Win ProbabilityPRO
🔒
Upgrade to Professional
See your estimated win probability based on historical data.
Upgrade to Professional →
Buyer IntelligencePRO
🔒
Unlock Buyer Intelligence
See spending patterns, preferred procedures, and more.
Upgrade to Professional →
Sector InsightsPRO
🔒
Unlock Sector Insights
See average winning prices, competition levels, and market trends.
Upgrade to Professional →

Key facts

Deadline
Expired
CPV Code
45316110-9 — Installation of road lighting equipment
Budget
Not disclosed
Duration
36 months
Location
Śląskie
Type
Construction
75
Quality Score/100
Good
Market Benchmark
Avg. Winning Price
€12,641,706
Avg. Bids
0.1
Competition
Low
SME Winners
86%
133,693 tenders analyzed

Original Tender Description

Construction of a hybrid lamp at the bridge over the Kłodnica River on the cycling route from Jesienna Street to Kujawska Street in a design and build system

Run Risk Analysis

Identify potential risks, inconsistencies, and red flags across all tender documents. Get a detailed risk report with severity levels and mitigation recommendations.

Login

Win Strategy

AI-powered analysis of this tender's requirements, opportunities, and challenges. Get strategic insights to maximize your win probability.

60%
Estimated Win ProbabilityModerate Fit

This 'Design and Build' tender for a hybrid lamp on a pedestrian bridge presents a moderate competition opportunity. A winning strategy will focus on demonstrating technical expertise in hybrid lighting solutions and efficient project delivery, while proactively addressing the lack of specified evaluation criteria by assuming a balanced approach and emphasizing value.

Key Winning Messages

Reliable and sustainable hybrid lighting solution for enhanced cyclist safety and environmental responsibility.

Efficient and integrated 'Design and Build' approach ensuring timely project completion and cost-effectiveness.

Commitment to quality and long-term performance of the hybrid lighting infrastructure.

Key Opportunities
Lack of specified evaluation criteria allows for proactive definition of value proposition.
Opportunity to propose innovative hybrid energy solutions beyond basic requirements.
Long contract duration (36 months) allows for focus on long-term operational efficiency and maintenance planning.
Key Challenges
Absence of detailed technical specifications and evaluation criteria creates uncertainty.

Develop a comprehensive technical proposal based on best practices for hybrid lighting and assume a balanced evaluation approach (e.g., 50% technical, 50% price, or similar). Proactively seek clarification if possible, or make reasonable assumptions and clearly state them in the bid.

Potential for high competition due to the 'Design and Build' nature and public procurement.

Focus on demonstrating superior technical design, robust project management, and a competitive yet sustainable pricing strategy. Highlight any unique expertise or past performance relevant to similar projects.

Ideal Bidder Profile
An experienced civil engineering and construction firm with a proven track record in public infrastructure projects, specifically in lighting installations and 'Design and Build' contracts. The ideal bidder will possess expertise in hybrid energy systems (solar/wind), structural design for bridges, and a strong understanding of local regulations and environmental considerations in Gliwice.
Key Requirements
Design and Build capability for hybrid lighting system
Installation of road lighting equipment (CPV: 45316110-9)
Compliance with contract terms (Załącznik nr 7 do SWZ - wzór umowy.pdf)
Adherence to data protection regulations (RODO)
Key Discriminators
Demonstrated expertise in designing and implementing hybrid (solar/wind) lighting systems, including energy storage and grid integration.
A highly efficient and integrated 'Design and Build' methodology with a clear project timeline and risk management plan.
Proactive identification and mitigation of potential environmental impacts during the design and construction phases, even if not explicitly required.
A strong understanding of the local context in Gliwice, including potential integration with existing infrastructure and community needs.
Social Value Opportunities
Commit to employing local labor during the construction phase, prioritizing individuals from disadvantaged groups where feasible. Quantify the number of local jobs to be created and the duration of employment.
Bid Focus Areas
Technical Solution (Design & Build)

Develop a detailed and innovative design for the hybrid lamp, emphasizing energy efficiency, reliability, and low maintenance. Clearly articulate the 'Build' phase plan, including construction methodologies, quality control, and safety protocols. Highlight the expertise of the design and construction teams.

