Want tender expert help? See our tender preparation service
Tenders

Construction project "Improvement of capacity and quality of rainwater collection systems of the Garozas Street rainwater collector's catchment basin and development of 'green' solutions and author's supervision"

Closed

Updated October 14, 2026

Submission Deadline Has Passed

This tender's submission deadline has passed and is no longer accepting applications. The information below is kept for reference purposes.

Browse Active Tenders
Deadline
Expired
March 30, 2026
Contract Details
Category
Services
Reference
165513
Value
Not disclosed
Location
Zemgale, Latvia
Published
February 26, 2026
CPV Code
Evaluation Criteria
Lowest offered pricePrice
Experience of the construction design development managerExperience
Project Timeline

Tender Published

February 26, 2026

Deadline for Questions

March 23, 2026

Submission Deadline

March 30, 2026

Tender Opening

March 30, 2026

Win ProbabilityPRO
🔒
Upgrade to Professional
See your estimated win probability based on historical data.
Upgrade to Professional →
Sector InsightsPRO
🔒
Unlock Sector Insights
See average winning prices, competition levels, and market trends.
Upgrade to Professional →

Key facts

Deadline
Expired
CPV Code
71320000 — Engineering design services
Procedure
Open procedure
Budget
Not disclosed
Duration
7 months
Location
Zemgale
Type
Services
75
Quality Score/100
Good
Market Benchmark
Avg. Winning Price
€83,543
Avg. Bids
3.3
Competition
Medium
SME Winners
100%
7,536 tenders analyzed

Original Tender Description

Construction project "Improvement of capacity and quality of rainwater collection systems of the Garozas Street rainwater collector's catchment basin and development of 'green' solutions and author's supervision"
EU Funded

Run Risk Analysis

Identify potential risks, inconsistencies, and red flags across all tender documents. Get a detailed risk report with severity levels and mitigation recommendations.

Login

Win Strategy

AI-powered analysis of this tender's requirements, opportunities, and challenges. Get strategic insights to maximize your win probability.

65%
Estimated Win ProbabilityModerate Fit

This tender focuses on technical expertise in rainwater collection system design and author supervision, with price being the primary evaluation factor. A winning strategy will emphasize demonstrating superior technical capability and offering a highly competitive price, while subtly highlighting potential 'green' solution benefits even if not explicitly mandated.

Key Winning Messages

Proven Expertise in Advanced Drainage Solutions and Seamless Project Oversight.

Cost-Effective Excellence for Jelgava's Water Infrastructure.

Key Opportunities
Leveraging 'green' solutions expertise to add value beyond explicit requirements.
Demonstrating a highly experienced and competent construction design development manager.
Capitalizing on the 'lowest offered price' as the primary evaluation criterion.
Key Challenges
The tender is heavily weighted towards price, potentially squeezing margins.

Conduct thorough cost analysis to identify efficiencies and optimize resource allocation. Explore innovative, cost-effective design and supervision methodologies. Clearly articulate the value proposition to justify the price.

Lack of explicit weighting for technical criteria means strong technical proposals might not be sufficiently rewarded if price is significantly higher.

Ensure the technical proposal is robust and clearly demonstrates compliance and expertise, even if not explicitly weighted. Focus on showcasing the experience of the design development manager as per the stated criterion. Frame technical strengths as enablers of cost-effective and high-quality delivery.

The conditional nature of the contract award (dependent on funding) introduces uncertainty.

Acknowledge this condition in the bid and express understanding. Focus on preparing a strong, compliant bid that is ready for submission should funding be secured. Maintain communication channels with the contracting authority if possible to gauge funding status.

Ideal Bidder Profile
A specialized engineering consultancy with a proven track record in hydrological infrastructure design, urban drainage systems, and construction project author supervision. The ideal bidder will have a strong portfolio of similar projects, particularly those involving capacity and quality improvements, and a team with extensive experience in managing complex construction oversight. They should also possess the agility to offer a cost-effective solution.
Key Requirements
Experience of the construction design development manager
Procurement requirements for improving the capacity and quality of rainwater collection systems and developing 'green' solutions
Author supervision to be carried out from the day the object is handed over to the construction contractor until the day the object is accepted into operation
Lowest offered price
Key Discriminators
Demonstrated ability to integrate cost-effective 'green' solutions that enhance system longevity and environmental performance, even if not a primary evaluation factor.
A highly experienced and specifically qualified construction design development manager with a track record of successful author supervision on similar projects.
A lean and efficient operational model that allows for a highly competitive price without compromising quality or timelines.
Social Value Opportunities
While not explicitly required, subtly highlight any existing company policies or practices that promote local employment, skills development, or environmental stewardship within the project's execution, framing them as inherent benefits of partnering with the bidder.
Bid Focus Areas
Lowest offered priceN/A (primary)

Develop a highly competitive pricing strategy based on detailed costings, efficient resource allocation, and optimized methodologies. Benchmark against potential competitor pricing if possible. Clearly articulate the value delivered for the price.

