Wartość
£26,850
Lokalizacja
Greater Manchester, Wielka Brytania
Published
Luty 24, 2026
Organizacja
Kod CPV
Harmonogram Projektu

Ogłoszenie przetargu

Styczeń 18, 2023

Termin składania pytań

Styczeń 10, 2023

Termin składania ofert

Styczeń 17, 2023

Budget
£26,850
Duration
Not specified
Lokalizacja
Greater Manchester
Type
Inne

Oryginalny Opis Przetargu

The survey will inform the project to construct a 3MW solar farm in Little Hulton. The project is part of the Unlocking Clean Energy Greater Manchester (UCEGM) Programme and is receiving funding from the England European Regional Development Fund (ERDF) as part of the European Structural and Investment Funds Growth Programme 2014-2020. The Department for Levelling Up, Housing and Communities is the Managing Authority for European Regional Development Fund. Established by the European Union, the European Regional Development Fund helps local areas stimulate their economic development by investing in projects which will support innovation, businesses, create jobs and local community regenerations. For more information visit https://www.gov.uk/european-growth-funding. The contractor is to undertake a Phase II interpretative ground assessment for the site at Kenyon Way, Little Hulton, Salford. The Phase II report is to assess the ground based geotechnical and environmental risks, constraints and liabilities associated with the proposed development of the site which is to be redeveloped as a ground mounted solar photovoltaic (PV) facility. The Phase II report is required to support contaminated land planning conditions, allow the design of economic foundation solutions and determine whether the local ground is suitable for the installation of the ground mounted solar photovoltaic (PV) facility. The site is approximately 3.4 ha in size. The proposed solar PV facility development will include equipment that will be generally low lying (approx. height 2.4m) and capable of screening from surrounding vantage points. There will be a galvanised security fence of approx. 2.4m height around the site and there will be a proposed substation situated to the north west of the site. HV cables and other associated equipment cables will run beneath the site.  Refer to Phase 1 Geotechnical and Geo-Environmental Desk Study Report prepared by AECOM Limited for further information (report revision 0 dated 28 February 2020).
Green Procurement

Analiza ryzyka

Zaloguj się, aby korzystać z analizy ryzyka.

Zaloguj się

Strategia wygrywania

Zaloguj się, aby uzyskać dostęp do rekomendacji strategii wygrywania.

Zaloguj się

Konkurenci

Ulepsz plan, aby zobaczyć, które firmy prawdopodobnie złożą ofertę w tym przetargu, na podstawie historycznych danych zamówień publicznych.

Zaloguj się

Wymagania i Kwalifikacje

Analiza wymagań AI nie jest jeszcze dostępna dla tego przetargu.

Wymagania zostaną wygenerowane automatycznie po przetworzeniu dokumentów przetargowych.


Podstawowe wymagania

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokumenty

Brak przetworzonych dokumentów dla tego przetargu.

Dokumenty pojawią się tutaj po ich pobraniu i przeanalizowaniu.

Analiza w toku

Trwa analiza jakości tego przetargu. Proszę spróbować ponownie za chwilę.

Dodaj do pipeline'u