Price

Provide a competitive price that reflects the value offered. Conduct thorough cost estimation, considering all design, material, labor, and overhead costs. Include contingency for unforeseen issues, but ensure the price remains attractive. Clearly break down costs where possible to demonstrate transparency.

Project Management & Delivery

Present a robust project management plan outlining clear milestones, resource allocation, communication strategies, and risk mitigation. Emphasize the team's experience in delivering similar projects on time and within budget. Showcase a proactive approach to stakeholder engagement.

Recommendations6
Develop a Comprehensive Technical Design for Hybrid Lighting
CriticalHigh effort

Given the 'Design and Build' nature and the mention of a 'hybrid lamp', a detailed and innovative technical proposal is paramount. This should include specifications for solar panels, wind turbines (if applicable), battery storage, control systems, and the lighting fixtures themselves. The design should prioritize energy efficiency, durability, and low maintenance, considering the specific location and environmental conditions near the Kłodnica River.

Directly addresses the core requirement and demonstrates technical capability, forming the basis of the bid's value proposition.
Assume a Balanced Evaluation Approach and Emphasize Value
CriticalMed effort

Since evaluation criteria are not specified, assume a balanced weighting between technical merit and price. Focus on demonstrating superior technical solutions that justify the proposed price. Highlight the long-term benefits of the chosen hybrid system, such as reduced operational costs and environmental impact, to create a strong value proposition.

Maximizes scoring potential by proactively addressing the most likely evaluation factors.
Showcase Expertise in 'Design and Build' Project Management
HighMed effort

Highlight the bidder's experience and methodology for managing integrated 'Design and Build' projects. This includes a clear project plan, risk assessment and mitigation strategies, quality assurance processes, and a proven track record of timely delivery. A well-articulated project management approach will instill confidence in the contracting authority.

Builds trust and demonstrates the bidder's ability to execute the project efficiently and reliably.
Proactively Address Potential Environmental Considerations
MediumLow effort

Even though 'Green Procurement' is marked as 'No', proactively consider and detail any environmental mitigation measures during the design and construction phases. This could include minimizing disruption to the river ecosystem, managing construction waste responsibly, and selecting materials with lower environmental impact. This demonstrates corporate responsibility and can be a subtle differentiator.

Enhances the bidder's image and may indirectly influence the contracting authority's perception of quality and responsibility.
Clarify Ambiguities in Tender Documents
HighLow effort

If possible, seek clarification from the contracting authority regarding any ambiguities in the tender documents, particularly concerning technical requirements or the absence of evaluation criteria. If clarification is not feasible, clearly state any assumptions made in the bid proposal.

Reduces the risk of misinterpretation and ensures the bid accurately addresses the contracting authority's needs.
Commit to Local Employment and Training
MediumLow effort

Include a commitment to utilize local labor for a significant portion of the construction workforce, potentially prioritizing individuals from disadvantaged backgrounds or offering apprenticeships. Quantify the expected number of local jobs and the duration of employment. This aligns with broader public procurement goals even if not explicitly mandated.

Adds value beyond the core technical and price requirements, potentially influencing subjective evaluation factors.
Competitive Positioning
Position the bidder as a specialist in integrated 'Design and Build' solutions for public infrastructure, with a particular focus on innovative and sustainable lighting technologies. Emphasize a proven track record of delivering complex projects on time and within budget for municipal clients. Highlight the technical expertise of the design team in hybrid energy systems and the construction team's experience in bridge-related works.

Competitors

Upgrade to see which companies are likely to bid on this tender, based on historical procurement data.

Login

Requirements & Qualifications

5 requirements across 5 categories

Submission (1)
Mandatory (1)
Compliance (1)
Technical (1)
Financial (1)
SUBMISSION REQUIREMENTS1
--No information
MANDATORY EXCLUSION GROUNDS1
--No information
ELIGIBILITY REQUIREMENTS1
--No information
TECHNICAL CAPABILITY REQUIREMENTS1
--No information
FINANCIAL REQUIREMENTS1
--No information

Requirements Preview

Sign up to view complete requirements and analysis

Documents

10 documents available with AI summaries

Notice PDFPDF
08de804d-5df0-0866-056e-e50001ac8112.pdf

This document is a tender notice for the construction of a hybrid lamp near a bridge over the Kłodnica River as part of a design-and-build bicycle route project in Gliwice, Poland.

