Skip to main content
Looking to bid on government tenders? See our TaaS tender preparation service
Tenders

Design and execution of renovation of bridge structures: Lot 1 – bridge over the Szufnarówka river in Szufnarowa in the course of DW986 Tuszyma–Wiśniowa, Lot 2 – bridge over the Sowina stream in Lubla in the course of DW988 Babica–Warzyce

Open
Deadline
9 days left
April 14, 2026
Contract Details
Category
Construction
Reference
2026/BZP 00176094/01
Value
Not disclosed
Location
Podkarpackie, Poland
Published
March 28, 2026
CPV Code
Project Timeline

Tender Published

March 30, 2026

Deadline for Questions

April 07, 2026

Submission Deadline

April 14, 2026

Win ProbabilityPRO
🔒
Upgrade to Professional
See your estimated win probability based on historical data.
Upgrade to Professional →
Buyer IntelligencePRO
🔒
Unlock Buyer Intelligence
See spending patterns, preferred procedures, and more.
Upgrade to Professional →
Sector InsightsPRO
🔒
Unlock Sector Insights
See average winning prices, competition levels, and market trends.
Upgrade to Professional →
Budget
Not disclosed
Duration
3 months
Location
Podkarpackie
Type
Construction
75
Quality Score/100
Good
Market Benchmark
Avg. Winning Price
€12,641,706
Avg. Bids
0.1
Competition
Low
SME Winners
86%
133,693 tenders analyzed

Original Tender Description

Design and execution of renovation of bridge structures: Lot 1 – bridge over the Szufnarówka river in Szufnarowa in the course of DW986 Tuszyma–Wiśniowa, Lot 2 – bridge over the Sowina stream in Lubla in the course of DW988 Babica–Warzyce

Run Risk Analysis

Identify potential risks, inconsistencies, and red flags across all tender documents. Get a detailed risk report with severity levels and mitigation recommendations.

Login

Win Strategy

AI-powered analysis of this tender's requirements, opportunities, and challenges. Get strategic insights to maximize your win probability.

65%
Estimated Win ProbabilityModerate Fit

This tender requires both the design and execution of bridge renovations for two distinct structures. A winning strategy will focus on demonstrating robust technical capability, efficient project management for a short 3-month duration, and a clear understanding of the functional-utility program. Given the lack of specified evaluation criteria, a proactive approach to highlighting value and expertise is crucial.

Key Winning Messages

Integrated Design & Execution Excellence: Seamlessly delivering both the design and construction phases for efficient, high-quality bridge renovations.

Proven Bridge Renovation Expertise: Demonstrating a strong track record in successfully completing similar bridge repair projects on time and to specification.

Agile Project Management for Short Durations: Highlighting the capability to manage and deliver complex renovations within the tight 3-month timeframe.

Key Opportunities
Potential for early engagement on design optimization.
Leveraging existing regional relationships.
Demonstrating cost-efficiency through optimized design and execution.
Key Challenges
Unspecified evaluation criteria.

Develop a bid that comprehensively addresses all stated requirements with a focus on quality, technical capability, and efficiency. Proactively highlight strengths in areas likely to be implicitly valued, such as project management, safety, and technical innovation (even if not explicitly requested).

Short 3-month duration for design and execution.

Develop a detailed, realistic, and resource-loaded project schedule that clearly demonstrates the feasibility of completing both design and construction within the timeframe. Highlight robust project management methodologies and experienced site teams.

Potential for high competition due to the nature of infrastructure projects.

Focus on clear differentiators, such as specialized expertise, innovative (even if minor) construction techniques, or a superior approach to risk management and quality assurance.

Ideal Bidder Profile
A mid-sized to large construction company with proven experience in bridge design and renovation projects, particularly those involving civil engineering and road infrastructure. The ideal bidder will possess strong in-house design capabilities, a skilled workforce experienced in bridge repairs, and a track record of delivering projects within tight timelines and to high-quality standards. Familiarity with Polish regional road authorities (like Podkarpacki Zarząd Dróg Wojewódzkich) and their typical project requirements would be advantageous.
Key Requirements
Development of technical documentation including the executive project.
Execution of works related to the renovation of 2 bridge structures.
Compliance with the functional-utility program.
Key Discriminators
A highly detailed and optimized executive project plan that demonstrates a deep understanding of the specific bridge structures and potential challenges, leading to a more efficient and cost-effective execution.
A proven methodology for rapid design iteration and approval processes, crucial for meeting the tight 3-month deadline.
Demonstrated experience with similar bridge types or geological conditions in the Podkarpackie region.
Social Value Opportunities
While 'Social Aspects: No' is stated, consider a voluntary commitment to local employment or training opportunities for residents in the vicinity of the project sites. This can be framed as a positive contribution to the community and a demonstration of corporate responsibility, potentially influencing implicit evaluation factors.
Bid Focus Areas
Technical Capability (Design & Execution)

Provide detailed evidence of past successful bridge design and renovation projects. Showcase the qualifications and experience of the design team and site personnel. Clearly outline the methodology for developing the executive project and executing the works, emphasizing quality control and safety protocols.