Experience of the construction design development managerN/A (explicitly mentioned)

Provide a detailed CV and a compelling narrative highlighting the manager's relevant experience, specific achievements, and suitability for this project. Showcase successful completion of similar projects, focusing on capacity/quality improvements and author supervision.

Procurement requirements for improving the capacity and quality of rainwater collection systems and developing 'green' solutionsN/A (explicitly mentioned)

Thoroughly address all technical requirements. Proactively propose innovative and 'green' solutions that align with the spirit of the procurement, even if not explicitly mandated for scoring. Demonstrate a deep understanding of the challenges and opportunities in improving rainwater collection systems.

Recommendations6
Quantify Manager's Experience with Data
CriticalMed effort

For the construction design development manager, go beyond listing responsibilities. Quantify achievements: e.g., 'Managed author supervision for X projects with a total value of Y EUR,' or 'Successfully implemented Z capacity improvements leading to a W% reduction in overflow events.'

Significantly strengthens the bid's technical credibility and directly addresses a key evaluation point.
Develop a Lean and Competitive Pricing Model
CriticalHigh effort

Conduct a granular cost breakdown. Identify opportunities for efficiency in design processes, site visits, and reporting. Explore cost-effective material or methodology alternatives that meet technical specifications. Consider a slightly lower margin if confidence in winning is high.

Maximizes the chance of winning based on the primary evaluation criterion.
Proactively Propose 'Green' Solution Enhancements
HighMed effort

Even though 'green' solutions are not explicitly weighted, demonstrate how proposed designs can incorporate sustainable elements (e.g., permeable surfaces, bioswales, water harvesting for non-potable use) that offer long-term benefits and align with modern urban planning principles. Frame these as value-adds.

Adds perceived value and demonstrates forward-thinking, potentially influencing the contracting authority's perception.
Detail Author Supervision Methodology
HighMed effort

Outline a clear, phased approach to author supervision, detailing communication protocols with the contractor, site inspection frequency, quality control measures, and reporting mechanisms. Emphasize proactive problem-solving and timely issue resolution.

Assures the client of a robust and efficient supervision process, mitigating perceived risks.
Address Funding Uncertainty Transparently
MediumLow effort

Include a brief statement acknowledging the funding contingency. Express readiness to proceed promptly upon confirmation of funding. This shows understanding and preparedness.

Manages client expectations and demonstrates professionalism.
Align Technical Solution with Capacity/Quality Needs
CriticalMed effort

Ensure the proposed design directly addresses the stated need to improve capacity and quality of the rainwater collection system. Use specific examples from the 'Iepirkuma priekšmeta prasības' to demonstrate understanding and propose tailored solutions.

Directly meets the core technical objective of the tender.
Competitive Positioning
Position the bid as the optimal balance of proven technical capability and aggressive pricing. Highlight the experience of the design development manager as a key differentiator that ensures quality and efficiency, thereby justifying the competitive price. Emphasize a streamlined, cost-effective approach to author supervision.

Competitors

Upgrade to see which companies are likely to bid on this tender, based on historical procurement data.

Login

Requirements & Qualifications

7 requirements across 5 categories

Submission (1)
Mandatory (1)
Compliance (1)
Technical (3)
Financial (1)
SUBMISSION REQUIREMENTS1
--None explicitly stated in provided text, beyond the general tender procedure (as per Nolikums).
MANDATORY EXCLUSION GROUNDS1
--None explicitly stated in provided text.
ELIGIBILITY REQUIREMENTS1
--None explicitly stated in provided text.
TECHNICAL CAPABILITY REQUIREMENTS3
--Experience of the construction design development manager (as per 6.pielikums “Saimnieciski izdevīgākā piedāvājuma izvērtēšanas kritēriji”).
--Procurement requirements for improving the capacity and quality of rainwater collection systems and developing "green" solutions (as per Iepirkuma priekšmeta prasības, 1.versija).
--Author supervision to be carried out from the day the object is handed over to the construction contractor until the day the object is accepted into operation (as per Līguma projekta 3.3.5.2. apakšpunkts).
FINANCIAL REQUIREMENTS1
--Lowest offered price (as per 6.pielikums “Saimnieciski izdevīgākā piedāvājuma izvērtēšanas kritēriji”).

