Demolition of two multi-family residential buildings and two utility buildings at ul. Bełkowska 8 and 9 in Czerwionka-Leszczyny

Open
Deadline
4 days left
April 09, 2026
Contract Details
Category
Construction
Reference
2026/BZP 00170281/01
Value
Not disclosed
Location
Śląskie, Poland
Published
March 28, 2026
CPV Code
Project Timeline

Tender Published

March 25, 2026

Deadline for Questions

April 02, 2026

Submission Deadline

April 09, 2026

Win ProbabilityPRO
🔒
Upgrade to Professional
See your estimated win probability based on historical data.
Upgrade to Professional →
Sector InsightsPRO
🔒
Unlock Sector Insights
See average winning prices, competition levels, and market trends.
Upgrade to Professional →
Budget
Not disclosed
Duration
Not specified
Location
Śląskie
Type
Construction
75
Quality Score/100
Good
Market Benchmark
Avg. Winning Price
€12,641,706
Avg. Bids
0.1
Competition
Low
SME Winners
86%
133,693 tenders analyzed

Original Tender Description

Demolition of two multi-family residential buildings and two utility buildings at ul. Bełkowska 8 and 9 in Czerwionka-Leszczyny

Run Risk Analysis

Identify potential risks, inconsistencies, and red flags across all tender documents. Get a detailed risk report with severity levels and mitigation recommendations.

Login

Win Strategy

AI-powered analysis of this tender's requirements, opportunities, and challenges. Get strategic insights to maximize your win probability.

65%
Estimated Win ProbabilityModerate Fit

This tender focuses on the demolition of residential and utility buildings. A winning strategy will emphasize technical expertise in demolition, meticulous adherence to design documentation, and a competitive, value-driven price. Given the lack of specified evaluation criteria, a proactive approach to demonstrating best value and minimizing risk for the contracting authority is crucial.

Key Winning Messages

Reliable and efficient demolition execution aligned with detailed design specifications.

Minimizing risk and ensuring project completion within budget and scope, regardless of quantity variations.

Demonstrating a clear understanding of the contracting authority's needs through meticulous planning and execution.

Key Opportunities
Potential for competitive pricing due to the absence of explicit social value or green procurement requirements, allowing focus on core demolition cost-effectiveness.
Opportunity to differentiate through superior project management and risk mitigation strategies, especially concerning the obligation to complete all works from design documentation.
The extended submission deadline (2026-04-09) provides ample time for thorough planning, cost estimation, and proposal development.
Key Challenges
Lack of specified evaluation criteria makes it difficult to optimize the bid for specific scoring metrics. The focus will be on demonstrating overall best value and risk reduction.

Develop a comprehensive proposal that clearly articulates the bidder's capabilities, experience, and a robust methodology for execution. Proactively address potential risks and demonstrate how they will be managed. Highlight cost-effectiveness and adherence to all technical requirements.

The requirement to perform all works from design documentation, irrespective of Bill of Quantities (BoQ) discrepancies, introduces significant cost and schedule risk if not accurately priced.

Conduct an extremely thorough review of Annexes 11, 12, and 13. Perform detailed site surveys and analysis of the design documentation to identify any potential ambiguities or areas where quantities might be underestimated. Build in appropriate contingency within the pricing to cover unforeseen variations.

Absence of information on mandatory exclusion grounds, eligibility, and financial requirements necessitates a cautious approach, ensuring all standard compliance checks are performed.

Thoroughly review all available tender documents for any implicit requirements. Conduct due diligence on the contracting authority and the project's context. Ensure all standard legal, financial, and operational compliance is met and documented.

