Retour aux appels d'offres

Provision of Ground Investigation Survey for Little Hulton Solar Farm

Fermé

Date limite de soumission dépassée

La date limite de soumission de cet appel d'offres est dépassée et il n'accepte plus de candidatures. Les informations ci-dessous sont conservées à titre de référence.

Parcourir les appels d'offres actifs
Date limite
Expiré
Janvier 17, 2023
Détails du contrat
Catégorie
Autre
Référence
001502-2023
Valeur
£26,850
Lieu
Greater Manchester, Royaume-Uni
Publié
Février 24, 2026
Organisation
Code CPV
Calendrier du projet

Publication de l'appel d'offres

Janvier 18, 2023

Date limite pour les questions

Janvier 10, 2023

Date limite de soumission

Janvier 17, 2023

Budget
£26,850
Durée
Non spécifié
Lieu
Greater Manchester
Type
Autre

Description originale de l'appel d'offres

The survey will inform the project to construct a 3MW solar farm in Little Hulton. The project is part of the Unlocking Clean Energy Greater Manchester (UCEGM) Programme and is receiving funding from the England European Regional Development Fund (ERDF) as part of the European Structural and Investment Funds Growth Programme 2014-2020. The Department for Levelling Up, Housing and Communities is the Managing Authority for European Regional Development Fund. Established by the European Union, the European Regional Development Fund helps local areas stimulate their economic development by investing in projects which will support innovation, businesses, create jobs and local community regenerations. For more information visit https://www.gov.uk/european-growth-funding. The contractor is to undertake a Phase II interpretative ground assessment for the site at Kenyon Way, Little Hulton, Salford. The Phase II report is to assess the ground based geotechnical and environmental risks, constraints and liabilities associated with the proposed development of the site which is to be redeveloped as a ground mounted solar photovoltaic (PV) facility. The Phase II report is required to support contaminated land planning conditions, allow the design of economic foundation solutions and determine whether the local ground is suitable for the installation of the ground mounted solar photovoltaic (PV) facility. The site is approximately 3.4 ha in size. The proposed solar PV facility development will include equipment that will be generally low lying (approx. height 2.4m) and capable of screening from surrounding vantage points. There will be a galvanised security fence of approx. 2.4m height around the site and there will be a proposed substation situated to the north west of the site. HV cables and other associated equipment cables will run beneath the site.  Refer to Phase 1 Geotechnical and Geo-Environmental Desk Study Report prepared by AECOM Limited for further information (report revision 0 dated 28 February 2020).
Achats écologiques

Analyse des risques

Veuillez vous connecter pour utiliser l'analyse des risques.

Se connecter

Stratégie gagnante

Connectez-vous pour accéder aux recommandations de stratégie gagnante.

Se connecter

Concurrents

Passez à un plan supérieur pour voir quelles entreprises sont susceptibles de soumissionner pour cet appel d'offres, basé sur les données historiques.

Se connecter

Exigences et qualifications

L'analyse des exigences par l'IA n'est pas encore disponible pour cet appel d'offres.

Les exigences seront générées automatiquement lorsque les documents de l'appel d'offres seront traités.


Exigences de base

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Documents

Aucun document traité n'est disponible pour cet appel d'offres.

Les documents apparaîtront ici une fois qu'ils auront été téléchargés et analysés.

Analyse en attente

L'analyse de la qualité de cet appel d'offres est en cours. Veuillez vérifier à nouveau dans quelques instants.

Ajouter au Pipeline