Want tender expert help? See our tender preparation service
Tenders

Viljandi County, Viljandi Municipality, Oiu Village, substation reconstruction and low-voltage connection (TC0979, LC4531)

Closed

Updated October 15, 2026

Submission Deadline Has Passed

This tender's submission deadline has passed and is no longer accepting applications. The information below is kept for reference purposes.

Browse Active Tenders
Deadline
Expired
March 11, 2026
Contract Details
Category
Construction
Reference
306984
Value
€50,382
Location
Estonia
Published
March 03, 2026
Organization
CPV Code
Evaluation Criteria
Total bid cost100%
Project Timeline

Tender Published

March 03, 2026

Deadline for Questions

March 04, 2026

Submission Deadline

March 11, 2026

Tender Opening

March 11, 2026

Contract Start Date

March 19, 2026

Win ProbabilityPRO
🔒
Upgrade to Professional
See your estimated win probability based on historical data.
Upgrade to Professional →
Buyer IntelligencePRO
🔒
Unlock Buyer Intelligence
See spending patterns, preferred procedures, and more.
Upgrade to Professional →
Sector InsightsPRO
🔒
Unlock Sector Insights
See average winning prices, competition levels, and market trends.
Upgrade to Professional →

Key facts

Estimated value
€50,382
Deadline
Expired
CPV Code
45310000-3 — Electrical installation work
Budget
€50,382
Duration
Not specified
Location
Estonia
Type
Construction
75
Quality Score/100
Good
Market Benchmark
Avg. Winning Price
€524,963
Avg. Bids
4.7
Competition
Medium
SME Winners
94%
5,932 tenders analyzed

Original Tender Description

Installation of a new LK, PK 3x16A with meter in the OT internal network at the Oiu AJ territory, connections, commissioning; Construction of an OT reserve connection for Elering AS in the Oiu AJ ELV AC center; Oiu AJ RK, linking. 502503 and 502504 interconnected - LÜ attached. Work completion deadline is 29.09.2026. NB! Please pay attention to the document "P135 General Conditions of Contract for Electrical Installation Works ver. 23" which came into force on 18.06.2024.
EU FundedElectronic Submission

Run Risk Analysis

Identify potential risks, inconsistencies, and red flags across all tender documents. Get a detailed risk report with severity levels and mitigation recommendations.

Login

Win Strategy

AI-powered analysis of this tender's requirements, opportunities, and challenges. Get strategic insights to maximize your win probability.

75%
Estimated Win ProbabilityModerate Fit

This tender for the Oiu substation upgrade and low-voltage connection is heavily weighted towards price. A winning strategy will focus on delivering a highly competitive, cost-optimized bid while meticulously meeting all technical and eligibility requirements, particularly the experience with similar electrical construction projects and the registered switching rights personnel.

Key Winning Messages

Cost-Effective Excellence: Delivering a high-quality substation upgrade at the most competitive price.

Proven Expertise: Demonstrating a strong history of successful, similar electrical construction projects.

Operational Readiness: Ensuring immediate compliance with Elektrilevi's operational and safety standards.

Key Opportunities
Leverage detailed cost breakdowns to identify areas for optimization and present a highly competitive total bid cost.
Highlight the specific experience with projects similar to substation upgrades and low-voltage connections to satisfy the eligibility requirement.
Emphasize the immediate availability of a qualified and registered switching rights personnel to demonstrate operational readiness.
Key Challenges
Intense price competition due to 100% price-based evaluation.

Conduct thorough cost analysis, explore material sourcing efficiencies, and optimize labor allocation without compromising quality or safety. Consider lean construction principles.

Meeting the specific experience requirement for similar projects, especially the €40,000 contract threshold.

Carefully select and present the most relevant past projects, ensuring all details (value, scope, dates) are clearly documented and align with the tender's description.

Ensuring full compliance with the updated 'P135 Elektripaigaldise ehitustööde töövõtulepingu tüüptingimused ver. 23'.

Dedicate specific resources to thoroughly review and understand the updated contract terms. Integrate these requirements into the bid proposal and project execution plan.

Ideal Bidder Profile
An established electrical construction company with a proven track record in substation upgrades and low-voltage grid connections, possessing a certified team member registered on the Elektrilevi partner portal for switching operations, and a strong understanding of cost management to offer a competitive price.
Key Requirements
At least three similar electrical construction work contracts completed in the last 60 months, with one contract being at least 40,000 EUR (excluding VAT).
The bidder's team must include a person responsible for switching rights and work operations, who is registered in the Elektrilevi partner portal.
Submit a completed price offer table with detailed costs for the various works.
Bidders must prove they do not fall under mandatory or voluntary exclusion grounds.
Adherence to 'P135 Elektripaigaldise ehitustööde töövõtulepingu tüüptingimused ver. 23'.
Key Discriminators
A highly detailed and transparent price offer that clearly demonstrates cost-efficiency and value for money.
A proactive approach to demonstrating understanding and compliance with the latest Elektrilevi standard contract terms.
A clear and concise presentation of past project experience that directly maps to the tender's technical requirements.
Social Value Opportunities
While not explicitly requested, consider a brief statement on commitment to local employment or sustainable waste management practices if feasible within cost constraints, framing it as a commitment to responsible project execution.
Bid Focus Areas
Total bid cost100.0%

Develop a granular cost breakdown, identifying opportunities for efficiency and competitive pricing. Ensure the 'Total Cost' line is as low as possible while maintaining profitability and quality standards. Benchmark against similar projects if possible.