Ideal Bidder Profile
An experienced demolition contractor with a proven track record in executing similar projects, possessing strong project management capabilities, a skilled workforce, and a robust health and safety culture. The ideal bidder will also be adept at cost control and risk management, capable of interpreting and executing complex design documentation.
Key Requirements
Execution of demolition of two multi-family residential buildings and two utility buildings.
Familiarization with the detailed documentation of the subject of the order, including: "Project of significant changes to the building design for the reconstruction of a multi-family residential building into a social housing building and the demolition of a multi-family residential building and a utility building" - Annex No. 11 to the SWZ. Technical Specification for the Performance and Acceptance of Construction Works - Annex No. 12 to the SWZ. Bill of Quantities - Annex No. 13 to the SWZ.
The Contractor will be obliged to perform all works resulting from the design documentation, even if the bill of quantities contains underestimated or overestimated quantities.
Offer submission deadline: 2026-04-09T05:00:00Z.
Key Discriminators
Demonstrated expertise in handling complex demolition projects with a focus on safety and environmental best practices (even if not explicitly required).
A highly detailed and transparent pricing structure that clearly addresses the risk associated with quantity variations.
A proactive approach to risk management and a clear plan for site logistics and waste management.
Evidence of successful completion of similar projects, particularly those involving residential structures.
Social Value Opportunities
While not explicitly required, consider proposing local employment opportunities or waste diversion initiatives. Frame these as enhancing community relations and demonstrating corporate responsibility, which can indirectly appeal to the contracting authority.
Bid Focus Areas
Technical Capability (Execution of Demolition & Documentation Adherence)

Provide detailed project plans, methodologies, and evidence of past performance in similar demolition projects. Emphasize the team's experience in interpreting and executing complex technical documentation. Clearly outline the process for ensuring all design requirements are met, especially concerning quantity variations.

Price/Cost

Develop a highly competitive and realistic price that accounts for the risk of quantity variations. Ensure the pricing is transparent and justifiable, demonstrating value for money. Avoid overly aggressive pricing that could signal a lack of understanding of the project's complexities.

Risk Management

Present a comprehensive risk assessment and mitigation plan, specifically addressing potential issues arising from the design documentation and quantity variations. This demonstrates foresight and reduces perceived risk for the contracting authority.

Recommendations6
Thoroughly Analyze Design Documentation and Bill of Quantities
CriticalHigh effort

Conduct an exhaustive review of Annexes 1, 11, 12, and 13. Perform detailed site inspections and quantity take-offs to identify any discrepancies or potential underestimations in the Bill of Quantities. This is crucial for accurate pricing and fulfilling the obligation to complete all works.

Ensures accurate pricing, avoids cost overruns, and guarantees compliance with the tender requirements.
Develop a Robust Risk Mitigation Strategy
CriticalMed effort

Given the lack of specified evaluation criteria and the risk associated with quantity variations, a strong emphasis on risk management is essential. Detail how potential risks (e.g., unforeseen site conditions, material handling, waste disposal) will be identified, assessed, and mitigated.

Reduces perceived risk for the contracting authority, potentially leading to a more favorable evaluation.
Highlight Proven Demolition Expertise and Safety Record
HighMed effort

Showcase a strong track record in similar demolition projects, emphasizing technical competence, efficient project execution, and an impeccable health and safety record. Provide case studies or references if possible.

Builds confidence in the bidder's ability to deliver the project successfully and safely.
Prepare a Detailed and Transparent Cost Proposal
HighHigh effort

The pricing should be detailed, clearly itemizing costs and explicitly addressing the contingency for potential quantity variations. Transparency in pricing will build trust and demonstrate a realistic understanding of the project's scope.

Enhances credibility and provides the contracting authority with confidence in the bid's financial viability.
Consider Proactive Social Value Commitments
LowLow effort

Although not mandatory, consider incorporating elements like local employment, waste reduction, or community engagement into the proposal. Frame these as added value and responsible corporate citizenship.

Can provide a subtle competitive edge and demonstrate a forward-thinking approach.
Clarify Ambiguities with the Contracting Authority
CriticalLow effort

If any ambiguities are found in the tender documentation (Annexes 11, 12, 13), proactively seek clarification from the contracting authority through the designated channels before the submission deadline. This demonstrates diligence and prevents misinterpretations.

Avoids potential disputes and ensures a clear understanding of project scope and requirements.
Competitive Positioning
Position the bid as the most reliable and risk-averse option by demonstrating a deep understanding of the technical requirements and a robust plan for managing quantity variations. Emphasize cost-effectiveness derived from efficient execution and meticulous planning, rather than simply being the lowest price.

Competitors

Upgrade to see which companies are likely to bid on this tender, based on historical procurement data.

