Skip to main content
Tenders

Greenham Control Tower - New Roofs

Open
Deadline
33 days left
April 30, 2026
Contract Details
Category
Open Procedure
Reference
022296-2026
Value
£90,000
Location
London, United Kingdom
Published
March 20, 2026
CPV Code
Project Timeline

Tender Published

March 12, 2026

Deadline for Questions

April 23, 2026

Submission Deadline

April 30, 2026

Contract Start Date

June 30, 2026

Budget
£90,000
Duration
2 months
Location
London
Type
Open Procedure
75
Quality Score/100
Good

Original Tender Description

Inspection, repair, and partial refurbishment of existing flat roof areas on Greenham Control Tower, including gutter replacement and removal of redundant utility pipework. Works involve removing defective coverings, substrate repairs, insulation and waterproofing installation, and drainage improvements.

Risk Analysis

Please log in to use risk analysis.

Login

Win Strategy

Please log in to access winning strategy recommendations.

Login

Competitors

Upgrade to see which companies are likely to bid on this tender, based on historical procurement data.

Login

Requirements & Qualifications

12 requirements across 5 categories

Submission (1)
Mandatory (1)
Compliance (1)
Technical (8)
Financial (1)
SUBMISSION REQUIREMENTS1
--[No specific submission requirements detailed in the provided text]
MANDATORY EXCLUSION GROUNDS1
--[No specific mandatory exclusion grounds detailed in the provided text]
ELIGIBILITY REQUIREMENTS1
--Suitably qualified contractors
TECHNICAL CAPABILITY REQUIREMENTS8
--Experience in inspection, repair, and partial refurbishment of existing flat roof areas.
--Experience in guttering replacement.
--Experience in removal of redundant utility pipework.
FINANCIAL REQUIREMENTS1
--[No specific financial requirements detailed in the provided text]

Requirements Preview

Sign up to view complete requirements and analysis

Documents

No processed documents available for this tender.

Documents will appear here once they are downloaded and analyzed.

75
Good

Tender Quality Score

This tender for roof refurbishment at Greenham Control Tower is generally well-structured with clear technical requirements, but lacks specific evaluation criteria and details on submission methods, impacting practicality.

Score Breakdown

Legal Compliance75/100

The tender adheres to basic legal requirements with a clear procedure (open competition below threshold) and a proper CPV code. Deadlines appear reasonable for the scope. No disputes are noted. The primary legal concern is the absence of specified evaluation criteria, which is a regulatory requirement in many jurisdictions.

Missing evaluation criteria
Clarity80/100

The description of works is clear and detailed, outlining specific tasks such as inspection, repair, guttering replacement, and pipework removal. Technical requirements are well-defined, specifying experience in various roofing and associated works. The conditions for a compliant and watertight roof are also clearly stated.

Completeness70/100

Most basic information is present, including title, reference, organization, estimated value, contract duration, and start date. However, the lack of content in the tender documents and the absence of specific financial or submission requirements detract from its completeness.

No document content available
No specific financial requirements detailed
Fairness85/100

The tender is an open competition, suggesting fairness. The value is disclosed, and the criteria for qualification (suitably qualified contractors) are objective. There are no apparent requirements tailored to specific companies. However, the lack of explicit evaluation criteria could be a point of concern for bidders.

Practicality65/100

The tender specifies a contract start date and duration. However, the absence of information regarding e-submission and the lack of accessible document content significantly hinder practical engagement for potential bidders.

No e-submission specified
No document content available
Data Consistency90/100

Key fields such as title, reference, organization, value, and dates are populated logically. The tender is active with no suspension or disputes. The timeline appears consistent.

Sustainability50/100

The tender mentions 'upgraded insulation and waterproofing systems' which could imply some environmental benefit, but there are no explicit green procurement, social, or innovation criteria mentioned. It is not indicated as EU funded.

Not green procurement
No social criteria

Strengths

Clear and detailed description of works
Well-defined technical requirements
Open competition procedure
Disclosure of estimated value

Concerns

Missing evaluation criteria
No document content available
No e-submission specified
Lack of explicit sustainability/social criteria

Recommendations

1. Specify evaluation criteria clearly.
2. Provide access to full tender documents with content.
3. Clarify the e-submission process.

AI Scoring Preview

Sign up to view complete requirements and analysis

Complete quality score analysis
Detailed sub-score breakdown
Strengths & concerns insights
Strategic recommendations

No credit card required • Setup in 2 minutes

New Service

Want us to handle this tender?

Our procurement experts prepare everything. Proven to work — you review, approve, and submit.

~1hYour time only
80%+80%+
$0Upfront
See full comparison
Without TaaSWith TaaS
40-80 hrs
Preparation time
~1 hr
Your time only
15-25%
Average win rate
80%+
Win rate
Risk of errors
Manual review
Expert QA
Compliance check
You do all
Handle everything
We do all
End-to-end service
Let's Win This Tender
Pay only when you win · 400+ companies trust us
Or do it yourself

Add to Pipeline