Recommendations6
Meticulously Document Past Project Experience
CriticalMed effort

Provide detailed information for at least three similar electrical construction contracts completed within the last 60 months. Ensure one contract clearly exceeds the 40,000 EUR (excluding VAT) threshold. Clearly articulate the scope, responsibilities, and successful outcomes of each project, emphasizing their similarity to substation upgrades and low-voltage connections.

Directly addresses a critical eligibility requirement, preventing disqualification.
Optimize Price Offer for Maximum Competitiveness
CriticalHigh effort

Develop a detailed and transparent price offer table. Conduct a thorough cost-benefit analysis for each component of the Oiu substation upgrade and low-voltage connection. Identify potential cost savings through efficient resource allocation, material sourcing, and streamlined work processes. Aim to be the lowest bidder without compromising quality or safety.

Maximizes the score for the sole evaluation criterion, significantly increasing win probability.
Confirm and Highlight Registered Switching Rights Personnel
CriticalLow effort

Ensure the designated responsible person for switching rights and work operations is currently registered in the Elektrilevi partner portal. Clearly state this in the bid and provide any necessary supporting documentation or confirmation details as required by Elektrilevi.

Meets a crucial technical capability requirement, essential for project execution and bid acceptance.
Thoroughly Review and Integrate 'P135' Contract Terms
HighMed effort

Dedicate time to fully understand the implications of the 'P135 Elektripaigaldise ehitustööde töövõtulepingu tüüptingimused ver. 23'. Ensure all bid documentation and proposed project execution plans align with these terms. Highlight any specific clauses that demonstrate proactive compliance.

Prevents potential contractual disputes and ensures smooth project execution, demonstrating professionalism.
Proactive Risk Identification and Mitigation in Bid
MediumMed effort

While not explicitly asked for, subtly include a section or mention within the technical proposal that outlines potential project risks (e.g., site access, weather) and the bidder's mitigation strategies. This demonstrates foresight and professionalism.

Adds credibility and can subtly influence the perception of the bidder's competence beyond just price.
Verify Exclusion Grounds Compliance
MediumLow effort

Conduct a thorough internal review to ensure the company does not fall under any mandatory or voluntary exclusion grounds as stipulated by procurement law. Prepare all necessary declarations and supporting documents.

Prevents disqualification on administrative grounds.
Competitive Positioning
Position the bid as the most economically advantageous offer that fully meets all technical and eligibility requirements, emphasizing efficiency and proven capability. Highlight the immediate operational readiness through the registered switching rights personnel.

Competitors

Upgrade to see which companies are likely to bid on this tender, based on historical procurement data.

Login

Requirements & Qualifications

7 requirements across 5 categories

Submission (3)
Mandatory (1)
Compliance (1)
Technical (1)
Financial (1)
SUBMISSION REQUIREMENTS3
--Submit a completed price offer table.
--Provide details of at least three similar electrical construction work contracts completed in the last 60 months, with one contract being at least 40,000 EUR (excluding VAT).
--The price offer table must include detailed costs for the various works of the Oiu substation upgrade and low-voltage connection.
MANDATORY EXCLUSION GROUNDS1
--Bidders must prove they do not fall under mandatory or voluntary exclusion grounds.
ELIGIBILITY REQUIREMENTS1
--Bidders must have at least three similar electrical construction work contracts completed in the last 60 months.
TECHNICAL CAPABILITY REQUIREMENTS1
--The bidder's team must include a person responsible for switching rights and work operations, who is registered in the Elektrilevi partner portal.
FINANCIAL REQUIREMENTS1
--None explicitly stated beyond the value of the tender.

Requirements Preview

Sign up to view complete requirements and analysis

Documents

7 documents available with AI summaries

VastavustingimusedPDF
306984_vastavustingimused.pdf -- 10.0 KB

Bidders must confirm that their team includes a person with relevant switching rights and responsibility for work operations, registered in the Elektrilevi partner portal, and submit a completed price offer table.

Varasemate hankelepingute informatsioonDOC
Varasemate_hankelepingute_informatsioon.docx -- 22.4 KB

The bidder must have completed at least three similar electrical construction contracts in the last 60 months, with at least one valued at €40,000 (excluding VAT), and provide details of these contracts.