Załącznik nr 3.docxDOC
Załącznik nr 3.docx -- 17.5 KB

No content extracted

Załącznik nr 5a.docxDOC
Załącznik nr 5a.docx -- 13.6 KB

No content extracted

Załącznik nr 5b.docxDOC
Załącznik nr 5b.docx -- 14.2 KB

No content extracted

Załącznik nr 5.docxDOC
Załącznik nr 5.docx -- 14.5 KB

No content extracted

Załącznik nr 6.docxDOC
Załącznik nr 6.docx -- 13.7 KB

No content extracted

Załącznik nr 7 do SWZ - wzór umowy.pdfPDF
Załącznik nr 7 do SWZ - wzór umowy.pdf -- 751.9 KB

No content extracted

Złącznik nr 7- RODO (art. 13).docxDOC
Złącznik nr 7- RODO (art. 13).docx -- 24.3 KB

No content extracted

Złącznik nr 8 - RODO (art. 14).docxDOC
Złącznik nr 8 - RODO (art. 14).docx -- 25.1 KB

No content extracted

SWZ wraz z załącznikami.zipZIP
SWZ wraz z załącznikami.zip

No summary available for this document.

Documents Preview

Sign up to view document summaries and analysis

75
Good

Tender Quality Score

This tender for a design-and-build hybrid lamp project in Gliwice is generally well-structured, with clear documentation and a reasonable process. However, the absence of disclosed evaluation criteria and financial details slightly impacts its overall quality.

Score Breakdown

Legal Compliance75/100

The tender adheres to general legal compliance by providing a clear procedure, a proper CPV code, and indicating no current disputes. The deadlines appear reasonable within the context of Polish procurement law, though the submission deadline is relatively short. Regulatory compliance is assumed based on the provided information.

Clarity80/100

The description of the project is clear, and the 'design and build' system is specified. While the core requirements are understandable, the absence of explicit technical, eligibility, financial, and submission requirements within the AI-extracted section means that detailed criteria are not immediately apparent in this summary, relying on the attached documents.

•Detailed eligibility, technical, financial, and submission requirements are not explicitly listed in the AI-extracted section.
Completeness70/100

Most basic information is present, including the title, reference, organization, type, CPV code, and contract duration. However, the estimated value is not disclosed, which is a significant omission. The contract duration is specified with a range for warranty/guarantee, which is good, but the overall completeness is hampered by the missing financial information.

•Estimated value is not disclosed.
Fairness85/100

The tender is conducted via e-procurement, promoting accessibility. The value is not disclosed, which can be a concern for fairness, but the absence of tailored requirements for specific companies is a positive. Objective criteria for evaluation are not explicitly stated, which is a drawback.

•Evaluation criteria are not specified.
Practicality65/100

The tender utilizes e-procurement, which is practical. The contract start date is not explicitly mentioned, but the contract duration is provided. Financing information is not disclosed, and while the contract duration is specified, the lack of a clear start date and financing details reduces practicality.

•Contract start date is not specified.
•Financing information is not disclosed.
Data Consistency90/100

Key fields such as title, reference, organization, CPV, and deadlines are populated. There are no indications of suspension or disputes. The dates provided are logical, with the submission deadline preceding the contract duration. The consistency of the data presented is high.

Sustainability50/100

There is no explicit mention of green procurement, social aspects, or innovation within the provided tender summary. The tender is not indicated as EU-funded. Therefore, sustainability aspects are not a focus of this procurement.

•No explicit green procurement criteria.
•No explicit social criteria.

Strengths

Clear project description and 'design and build' system.
E-procurement utilized.
Proper CPV code provided.
Contract duration and warranty/guarantee terms specified.
No disputes or suspensions indicated.

Concerns

Estimated value not disclosed.
Evaluation criteria not specified.
Detailed eligibility, technical, financial, and submission requirements not explicitly listed in summary.
Lack of explicit sustainability focus.

Recommendations

1. Disclose the estimated value of the contract.
2. Clearly state the evaluation criteria to enhance transparency.
3. Provide more explicit details on eligibility, technical, financial, and submission requirements within the summary or ensure easy access to these in the documents.

AI Scoring Preview

Sign up to view complete requirements and analysis

Complete quality score analysis
Detailed sub-score breakdown
Strengths & concerns insights
Strategic recommendations

No credit card required • Setup in 2 minutes