Skip to main content
Looking to bid on government tenders? See our TaaS tender preparation service
Tenders

Development of construction concept documentation, construction, and author's supervision of an innovative, integrated low-temperature floor heating system, and design of a ventilation system for the RCT Dairy Pavilion

Open
Deadline
3 days left
April 08, 2026
Contract Details
Category
Construction
Reference
161683
Value
Not disclosed
Location
Riga, Latvia
Published
March 19, 2026
CPV Code
Project Timeline

Tender Published

March 19, 2026

Deadline for Questions

April 01, 2026

Submission Deadline

April 08, 2026

Tender Opening

April 08, 2026

Win ProbabilityPRO
🔒
Upgrade to Professional
See your estimated win probability based on historical data.
Upgrade to Professional →
Sector InsightsPRO
🔒
Unlock Sector Insights
See average winning prices, competition levels, and market trends.
Upgrade to Professional →
Budget
Not disclosed
Duration
5 months
Location
Riga
Type
Construction
75
Quality Score/100
Good
Market Benchmark
Avg. Winning Price
€491,981
Avg. Bids
3.0
Competition
Low
SME Winners
99%
20,606 tenders analyzed

Original Tender Description

Development of construction concept documentation, construction, and author's supervision of an innovative, integrated low-temperature floor heating system, and design of a ventilation system for the RCT Dairy Pavilion
EU Funded

Run Risk Analysis

Identify potential risks, inconsistencies, and red flags across all tender documents. Get a detailed risk report with severity levels and mitigation recommendations.

Login

Win Strategy

AI-powered analysis of this tender's requirements, opportunities, and challenges. Get strategic insights to maximize your win probability.

70%
Estimated Win ProbabilityModerate Fit

This tender requires a comprehensive approach to developing, constructing, and supervising an innovative low-temperature floor heating system and designing a ventilation system for the RCT Dairy Pavilion. A winning bid will focus on demonstrating technical expertise, adherence to specifications, and a clear understanding of the project's integrated nature, leveraging the limited evaluation criteria to our advantage.

Key Winning Messages

Integrated Expertise: Seamless delivery of innovative low-temperature heating and ventilation systems through unified design, construction, and supervision.

Proven Performance: Demonstrated success in delivering complex HVAC projects on time and to specification for public sector clients.

Future-Ready Solutions: Commitment to efficient and sustainable building services that meet the specific needs of the RCT Dairy Pavilion.

Key Opportunities
The absence of specified evaluation criteria suggests a strong emphasis on meeting all mandatory requirements and demonstrating technical competence. This allows bidders to focus on a comprehensive and compliant proposal.
The 'innovative' aspect, though not explicitly detailed, presents an opportunity to showcase forward-thinking design and construction methodologies for low-temperature heating, potentially exceeding basic requirements.
The short 5-month duration requires a highly efficient project management and execution plan, which can be a differentiator if presented convincingly.
Key Challenges
The lack of specified evaluation criteria makes it difficult to prioritize bid elements and understand the weighting of different aspects. This requires a balanced approach to all requirements.

Address all mandatory requirements with equal rigor. Focus on demonstrating comprehensive technical capability and adherence to the contract draft and technical specifications. Assume that technical compliance and demonstrable capability will be paramount.

The 'innovative' aspect is subjective and not detailed, posing a risk of misinterpretation or failing to meet the contracting authority's unstated expectations.

Thoroughly review the technical specification for any implicit requirements or hints towards innovation. Propose solutions that are demonstrably advanced in terms of energy efficiency, control systems, or material usage within the context of low-temperature heating. Highlight any unique or cutting-edge aspects of the proposed system.

The 5-month duration is aggressive for a project involving design, construction, and supervision, requiring meticulous planning and resource allocation.

Develop a detailed project schedule with clear milestones and contingency plans. Demonstrate strong project management capabilities and resource availability to ensure timely completion. Highlight past experience with similar compressed timelines.

Ideal Bidder Profile
A medium-to-large construction and engineering firm with proven experience in integrated HVAC systems, specifically low-temperature heating, and a strong track record in public sector projects within Latvia. The ideal bidder will possess in-house design capabilities for both heating and ventilation, and a robust project management team capable of delivering within a tight 5-month timeframe.
Key Requirements
Development of an innovative, integrated low-temperature floor heating system.
Construction of the innovative, integrated low-temperature floor heating system.
Supervision of the innovative, integrated low-temperature floor heating system.
Design of a ventilation system for the RCT Dairy Pavilion.
Compliance with the technical specification for the heating and ventilation system.
Submission of a site visit confirmation.
Use of the provided technical proposal template.
Adherence to the contract draft.
Key Discriminators
Demonstrated experience in designing and implementing integrated low-temperature floor heating systems that achieve superior energy efficiency and occupant comfort.
A robust and well-articulated project management plan that clearly outlines how the 5-month deadline will be met without compromising quality.
Evidence of successful collaboration with public sector clients and a deep understanding of Latvian procurement regulations.
A proactive approach to risk management, identifying potential issues and proposing concrete mitigation strategies.
Social Value Opportunities
While 'Social Aspects: No' is stated, a bidder could voluntarily propose a commitment to local employment or skills development for the construction phase, framing it as a contribution to the community and a demonstration of responsible contracting. For example, 'Commitment to sourcing at least 70% of the construction workforce from the local Riga region and offering on-the-job training opportunities for apprentices.'
Bid Focus Areas
Technical Capability (Heating System)

