Want tender expert help? See our tender preparation service
Tenders

Development of design and cost documentation for the task of "Waterproofing of the buildings of the District Court in Płock at pl. G. Narutowicza 4 and 6" including obtaining a building permit decision

Closed

Updated October 16, 2026

Submission Deadline Has Passed

This tender's submission deadline has passed and is no longer accepting applications. The information below is kept for reference purposes.

Browse Active Tenders
Deadline
Expired
March 27, 2026
Contract Details
Category
Services
Reference
2026/BZP 00157666/01
Value
Not disclosed
Location
Mazowiecki regionalny, Poland
Published
October 10, 2026
CPV Code
Project Timeline

Tender Published

March 17, 2026

Deadline for Questions

March 20, 2026

Submission Deadline

March 27, 2026

Win ProbabilityPRO
🔒
Upgrade to Professional
See your estimated win probability based on historical data.
Upgrade to Professional →
Buyer IntelligencePRO
🔒
Unlock Buyer Intelligence
See spending patterns, preferred procedures, and more.
Upgrade to Professional →
Sector InsightsPRO
🔒
Unlock Sector Insights
See average winning prices, competition levels, and market trends.
Upgrade to Professional →

Key facts

Deadline
Expired
CPV Code
71000000-8 — Architectural, construction, engineering and inspection services
Lots
Divided into lots
Budget
Not disclosed
Duration
6 months
Location
Mazowiecki regionalny
Type
Services
75
Quality Score/100
Good
Market Benchmark
Avg. Winning Price
€496,142
Avg. Bids
0.6
Competition
Low
SME Winners
93%
25,840 tenders analyzed

Original Tender Description

Development of design and cost documentation for the task of "Waterproofing of the buildings of the District Court in Płock at pl. G. Narutowicza 4 and 6" including obtaining a building permit decision

Run Risk Analysis

Identify potential risks, inconsistencies, and red flags across all tender documents. Get a detailed risk report with severity levels and mitigation recommendations.

Login

Win Strategy

AI-powered analysis of this tender's requirements, opportunities, and challenges. Get strategic insights to maximize your win probability.

65%
Estimated Win ProbabilityModerate Fit

This tender requires the development of design and cost estimation documentation for building waterproofing at the Płock District Court, including obtaining a building permit. The lack of specified evaluation criteria and detailed requirements presents an opportunity for a bidder to proactively define their value proposition. Success hinges on demonstrating strong technical capability in architectural/engineering design and a clear understanding of the permitting process, while leveraging the absence of explicit social/green procurement to focus on core technical excellence.

Key Winning Messages

Expertise in comprehensive design and permitting for critical infrastructure waterproofing.

Streamlined process for obtaining building permits, ensuring project timeline adherence.

Cost-effective and technically sound design solutions tailored to the specific needs of the Płock District Court.

Key Opportunities
Proactive definition of value proposition due to unspecified evaluation criteria.
Leveraging the absence of explicit green/social value requirements to focus on core technical excellence and cost-effectiveness.
Demonstrating a deep understanding of the local permitting process in Płock (NUTS: PL923).
Highlighting experience with similar public sector buildings or heritage sites.
Key Challenges
Absence of specified evaluation criteria makes it difficult to tailor the bid precisely.

Focus on demonstrating superior technical competence, a clear understanding of the project's objectives, and a robust methodology for design and permitting. Assume the Contracting Authority will prioritize technical merit and timely delivery.

Potential for a highly competitive bid due to the straightforward nature of the service and lack of explicit differentiators.

Emphasize a strong track record, a clear and concise proposal, and a competitive yet realistic pricing strategy. Highlight any unique expertise in waterproofing complex building structures.

Ensuring all mandatory exclusion grounds and eligibility requirements are meticulously addressed, even if not explicitly detailed in the provided snippets.

Conduct thorough due diligence on all legal and regulatory requirements for public procurement in Poland. Double-check all declarations and supporting documents for accuracy and completeness.

Ideal Bidder Profile
A specialized architectural and engineering firm with proven experience in public sector projects, specifically in the design and permitting of building renovations and waterproofing solutions. The ideal bidder possesses a strong track record of successfully navigating Polish building permit procedures and has a deep understanding of construction materials and techniques relevant to historical or significant public buildings. They should also have a robust internal quality control system for design documentation.
Key Requirements
Development of design and cost estimation documentation for waterproofing.
Obtaining a building permit decision.
Compliance with mandatory exclusion grounds (art. 108, 109 ustawy Pzp and art. 7 ust. 1 ustawy z dnia 13 kwietnia 2022 r.).
Demonstration of eligibility and technical capability (implied by the nature of the service).
Proper submission of all required documents and declarations (e.g., initial contractor statement, PUZ commitment, service list).
Key Discriminators
Demonstrated expertise in navigating the specific building permit procedures for the Płock region.
A highly experienced project team with a proven track record in similar waterproofing projects for public institutions.
A clear and efficient methodology for developing design documentation and managing the permit acquisition process, ensuring timely delivery within the 6-month timeframe.
Social Value Opportunities
While not explicitly required, consider a brief mention of commitment to employing local skilled labor for any site-specific surveys or consultations, if applicable, to subtly align with broader public sector expectations.
Bid Focus Areas
Technical Capability (Design & Permitting)

Provide a detailed methodology for the design process, including site analysis, material selection, and adherence to relevant building codes. Clearly outline the steps and timeline for obtaining the building permit, referencing experience with similar authorities or processes. Showcase the qualifications and experience of the key personnel who will be assigned to the project.

