Tenders

Provision of Ground Investigation Survey for Little Hulton Solar Farm

Closed

Submission Deadline Has Passed

This tender's submission deadline has passed and is no longer accepting applications. The information below is kept for reference purposes.

Browse Active Tenders
Deadline
Expired
January 17, 2023
Contract Details
Category
Other
Reference
001502-2023
Value
£26,850
Location
Greater Manchester, United Kingdom
Published
February 24, 2026
Organization
CPV Code
Project Timeline

Tender Published

January 18, 2023

Deadline for Questions

January 10, 2023

Submission Deadline

January 17, 2023

Budget
£26,850
Duration
Not specified
Location
Greater Manchester
Type
Other

Original Tender Description

The survey will inform the project to construct a 3MW solar farm in Little Hulton. The project is part of the Unlocking Clean Energy Greater Manchester (UCEGM) Programme and is receiving funding from the England European Regional Development Fund (ERDF) as part of the European Structural and Investment Funds Growth Programme 2014-2020. The Department for Levelling Up, Housing and Communities is the Managing Authority for European Regional Development Fund. Established by the European Union, the European Regional Development Fund helps local areas stimulate their economic development by investing in projects which will support innovation, businesses, create jobs and local community regenerations. For more information visit https://www.gov.uk/european-growth-funding. The contractor is to undertake a Phase II interpretative ground assessment for the site at Kenyon Way, Little Hulton, Salford. The Phase II report is to assess the ground based geotechnical and environmental risks, constraints and liabilities associated with the proposed development of the site which is to be redeveloped as a ground mounted solar photovoltaic (PV) facility. The Phase II report is required to support contaminated land planning conditions, allow the design of economic foundation solutions and determine whether the local ground is suitable for the installation of the ground mounted solar photovoltaic (PV) facility. The site is approximately 3.4 ha in size. The proposed solar PV facility development will include equipment that will be generally low lying (approx. height 2.4m) and capable of screening from surrounding vantage points. There will be a galvanised security fence of approx. 2.4m height around the site and there will be a proposed substation situated to the north west of the site. HV cables and other associated equipment cables will run beneath the site.  Refer to Phase 1 Geotechnical and Geo-Environmental Desk Study Report prepared by AECOM Limited for further information (report revision 0 dated 28 February 2020).
Green Procurement

Risk Analysis

Please log in to use risk analysis.

Login

Win Strategy

Please log in to access winning strategy recommendations.

Login

Competitors

Upgrade to see which companies are likely to bid on this tender, based on historical procurement data.

Login

Requirements & Qualifications

AI requirements analysis not yet available for this tender.

Requirements will be generated automatically when tender documents are processed.


Basic Requirements

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Documents

No processed documents available for this tender.

Documents will appear here once they are downloaded and analyzed.

Analysis Pending

Quality analysis for this tender is being processed. Please check back shortly.

Add to Pipeline