Atpakaļ uz iepirkumiem

Provision of Ground Investigation Survey for Little Hulton Solar Farm

Slēgts

Iesniegšanas termiņš ir beidzies

Šī iepirkuma iesniegšanas termiņš ir beidzies un pieteikumi vairs netiek pieņemti. Zemāk esošā informācija ir saglabāta uzziņai.

Pārlūkot aktīvos iepirkumus
Termiņš
Beidzies
Janvāris 17, 2023
Līguma detaļas
Kategorija
Cits
Atsauce
001502-2023
Vērtība
£26,850
Atrašanās vieta
Greater Manchester, Apvienotā Karaliste
Publicēts
Februāris 24, 2026
Organizācija
CPV kods
Projekta laika skala

Iepirkums publicēts

Janvāris 18, 2023

Termiņš jautājumiem

Janvāris 10, 2023

Iesniegšanas termiņš

Janvāris 17, 2023

Budžets
£26,850
Ilgums
Nav norādīts
Atrašanās vieta
Greater Manchester
Tips
Cits

Oriģinālais iepirkuma apraksts

The survey will inform the project to construct a 3MW solar farm in Little Hulton. The project is part of the Unlocking Clean Energy Greater Manchester (UCEGM) Programme and is receiving funding from the England European Regional Development Fund (ERDF) as part of the European Structural and Investment Funds Growth Programme 2014-2020. The Department for Levelling Up, Housing and Communities is the Managing Authority for European Regional Development Fund. Established by the European Union, the European Regional Development Fund helps local areas stimulate their economic development by investing in projects which will support innovation, businesses, create jobs and local community regenerations. For more information visit https://www.gov.uk/european-growth-funding. The contractor is to undertake a Phase II interpretative ground assessment for the site at Kenyon Way, Little Hulton, Salford. The Phase II report is to assess the ground based geotechnical and environmental risks, constraints and liabilities associated with the proposed development of the site which is to be redeveloped as a ground mounted solar photovoltaic (PV) facility. The Phase II report is required to support contaminated land planning conditions, allow the design of economic foundation solutions and determine whether the local ground is suitable for the installation of the ground mounted solar photovoltaic (PV) facility. The site is approximately 3.4 ha in size. The proposed solar PV facility development will include equipment that will be generally low lying (approx. height 2.4m) and capable of screening from surrounding vantage points. There will be a galvanised security fence of approx. 2.4m height around the site and there will be a proposed substation situated to the north west of the site. HV cables and other associated equipment cables will run beneath the site.  Refer to Phase 1 Geotechnical and Geo-Environmental Desk Study Report prepared by AECOM Limited for further information (report revision 0 dated 28 February 2020).
Zaļais iepirkums

Risku analīze

Lūdzu, piesakieties, lai izmantotu risku analīzi.

Pieteikties

Uzvaras stratēģija

Lūdzu, piesakieties, lai piekļūtu uzvaras stratēģijas ieteikumiem.

Pieteikties

Konkurenti

Jauniniet, lai redzētu, kuri uzņēmumi, visticamāk, iesniegs piedāvājumu šim iepirkumam, pamatojoties uz vēsturiskajiem iepirkumu datiem.

Pieteikties

Prasības un kvalifikācijas

AI prasību analīze šim iepirkumam vēl nav pieejama.

Prasības tiks ģenerētas automātiski, kad tiks apstrādāti iepirkuma dokumenti.


Pamata prasības

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokumenti

Šim iepirkumam nav pieejami apstrādāti dokumenti.

Dokumenti parādīsies šeit, tiklīdz tie tiks lejupielādēti un analizēti.

Analīze gaida

Kvalitātes analīze šim iepirkumam tiek apstrādāta. Lūdzu, pārbaudiet vēlāk.

Pievienot pārvaldībai