Want tender expert help? See our tender preparation service
Tenders

Supply and installation of batteries for the solar power plant at Ventspils City Council administration building

Closed

Updated November 18, 2026

Submission Deadline Has Passed

This tender's submission deadline has passed and is no longer accepting applications. The information below is kept for reference purposes.

Browse Active Tenders
Deadline
Expired
February 12, 2026
Contract Details
Category
Supplies
Reference
164465
Value
Not disclosed
Location
Kurzeme, Latvia
Published
January 27, 2026
CPV Code
Project Timeline

Tender Published

January 27, 2026

Deadline for Questions

February 05, 2026

Submission Deadline

February 12, 2026

Tender Opening

February 12, 2026

Win ProbabilityPRO
🔒
Upgrade to Professional
See your estimated win probability based on historical data.
Upgrade to Professional →
Sector InsightsPRO
🔒
Unlock Sector Insights
See average winning prices, competition levels, and market trends.
Upgrade to Professional →

Key facts

Deadline
Expired
CPV Code
31434000 — Lithium accumulators
Procedure
Open procedure
Budget
Not disclosed
Duration
2 months
Location
Kurzeme
Type
Supplies
75
Quality Score/100
Good
Market Benchmark
Avg. Winning Price
€81,103
Avg. Bids
1.8
Competition
Low
SME Winners
90%
1,653 tenders analyzed

Original Tender Description

Supply and installation of batteries for the solar power plant at Ventspils City Council administration building

Run Risk Analysis

Identify potential risks, inconsistencies, and red flags across all tender documents. Get a detailed risk report with severity levels and mitigation recommendations.

Login

Win Strategy

Get an AI-powered winning strategy tailored to this tender. Includes win probability score, key opportunities and challenges, recommended bid focus areas, competitive positioning insights, and actionable recommendations to maximize your chances.

Login

Competitors

Upgrade to see which companies are likely to bid on this tender, based on historical procurement data.

Login

Requirements & Qualifications

13 requirements across 5 categories

Submission (3)
Mandatory (1)
Compliance (1)
Technical (7)
Financial (1)
SUBMISSION REQUIREMENTS3
--Proposals must be submitted by the deadline: 2026-02-12T10:00:00.
--Proposals must adhere to the submission requirements outlined in the main tender document.
--Proposals will be evaluated based on the criteria detailed in the document "Iepirkuma priekšmeta prasības, 1.versija".
MANDATORY EXCLUSION GROUNDS1
--Bidders must not meet any of the exclusion grounds specified in the document "Iepirkuma priekšmeta prasības, 1.versija".
ELIGIBILITY REQUIREMENTS1
--Bidders must meet the selection requirements specified in the document "Iepirkuma priekšmeta prasības, 1.versija".
TECHNICAL CAPABILITY REQUIREMENTS7
--Bidders must be capable of supplying and installing lithium batteries for a solar power station at the Ventspils City Council administration building.
--Bidders must meet the technical specifications for the lithium batteries.
--Bidders must meet the requirements for battery installation.
FINANCIAL REQUIREMENTS1
--Bidders must meet the financial requirements specified in the document "Iepirkuma priekšmeta prasības, 1.versija".

Requirements Preview

Sign up to view complete requirements and analysis

Documents

2 documents available with AI summaries

Iepirkuma priekšmeta prasības, 1.versijaPDF
164465_PD.ANY_1_1_1_20260127155737.pdf -- 96.3 KB

This document contains the procurement requirements for the supply and installation of batteries for a solar power plant in Ventspils, detailing exclusion, selection, technical, financial, and other requirements, as well as the criteria for evaluating proposals.

Nolikums ar pielikumiemPDF
VKP 2026-007A 1. pielikums - Tehniskas specif... -- 355.8 KB

This document contains the technical specifications for the supply and installation of lithium batteries for a solar power station at the Ventspils City Council administration building, including requirements for installation, connection, documentation, and warranties.

Documents Preview

Sign up to view document summaries and analysis

75
Good

Tender Quality Score

This tender for solar power station battery supply and installation is well-defined in its scope and leverages e-procurement, but transparency is hampered by an undisclosed estimated value and potential document access restrictions.

Score Breakdown

Legal Compliance75/100

The tender defines a clear open procedure with a reasonable submission period and appropriate CPV codes. However, the undisclosed estimated value and the flag for "Restricted document access" raise concerns regarding full compliance with transparency principles.

•Undisclosed estimated value
•Restricted document access
Clarity80/100

The project description is clear, and requirements are well-structured, referencing specific documents for details. While the automated check flags "No evaluation criteria specified," the AI summary of Document 3 indicates these criteria are detailed within, suggesting a presentation rather than a complete absence issue.

•Ambiguity regarding the immediate visibility of evaluation criteria
Completeness70/100

Essential information such as title, organization, deadlines, duration, and location is provided. However, the estimated value is not disclosed, and the clarity issue regarding evaluation criteria also impacts the overall completeness of readily available information.

•Estimated value not disclosed
Fairness85/100

The tender benefits from an open procedure and e-procurement, promoting equal access. Requirements do not appear tailored. However, the undisclosed estimated value and the "Restricted document access" flag (even if content was summarized) pose potential barriers to full transparency and fair competition.

•Undisclosed estimated value
•Restricted document access
Practicality65/100

Electronic submission is supported, which is a significant practical advantage. The duration is specified, but the estimated value and a specific contract start date are missing, which can hinder practical planning for bidders.

•Estimated value not disclosed
•Contract start date not specified
Data Consistency90/100

Key dates are logical, and there are no reported disputes or suspensions. While some automated flags contradict other information (e.g., e-submission), these appear to be anomalies or interpretation differences rather than fundamental data inconsistencies.

•Contradictory "No e-submission" flag from automated checks
Sustainability50/100

The procurement's subject, the supply and installation of batteries for a solar power station, inherently contributes to environmental sustainability. However, the tender documents do not explicitly include additional green, social, or innovation-focused procurement criteria.

•No explicit additional green, social, or innovation criteria

Strengths

Clear project description for a solar power station
Structured and referenced requirements
E-procurement enabled for submission
Reasonable submission deadline
Project inherently supports environmental sustainability

Concerns

Estimated value is not disclosed
"Restricted document access" flag
Ambiguity regarding the immediate visibility of evaluation criteria
Lack of explicit additional sustainability, social, or innovation criteria
Contradictory "No e-submission" flag from automated checks

Recommendations

1. Disclose the estimated value to enhance transparency.
2. Ensure all tender documents are fully and easily accessible.
3. Clearly state evaluation criteria in the main tender notice.

AI Scoring Preview

Sign up to view complete requirements and analysis

Complete quality score analysis
Detailed sub-score breakdown
Strengths & concerns insights
Strategic recommendations

No credit card required • Setup in 2 minutes