Atgal į konkursus

Provision of Ground Investigation Survey for Little Hulton Solar Farm

Uždarytas

Pateikimo terminas pasibaigė

Šio konkurso pateikimo terminas pasibaigė ir paraiškos nebepriimamos. Žemiau pateikta informacija saugoma informaciniais tikslais.

Naršyti aktyvius konkursus
Galutinis terminas
Pasibaigęs
Sausis 17, 2023
Informacija apie sutartį
Kategorija
Kita
Nuoroda
001502-2023
Vertė
£26,850
Vieta
Greater Manchester, Jungtinė Karalystė
Paskelbta
Vasaris 24, 2026
Organizacija
CPV kodas
Projekto grafikas

Konkursas paskelbtas

Sausis 18, 2023

Klausimų pateikimo terminas

Sausis 10, 2023

Pasiūlymų pateikimo terminas

Sausis 17, 2023

Biudžetas
£26,850
Trukmė
Nenurodyta
Vieta
Greater Manchester
Tipas
Kita

Originalus konkurso aprašymas

The survey will inform the project to construct a 3MW solar farm in Little Hulton. The project is part of the Unlocking Clean Energy Greater Manchester (UCEGM) Programme and is receiving funding from the England European Regional Development Fund (ERDF) as part of the European Structural and Investment Funds Growth Programme 2014-2020. The Department for Levelling Up, Housing and Communities is the Managing Authority for European Regional Development Fund. Established by the European Union, the European Regional Development Fund helps local areas stimulate their economic development by investing in projects which will support innovation, businesses, create jobs and local community regenerations. For more information visit https://www.gov.uk/european-growth-funding. The contractor is to undertake a Phase II interpretative ground assessment for the site at Kenyon Way, Little Hulton, Salford. The Phase II report is to assess the ground based geotechnical and environmental risks, constraints and liabilities associated with the proposed development of the site which is to be redeveloped as a ground mounted solar photovoltaic (PV) facility. The Phase II report is required to support contaminated land planning conditions, allow the design of economic foundation solutions and determine whether the local ground is suitable for the installation of the ground mounted solar photovoltaic (PV) facility. The site is approximately 3.4 ha in size. The proposed solar PV facility development will include equipment that will be generally low lying (approx. height 2.4m) and capable of screening from surrounding vantage points. There will be a galvanised security fence of approx. 2.4m height around the site and there will be a proposed substation situated to the north west of the site. HV cables and other associated equipment cables will run beneath the site.  Refer to Phase 1 Geotechnical and Geo-Environmental Desk Study Report prepared by AECOM Limited for further information (report revision 0 dated 28 February 2020).
Žaliasis pirkimas

Rizikos analizė

Prisijunkite, kad galėtumėte naudoti rizikos analizę.

Prisijungti

Laimėjimo strategija

Prisijunkite, kad galėtumėte naudoti laimėjimo strategijos rekomendacijas.

Prisijungti

Konkurentai

Atnaujinkite, kad matytumėte, kurios įmonės greičiausiai pateiks pasiūlymą šiam konkursui, remiantis istoriniais viešųjų pirkimų duomenimis.

Prisijungti

Reikalavimai ir kvalifikacija

AI reikalavimų analizė šiam konkursui dar nepasiekiama.

Reikalavimai bus sugeneruoti automatiškai, kai bus apdoroti konkurso dokumentai.


Pagrindiniai reikalavimai

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokumentai

Šiam konkursui nėra apdorotų dokumentų.

Dokumentai čia pasirodys, kai tik jie bus atsisiųsti ir išanalizuoti.

Analizė vykdoma

Šio konkurso kokybės analizė yra apdorojama. Prašome patikrinti vėliau.

Įtraukti į „Pipeline“