Provide detailed technical documentation, including design principles, material specifications, and performance calculations for the innovative low-temperature floor heating system. Emphasize energy efficiency, controllability, and integration with the building's overall structure. Showcase past projects with similar systems.

Technical Capability (Ventilation System)

Present a clear and comprehensive ventilation design that addresses the specific needs of a dairy pavilion (e.g., air quality, temperature control, humidity management). Ensure compliance with relevant building codes and standards. Highlight any energy-saving features of the ventilation system.

Project Management and Delivery

Develop a detailed, realistic, and achievable project plan that clearly demonstrates how the 5-month duration will be met. Include resource allocation, critical path analysis, and risk mitigation strategies. Highlight the experience of the project management team.

Compliance and Documentation

Meticulously follow all submission requirements, including the use of the provided templates and adherence to the contract draft. Ensure all mandatory attachments are included and accurately completed. A site visit confirmation is critical.

Recommendations7
Conduct Thorough Site Visit
CriticalMed effort

Mandatory site visit confirmation is required. A detailed site visit will allow for a deeper understanding of the RCT Dairy Pavilion's specific conditions, enabling a more accurate and tailored proposal for both heating and ventilation systems, and identifying potential challenges early.

Ensures compliance, informs technical proposal, identifies risks.
Focus on Technical Excellence and Compliance
CriticalHigh effort

Given the unspecified evaluation criteria, assume that meeting all technical requirements and demonstrating robust capability in both heating and ventilation design and construction will be paramount. Provide detailed, evidence-based technical proposals.

Maximizes scoring potential in the absence of explicit weighting.
Highlight 'Innovative' Aspects
HighMed effort

While 'innovative' is not defined, proactively showcase any advanced technologies, energy-efficient solutions, or unique design approaches in the low-temperature floor heating system that go beyond standard practice. This could include smart control systems, advanced insulation techniques, or novel material applications.

Sets the bid apart from competitors offering standard solutions.
Develop a Detailed 5-Month Project Plan
HighHigh effort

The 5-month duration is a significant constraint. A comprehensive and realistic project plan, including resource allocation, key milestones, and risk mitigation, is essential to demonstrate feasibility and build confidence.

Increases perceived capability and reduces perceived risk for the contracting authority.
Address Potential Ambiguity in 'Innovative'
MediumLow effort

If the technical specification provides no further detail on 'innovative', consider including a section in the proposal that outlines the bidder's interpretation of innovation in this context and how their proposed solution embodies it, referencing best practices and industry advancements.

Proactively manages a potential point of confusion or subjective evaluation.
Voluntary Social Value Contribution
LowLow effort

Although not mandated, consider including a voluntary commitment to local employment or skills development. This can be a positive differentiator and align with broader public sector objectives, even if not explicitly evaluated.

Enhances corporate social responsibility image, potential minor differentiator.
Strict Adherence to Templates and Contract
CriticalMed effort

The tender explicitly requires using the provided technical proposal template and adhering to the contract draft. Deviations can lead to disqualification. Ensure meticulous attention to detail in formatting and content.

Ensures compliance and avoids administrative rejection.
Competitive Positioning
Position the bid as the most technically competent and reliable partner for delivering an integrated, high-performance heating and ventilation solution for the RCT Dairy Pavilion. Emphasize a proven track record in similar public sector projects and a proactive approach to project management that guarantees timely delivery within the tight 5-month timeframe. Highlight any unique technological advantages or efficiencies offered by the proposed 'innovative' system.

Competitors

Upgrade to see which companies are likely to bid on this tender, based on historical procurement data.

Login

Requirements & Qualifications

14 requirements across 5 categories

Submission (5)
Mandatory (1)
Compliance (2)
Technical (5)
Financial (1)
SUBMISSION REQUIREMENTS5
--Bidders must submit a site visit confirmation.
--Bidders must use the provided technical proposal template.
--Bidders must adhere to the contract draft.
MANDATORY EXCLUSION GROUNDS1
--No specific mandatory exclusion grounds are detailed in the provided summaries.
ELIGIBILITY REQUIREMENTS2
--Bidders must be able to develop, construct, and supervise an innovative, integrated low-temperature floor heating system and ventilation design.
--Bidders must comply with the regulations outlined in the tender documents.
TECHNICAL CAPABILITY REQUIREMENTS5
--Development of an innovative, integrated low-temperature floor heating system.
--Construction of the innovative, integrated low-temperature floor heating system.
--Supervision of the innovative, integrated low-temperature floor heating system.
FINANCIAL REQUIREMENTS1
--No specific financial requirements are detailed in the provided summaries.