Requirements Preview

Sign up to view complete requirements and analysis

Documents

4 documents available with AI summaries

Iepirkuma priekšmeta prasības, 1.versijaPDF
165513_PD.ANY_1_1_1_20260226052341.pdf -- 98.9 KB

This document contains the procurement requirements for improving the capacity and quality of rainwater collection systems and developing "green" solutions for the Jelgava City Municipality's Garozas Street rainwater collector.

5.pielikums “Līguma projekts”DOC
5_pielikums_Liguma_projekts.docx -- 71.3 KB

This document contains a draft contract for the development and author's supervision of a construction project to improve rainwater collection systems and develop "green" solutions, funded by the European Regional Development Fund.

6.pielikums “Saimnieciski izdevīgākā piedāvājuma izvērtēšanas kritēriji”PDF
6.pielikums_SIP_izvertesanas_kriteriji.pdf -- 337.6 KB

This document outlines the criteria for evaluating the most economically advantageous tender, focusing on the lowest offered price and the experience of the construction design development manager.

NolikumsPDF
Nolikums_7_AK.pdf -- 317.5 KB

This document contains the regulations for an open tender procedure for the design and supervision of improvements to the rainwater collection system capacity and quality, including the development of "green" solutions for Garozas Street.

Documents Preview

Sign up to view document summaries and analysis

75
Good

Tender Quality Score

This tender for rainwater system improvements in Jelgava is generally well-structured, with clear documentation and EU funding. However, the undisclosed estimated value and lack of explicit evaluation criteria beyond price and manager experience are notable concerns.

Score Breakdown

Legal Compliance75/100

The tender adheres to open procedure and specifies a CPV code. Deadlines appear reasonable within the context of the submission period. The funding source is clearly stated, and the conditional nature of the contract based on financing is transparent. No disputes are reported.

Clarity80/100

The title and description are specific, detailing the project's scope for rainwater collection system improvements and 'green' solutions. Key documents like technical specifications and contract drafts are provided, contributing to clarity. However, the absence of explicit evaluation criteria beyond price and manager experience could be clearer.

Completeness70/100

Most basic information is present, including organization, type, procedure, and timeline details. The contract duration and tender validity are specified. Five relevant documents are attached. The primary missing element is the estimated value of the contract.

•Estimated value not disclosed
Fairness85/100

The tender is an open procedure, promoting broad participation. E-procurement is utilized. While the value is not disclosed, the criteria mentioned (price and manager experience) are objective. However, the 'Issues: Restricted document access' flag suggests potential limitations in full document access for all parties, which is a concern.

•Restricted document access (flagged in issues)
Practicality65/100

The tender utilizes e-procurement, which is a positive aspect. Document URLs are implicitly available through the platform. The contract start date is not explicitly stated but can be inferred from the duration and handover. Financing information is provided through the EU funding context. The duration is specified.

•No explicit e-submission mentioned (though e-procurement is listed)
Data Consistency90/100

Key fields such as title, reference, organization, and dates are populated. There are no reported suspensions or disputes. The dates provided (Reveal, Submission, Opening) are logically sequenced. The contract duration and tender validity are consistent.

Sustainability50/100

The project explicitly mentions the development of 'green' solutions and is funded by the EU's Cohesion Policy program focused on climate change adaptation. This indicates a focus on environmental sustainability. However, explicit mention of broader green procurement policies, social aspects, or innovation beyond the core project scope is not detailed.

•No explicit mention of broader green procurement policies, social aspects, or innovation

Strengths

Clear project scope and objectives
EU funding transparency
Use of e-procurement
Detailed technical specifications and contract draft

Concerns

Undisclosed estimated contract value
Lack of explicit evaluation criteria beyond price and manager experience
Potential restricted document access

Recommendations

1. Disclose the estimated contract value to enhance transparency and fairness.
2. Provide more detailed evaluation criteria beyond price and manager experience to ensure a comprehensive assessment of offers.
3. Clarify and ensure full, unrestricted access to all tender documents for all potential bidders.

AI Scoring Preview

Sign up to view complete requirements and analysis

Complete quality score analysis
Detailed sub-score breakdown
Strengths & concerns insights
Strategic recommendations

No credit card required • Setup in 2 minutes