Understanding of Project Scope

Demonstrate a thorough understanding of the specific challenges related to waterproofing existing court buildings. This includes acknowledging potential complexities of older structures and the need for durable, long-term solutions. Highlight how the proposed design will address these specific challenges.

Compliance and Documentation

Ensure all submitted documents, including the initial contractor statement (załącznik nr 3) and any required service lists (załącznik nr 5), are perfectly completed and signed. Pay meticulous attention to detail in all declarations to avoid any grounds for exclusion. Clearly articulate the process for obtaining and submitting required evidence for eligibility and capability.

Recommendations7
Thoroughly Address All Exclusion Grounds
CriticalMed effort

Scrutinize all mandatory exclusion grounds listed in Article 108 and 109 of the Public Procurement Law (Ustawa Pzp), as well as Article 7 of the law concerning Ukraine. Ensure the initial contractor statement (załącznik nr 3) is completed accurately and comprehensively, declaring no grounds for exclusion or detailing any remedial actions taken.

Prevents immediate disqualification.
Proactively Define Value Proposition
CriticalHigh effort

Given the absence of specified evaluation criteria, assume the Contracting Authority will prioritize technical expertise, timely delivery, and a clear understanding of the permitting process. Structure the bid to highlight these aspects prominently, showcasing a robust methodology for design and permit acquisition.

Maximizes perceived value and relevance to the Contracting Authority's likely priorities.
Showcase Local Permitting Expertise
HighMed effort

Highlight specific experience or knowledge of the building permit process within the Płock region (NUTS: PL923). This could include familiarity with local planning authorities or specific challenges encountered and overcome in similar projects in the area.

Builds confidence in the bidder's ability to deliver the permit within the timeframe.
Develop a Detailed Project Execution Plan
HighHigh effort

Outline a clear, step-by-step plan for developing the design documentation and obtaining the building permit. Include realistic timelines, key milestones, and the roles of assigned personnel. This demonstrates project management capability and commitment to the 6-month duration.

Provides clarity and assurance to the Contracting Authority.
Prepare for Potential Eligibility/Capability Requirements
HighMed effort

Although not explicitly detailed, prepare to demonstrate technical capability and eligibility. This includes having a well-prepared service list (załącznik nr 5) and being ready to provide evidence of relevant experience, qualifications of personnel, and potentially financial capacity if required later.

Ensures readiness for potential requests for additional documentation.
Leverage Subcontractor Information (if applicable)
MediumMed effort

If relying on subcontractors, ensure the 'OŚWIADCZENIE DOTYCZĄCE PODWYKONAWCY' section in załącznik nr 3 is meticulously completed. Also, ensure the PUZ commitment (załącznik nr 6) from any resource-providing entity is correctly executed and signed.

Ensures compliance with subcontracting rules and proper utilization of external resources.
Focus on Durability and Long-Term Value
MediumLow effort

While not a green procurement tender, emphasize the long-term durability and effectiveness of the proposed waterproofing solutions. This demonstrates foresight and a commitment to providing a lasting benefit to the court buildings, which can be a subtle differentiator.

Positions the bidder as a provider of high-quality, sustainable solutions.
Competitive Positioning
Position as the most technically proficient and reliable partner for critical infrastructure design and permitting. Emphasize a proven ability to navigate complex regulatory environments and deliver results on time and within budget, even without explicit evaluation criteria guiding the bid.

Competitors

Upgrade to see which companies are likely to bid on this tender, based on historical procurement data.

Login

Requirements & Qualifications

5 requirements across 5 categories

Submission (1)
Mandatory (1)
Compliance (1)
Technical (1)
Financial (1)
SUBMISSION REQUIREMENTS1
--No information in the provided text.
MANDATORY EXCLUSION GROUNDS1
--No information in the provided text.
ELIGIBILITY REQUIREMENTS1
--No information in the provided text.
TECHNICAL CAPABILITY REQUIREMENTS1
--No information in the provided text.
FINANCIAL REQUIREMENTS1
--No information in the provided text.

Requirements Preview

Sign up to view complete requirements and analysis

Documents

13 documents available with AI summaries

Notice PDFPDF
08de83fe-4630-821a-056e-e500011b65bf.pdf

This document is a tender notice for the development of design and cost documentation for the waterproofing of the District Court buildings in Płock, including obtaining a building permit.

