Upgrade to see which companies are likely to bid on this tender, based on historical procurement data.
Login20 requirements across 5 categories
Sign up to view complete requirements and analysis
6 documents available with AI summaries
Bidders must confirm they have reviewed all tender documents, including the technical description, understand the scope of work, and submit an unconditional offer.
The tender evaluates the total bid cost, where the lowest price receives the maximum score.
The procurement passport (ESPD) is an initial self-declaration by the economic operator, containing the contracting authority's conditions and the format of expected responses, but is not intended for completion.
This document outlines the general terms and conditions of the procurement procedure, including the electronic procurement environment, obtaining clarifications, and the composition of tender documents required for bid submission.
The subject of the procurement contract is the preparation of a construction design for a light traffic tunnel under the railway in Saue municipality, including the main design, necessary studies, approvals, and building permit application.
This document is a draft design contract outlining the terms between the Saue Municipal Government and the contractor for the design of a pedestrian tunnel under the railway on Kütise street.
Sign up to view document summaries and analysis
This tender for the design of a pedestrian tunnel is generally well-structured, with clear objectives and a straightforward evaluation criterion. However, it lacks explicit details on sustainability and innovation.
The tender appears to comply with general procurement regulations. Deadlines are specified, and the procedure is described as electronic. The CPV code is provided. No disputes are indicated. The financing conditions are referenced in an attached document.
The description of the tender's subject matter is clear, outlining the need for a construction design for a pedestrian tunnel. Key requirements, such as the need for a complete project solution from a single entity, are documented. The evaluation criterion (lowest price) is specified.
Most basic information is present, including title, reference, organization, estimated value, and contract duration. However, the financing conditions are only referenced in an attached document, and specific mandatory exclusion grounds are not detailed in the provided text.
The tender is conducted electronically, promoting accessibility. The evaluation criterion is objective (lowest price). The decision not to divide the tender into lots is justified by the need for a single responsible entity and to avoid administrative burden, which is a reasonable explanation. Full document access is implied through the e-procurement platform.
The tender utilizes e-submission and e-procurement. A contract duration is specified. However, the financing conditions are only referenced in an attached document, and the contract start date is not explicitly stated.
Key fields such as title, reference, organization, estimated value, and deadlines are populated. There are no indications of suspension or disputes. The dates provided (reveal, submission, opening) are logically sequenced.
The tender mentions 'Green Procurement' as a characteristic, but no specific criteria or targets related to environmental or social aspects are detailed in the provided text. There is no explicit mention of innovation or EU funding.
Sign up to view complete requirements and analysis
No credit card required • Setup in 2 minutes
Our procurement experts prepare everything. Proven to work — you review, approve, and submit.
Hello! I'm your AI assistant for this tender. I can help you understand requirements, deadlines, eligibility criteria, and provide strategic insights.
No credit card required