Login

Requirements & Qualifications

11 requirements across 5 categories

Submission (2)
Mandatory (1)
Compliance (1)
Technical (6)
Financial (1)
SUBMISSION REQUIREMENTS2
--Offer submission deadline: 2026-04-09T05:00:00Z.
--The offer should include the execution of all works resulting from the design documentation.
MANDATORY EXCLUSION GROUNDS1
--No information in the provided text.
ELIGIBILITY REQUIREMENTS1
--No information in the provided text.
TECHNICAL CAPABILITY REQUIREMENTS6
--Execution of demolition of two multi-family residential buildings and two utility buildings.
--Familiarization with the detailed documentation of the subject of the order, including:
--"Project of significant changes to the building design for the reconstruction of a multi-family residential building into a social housing building and the demolition of a multi-family residential building and a utility building" - Annex No. 11 to the SWZ.
FINANCIAL REQUIREMENTS1
--No information in the provided text.

Requirements Preview

Sign up to view complete requirements and analysis

Documents

2 documents available with AI summaries

Notice PDFPDF
08de8a48-1fb5-0157-056e-e50001aab236.pdf

This document is a tender notice for the demolition of two multi-family residential buildings and two utility buildings in Czerwionka-Leszczyny, Poland.

Zał nr 14 do SWZ Formularz ofertowy.docDOC
Zał nr 14 do SWZ Formularz ofertowy.doc

This document contains the tender offer form for the demolition of two multi-family residential buildings and two utility buildings in Czerwionka-Leszczyny.

Documents Preview

Sign up to view document summaries and analysis

75
Good

Tender Quality Score

This tender for demolition works is generally well-structured, with clear documentation and a reasonable set of technical requirements. However, the absence of a disclosed estimated value and explicit evaluation criteria slightly diminishes its completeness and fairness.

Score Breakdown

Legal Compliance75/100

The tender benefits from a clear procedure and proper CPV coding. While deadlines are generally reasonable, the absence of an explicit reveal date for the estimated value prevents a full assessment of regulatory compliance in that regard. No disputes are indicated.

Clarity80/100

The description of the demolition works is clear and detailed, with specific reference to supporting documents like design projects and technical specifications. The AI-extracted requirements accurately reflect the information provided.

Completeness70/100

Most basic information is present, including deadlines, a reference number, and organizational details. However, the estimated value is not disclosed, which is a significant omission. Contract duration is also not specified.

Estimated Value Not Disclosed
Contract Duration Not Specified
Fairness85/100

The tender promotes fairness through the provision of full documentation access, including design plans and technical specifications. The e-procurement characteristic is a positive indicator. The criteria are objective in terms of technical capability, and the deadline, while active, is not excessively short. No specific tailoring to individual companies is apparent.

Practicality65/100

The tender is marked as e-procurement, which is positive. However, specific details regarding financing are not disclosed, and the contract start date is missing. The deadline, while active, could be considered short by some potential bidders given the scope implied by the documentation.

Financing Information Not Disclosed
Missing Contract Start Date
Data Consistency90/100

Key fields such as title, reference, organization, and description are populated correctly. Dates are logical and no suspension or disputes are indicated. The CPV code and NUTS code are also consistent.

Sustainability50/100

There is no explicit mention of green procurement, social aspects, or innovation in the tender. The reliance on EU funding is not specified. This area is underdeveloped.

No Green Procurement Criteria
No Social Procurement Criteria

Strengths

Clear description of works
Comprehensive technical documentation provided
E-Procurement enabled
Objectivity in technical requirements

Concerns

Estimated value not disclosed
Missing evaluation criteria
Lack of sustainability considerations

Recommendations

1. Disclose the estimated value of the contract.
2. Specify the evaluation criteria for submitted bids.
3. Incorporate sustainability elements where applicable.

AI Scoring Preview

Sign up to view complete requirements and analysis

Complete quality score analysis
Detailed sub-score breakdown
Strengths & concerns insights
Strategic recommendations

No credit card required • Setup in 2 minutes

New Service

Want us to handle this tender?

Our procurement experts prepare everything. Proven to work — you review, approve, and submit.

~1hYour time only
80%+80%+
$0Upfront
See full comparison
Without TaaSWith TaaS
40-80 hrs
Preparation time
~1 hr
Your time only
15-25%
Average win rate
80%+
Win rate
Risk of errors
Manual review
Expert QA
Compliance check
You do all
Handle everything
We do all
End-to-end service
Let's Win This Tender
Pay only when you win · 400+ companies trust us
Or do it yourself

Add to Pipeline