Requirements Preview

Sign up to view complete requirements and analysis

Documents

5 documents available with AI summaries

Iepirkuma priekšmeta prasības, 1.versijaPDF
161683_PD.ANY_1_1_1_20260319104404.pdf -- 95.6 KB

This document outlines the tender requirements for the development, construction, and supervision of an innovative, integrated low-temperature floor heating system and ventilation system design for the RCT Dairy Pavilion.

LīgumsDOC
Liguma projekts_pielikums_9.docx -- 117.7 KB

This document contains a draft contract for the development, construction, and supervision of an innovative low-temperature floor heating system and ventilation design for the Riga Central Market's Milk Pavilion, awarded through tender CAIP 2025/143.

Nolikuma pielikumiZIP
Nolikuma pielikumi.zip -- 4.4 MB

This document contains attachments for a tender, including a site visit confirmation, a technical proposal template, and a technical specification for an innovative heating and ventilation system for the Riga Central Market.

Nolikums_2025_143DOC
Nolikums_2025_143_FIN.docx -- 134.4 KB

This document contains the regulations for an open tender procedure for the development, construction, and supervision of an innovative, integrated low-temperature floor heating system and ventilation system design for the Riga Central Market's Dairy Pavilion.

Main tender pageHTM
index.html

This document contains the basic data for an open tender procedure (CAIP 2025/143) for the development, construction, and supervision of an innovative low-temperature floor heating system and ventilation design for the RCT Dairy Pavilion.

Documents Preview

Sign up to view document summaries and analysis

75
Good

Tender Quality Score

This tender for innovative floor heating and ventilation system design and construction is generally well-structured, with clear technical requirements and available documentation. However, the lack of disclosed financial value and specific evaluation criteria slightly impacts fairness and completeness.

Score Breakdown

Legal Compliance75/100

The tender follows an open procedure with a clear CPV code and is EU funded, indicating good regulatory compliance. Deadlines appear reasonable within the context of the tender's scope. No disputes are noted.

Clarity80/100

The description of the works is specific, detailing the innovative nature of the heating system and the ventilation design. Key requirements are outlined, and the availability of technical specifications and contract drafts enhances clarity.

Completeness70/100

Most basic information is present, including title, reference, organization, and duration. However, the estimated value is not disclosed, which is a significant omission for bidders assessing the project's scale. Key documents like technical specifications and contract drafts are available.

Estimated value not disclosed
Fairness85/100

The tender is an open procedure with e-procurement, promoting fairness. All required documents are accessible. However, the absence of disclosed evaluation criteria makes it difficult for bidders to understand how their proposals will be assessed, potentially impacting perceived fairness.

No evaluation criteria specified
Practicality65/100

The tender utilizes e-procurement, which is a positive aspect. However, the specific mention of 'e-submission' is not explicitly confirmed in the provided data, and the 'document URL' is not detailed. Financing information is not provided, and while contract duration is stated, the start date is not.

No explicit confirmation of e-submission mechanism
Document URL not detailed
Data Consistency90/100

Key fields such as title, reference, organization, and deadlines are populated. The tender status is active, and there are no reported disputes or suspensions, indicating good data consistency.

Sustainability50/100

While the tender mentions an 'innovative' system, there are no explicit criteria related to green procurement, social aspects, or specific innovation drivers beyond the technical description. The 'EU Funded' characteristic is noted but doesn't automatically imply sustainability focus.

No explicit green procurement criteria
No explicit social criteria

Strengths

Clear technical requirements and scope
Open e-procurement procedure
Availability of key tender documents (technical specs, contract draft)
Well-defined CPV code and EU funding indication

Concerns

Estimated value not disclosed
Lack of specified evaluation criteria
Limited information on practical submission details (e-submission confirmation, document URL)
Absence of explicit sustainability or social criteria

Recommendations

1. Disclose the estimated financial value of the tender.
2. Publish clear evaluation criteria to ensure transparency and fairness.
3. Provide specific details on the e-submission process and direct document URLs.

AI Scoring Preview

Sign up to view complete requirements and analysis

Complete quality score analysis
Detailed sub-score breakdown
Strengths & concerns insights
Strategic recommendations

No credit card required • Setup in 2 minutes

New Service

Want us to handle this tender?

Our procurement experts prepare everything. Proven to work — you review, approve, and submit.

~1hYour time only
80%+80%+
$0Upfront
See full comparison
Without TaaSWith TaaS
40-80 hrs
Preparation time
~1 hr
Your time only
15-25%
Average win rate
80%+
Win rate
Risk of errors
Manual review
Expert QA
Compliance check
You do all
Handle everything
We do all
End-to-end service
Let's Win This Tender
Pay only when you win · 400+ companies trust us
Or do it yourself

Add to Pipeline