SWZ dok. proj. hydroizolacja.pdfPDF
SWZ dok. proj. hydroizolacja.pdf

No summary available for this document.

Załącznik nr 1 do SWZ opirz przedmiotu zamówienia.zipZIP
Załącznik nr 1 do SWZ opirz przedmiotu zamówi...

No summary available for this document.

załącznik nr 2.1 do SWZ Formularz ofertowy, informacje dodatkowe.docxDOC
załącznik nr 2.1 do SWZ Formularz ofertowy, i...

No summary available for this document.

załącznik nr 3.1 do SWZ oświadczenie wstępne PUZ.docxDOC
załącznik nr 3.1 do SWZ oświadczenie wstępne ...

No summary available for this document.

załącznik nr 3 do SWZ oświadczenie wstępne Wykonawcy.docxDOC
załącznik nr 3 do SWZ oświadczenie wstępne Wy...

No summary available for this document.

załącznik nr 4 do SWZ projekt umowy.pdfPDF
załącznik nr 4 do SWZ projekt umowy.pdf

No summary available for this document.

załącznik nr 5 do SWZ - wykaz usług.docxDOC
załącznik nr 5 do SWZ - wykaz usług.docx

No summary available for this document.

załącznik nr 6 do SWZ zobowiązanie PUZ.docxDOC
załącznik nr 6 do SWZ zobowiązanie PUZ.docx

No summary available for this document.

załącznik nr 7 do SWZ oświadczenie wykonawców ubiegajaych się wspólnie o udziele...DOC
załącznik nr 7 do SWZ oświadczenie wykonawców...

No summary available for this document.

załącznik nr 8.1 do SWZ oświadczenie PUZ o aktulaności informacji.docxDOC
załącznik nr 8.1 do SWZ oświadczenie PUZ o ak...

No summary available for this document.

załącznik nr 8 do SWZ - oswiadczenie o aktualności art 125.docDOC
załącznik nr 8 do SWZ - oswiadczenie o aktual...

No summary available for this document.

załącznik nr 9 do SWZ - oswiadczenie o grupie kapitałowej.docDOC
załącznik nr 9 do SWZ - oswiadczenie o grupie...

This document is a statement of capital group affiliation required from the bidder for the tender concerning the design and cost estimation documentation for waterproofing works at the District Court in Płock.

Documents Preview

Sign up to view document summaries and analysis

75
Good

Tender Quality Score

This tender for design and cost documentation for waterproofing works at the District Court in Płock is generally well-structured, with a clear description and ample documentation. However, it lacks specific evaluation criteria and details on e-submission, impacting practicality and fairness.

Score Breakdown

Legal Compliance75/100

The tender adheres to general legal requirements with a clear CPV code and a specified procedure. Deadlines appear reasonable given the scope, and there's no indication of disputes. The presence of numerous attached documents suggests a structured approach to regulatory compliance.

Clarity80/100

The tender title and description are clear, outlining the specific project. The availability of 13 documents, including a tender notice and project scope, contributes to clarity. However, the absence of explicit evaluation criteria leaves some ambiguity for bidders.

•Missing evaluation criteria
Completeness70/100

Most basic information is present, including the organization, title, and contract duration. The estimated value is not disclosed, which is a significant omission. While many documents are attached, the lack of financial details impacts overall completeness.

•Estimated Value not disclosed
Fairness85/100

The tender is characterized by e-procurement, which promotes fairness. The full document access and clear project scope are positive. However, the lack of disclosed estimated value and the absence of explicit evaluation criteria could be perceived as less transparent, though no specific company tailoring is evident.

•Value not disclosed
•Missing evaluation criteria
Practicality65/100

The tender is marked as 'E-Procurement', suggesting electronic submission is likely intended, but this is not explicitly stated as a requirement. The contract start date is not specified. The financing information is also missing, which can hinder practical planning for bidders.

•No explicit e-submission requirement stated
•Contract start date not specified
Data Consistency90/100

Key fields such as title, reference number, organization, and deadline are populated. The dates are logical, and there are no reported suspensions or disputes. The CPV code is correctly assigned.

Sustainability50/100

The tender does not explicitly mention any green procurement, social aspects, or innovation focus. It is also not indicated as EU funded, suggesting a lack of emphasis on these modern procurement characteristics.

•Not green procurement
•No social criteria

Strengths

Clear project description and title
Ample attached documentation
E-Procurement characteristic
Correct CPV code provided

Concerns

Estimated value not disclosed
Missing evaluation criteria
Lack of explicit e-submission requirement
No sustainability or innovation focus

Recommendations

1. Disclose the estimated value of the contract.
2. Clearly define the evaluation criteria for bids.
3. Specify the e-submission process and contract start date.

AI Scoring Preview

Sign up to view complete requirements and analysis

Complete quality score analysis
Detailed sub-score breakdown
Strengths & concerns insights
Strategic recommendations

No credit card required • Setup in 2 minutes