Vorm 1 Hinnapakkumuse tabelXLS
Vorm 1 Hinnapakkumuse tabel.xlsx -- 20.9 KB

Submit a price quotation table detailing costs for various works related to the Oiu substation reconstruction and low-voltage connection.

Hindamiskriteeriumid ja hinnatavad näitajadPDF
306984_hindamiskriteeriumid.pdf -- 2.9 KB

The contracting authority evaluates bids based on economic advantage, with the lowest price being the best criterion.

Kõrvaldamise alused ja kvalifitseerimistingimusedPDF
306984_korvaldamise_alused_ja_kvalifitseerimi... -- 7.1 KB

Bidders must confirm they do not fall under mandatory or voluntary exclusion grounds and must have at least three similar electrical construction work contracts in the last 60 months.

Tellimuse dokumendidZIP
EPP-941787-1_Tellimuse_dokumendid (2).zip -- 5.7 MB

No summary available for this document.

Väikehanke alusdokumendid 02.01.2026ZIP
Väikehanke alusdokumendid (02012026).zip -- 2.3 MB

No summary available for this document.

Documents Preview

Sign up to view document summaries and analysis

75
Good

Tender Quality Score

This tender presents a well-structured opportunity for electrical installation work with clear requirements and a competitive evaluation process. While generally sound, minor improvements in document accessibility and sustainability focus could enhance its quality.

Score Breakdown

Legal Compliance75/100

The tender generally adheres to legal compliance standards. Deadlines appear reasonable, and the procedure is outlined. The CPV code is specified. There is no indication of disputes or lack of regulatory compliance in the provided data. The financing conditions and payment terms are detailed, aligning with common procurement practices.

Clarity80/100

The tender description is clear regarding the scope of work: substation reconstruction and low-voltage connection in Oiu village. Requirements for exclusion grounds, eligibility, and technical capability are documented. The evaluation criteria are stated as relative weighting with the lowest price as the best criterion, which is understandable.

Completeness70/100

Most basic information is present, including title, organization, estimated value, and contract start date. However, some crucial documents related to technical specifications (Project and Task specification) are in a .zip format, hindering full AI analysis and potentially bidder accessibility if not properly handled. While financing and duration are specified, the 'value classified' status combined with a specific estimated value could be more transparent if 'value classified' means it's indeed a specific figure.

•Some key tender documents are in a .zip format, hindering comprehensive AI analysis and potentially bidder accessibility.
Fairness85/100

The tender demonstrates fairness by providing access to all necessary documents (though format limitations exist for some). The estimated value is disclosed, and deadlines seem reasonable. The evaluation criteria are objective, focusing on economic advantage. The requirement for team members to be registered in the Elektrilevi partner portal might be seen as specific, but it likely relates to operational safety and efficiency. The use of e-procurement is a positive fairness indicator.

Practicality65/100

Electronic submission and e-procurement are facilitated. The contract start date is specified. Financing conditions are detailed, explaining payment terms based on contract value and the availability of a factoring program. However, the URL for management system documents requires a specific view ('OpenView%20'), which might not be universally user-friendly. The duration of the contract is implicitly defined by the 'Tender Valid' period and work completion deadline.

•URL for management system documents requires a specific view ('OpenView%20'), potentially reducing ease of access.
Data Consistency90/100

Key fields such as title, reference, organization, estimated value, and dates are populated. There are no indications of suspension or disputes. The dates provided (Reveal Date, Submission Deadline, Opening Date, Contract Start) are logically sequenced and consistent with a tender process. The work completion deadline is also logically placed after the contract start.

Sustainability50/100

The tender explicitly mentions 'EU Funded', indicating potential adherence to certain standards. However, there are no specific requirements or criteria related to green procurement, social aspects, or innovation mentioned in the provided text. This suggests a primary focus on technical and economic factors over broader sustainability goals.

•Lack of explicit criteria for green procurement, social aspects, or innovation.

Strengths

Clear scope of work and technical requirements.
Well-defined evaluation criteria (lowest price).
Facilitation of electronic submission and e-procurement.
Detailed payment terms and financing options.

Concerns

Some key documents are in .zip format, potentially limiting accessibility.
Limited explicit focus on sustainability criteria (green, social, innovation).
URL for management system documents might not be universally user-friendly.

Recommendations

1. Ensure all tender documents, especially technical specifications, are provided in easily accessible formats (e.g., PDF).
2. Consider incorporating specific sustainability criteria into future tenders to align with broader policy objectives.
3. Verify the user-friendliness of all provided URLs for accessing important documents.

AI Scoring Preview

Sign up to view complete requirements and analysis

Complete quality score analysis
Detailed sub-score breakdown
Strengths & concerns insights
Strategic recommendations

No credit card required • Setup in 2 minutes