Project Management & Schedule Adherence

Present a comprehensive and realistic project schedule, highlighting key milestones and resource allocation. Demonstrate a robust project management framework capable of ensuring timely completion within the 3-month duration. Include contingency plans for potential delays.

Understanding of Functional-Utility Program

Thoroughly analyze the functional-utility program and demonstrate a clear understanding of its requirements. Explain how the proposed design and execution plan will fully meet and potentially exceed these requirements, ensuring the long-term functionality and utility of the renovated bridges.

Recommendations6
Develop a Detailed Executive Project Plan
CriticalHigh effort

Create a comprehensive executive project plan that not only meets but anticipates the functional-utility program requirements. This plan should be highly detailed, showing clear methodologies for both design and execution, including specific construction techniques, material specifications, and quality assurance measures.

Ensures compliance with core technical requirements and demonstrates a high level of technical competence.
Proactive Value Engineering & Risk Mitigation
CriticalMed effort

Since evaluation criteria are not specified, proactively include a section on value engineering within the design phase to optimize cost and constructability, and a robust risk assessment and mitigation plan. This demonstrates foresight and a commitment to delivering value beyond the minimum requirements.

Addresses potential implicit evaluation factors and builds confidence in the bidder's ability to manage project complexities.
Highlight Specialized Bridge Renovation Expertise
HighMed effort

Showcase specific experience with the types of bridge structures involved (e.g., concrete, steel, specific span types) and the challenges associated with their renovation. Use case studies and testimonials to prove successful delivery of similar projects.

Establishes credibility and positions the bidder as a specialist, potentially outweighing competitors with broader but less specialized experience.
Develop a Robust 3-Month Project Schedule
HighHigh effort

Create a highly detailed and realistic project schedule that clearly allocates resources and timelines for both design and execution phases. Include critical path analysis and contingency planning to demonstrate feasibility within the tight 3-month duration.

Directly addresses the challenging project duration and instills confidence in the bidder's project management capabilities.
Voluntary Local Employment Commitment
LowLow effort

Despite 'Social Aspects: No', consider a voluntary commitment to utilizing local labor or subcontractors where feasible. Frame this as a benefit to the local community and a demonstration of responsible corporate citizenship.

May positively influence implicit evaluation factors and enhance the bidder's reputation.
Address Potential Site-Specific Challenges
MediumMed effort

Conduct a preliminary assessment of potential site-specific challenges (e.g., river flow, access, environmental considerations) for both bridge locations and outline how these will be managed during design and execution.

Demonstrates thoroughness and preparedness, reducing perceived risk for the contracting authority.
Competitive Positioning
Position the bid around integrated expertise, emphasizing the seamless transition from design to execution. Highlight the ability to deliver a complete solution efficiently. Focus on demonstrating a deep understanding of the specific technical challenges of bridge renovation and a proven track record of overcoming them within tight deadlines. Leverage any existing positive relationships with the Podkarpacki Zarząd Dróg Wojewódzkich to build trust and rapport.

Competitors

Upgrade to see which companies are likely to bid on this tender, based on historical procurement data.

Login

Requirements & Qualifications

7 requirements across 5 categories

Submission (1)
Mandatory (1)
Compliance (1)
Technical (3)
Financial (1)
SUBMISSION REQUIREMENTS1
--No information in the provided text.
MANDATORY EXCLUSION GROUNDS1
--No information in the provided text.
ELIGIBILITY REQUIREMENTS1
--No information in the provided text.
TECHNICAL CAPABILITY REQUIREMENTS3
--Development of technical documentation including the executive project.
--Execution of works related to the renovation of 2 bridge structures.
--Compliance with the functional-utility program.
FINANCIAL REQUIREMENTS1
--No information in the provided text.

Requirements Preview

Sign up to view complete requirements and analysis

Documents

1 documents available with AI summaries

Notice PDFPDF
08de8e24-35bb-2b7e-5fad-950001e7268e.pdf

This document contains a public procurement notice for the design and execution of bridge renovations on two specific locations in Poland.

Documents Preview

Sign up to view document summaries and analysis

75
Good

Tender Quality Score

This tender for bridge renovation is generally well-structured, with clear technical requirements and available documentation. However, the estimated value is undisclosed, and specific evaluation criteria are missing, impacting completeness and fairness.

Score Breakdown

Legal Compliance75/100

The tender adheres to general procurement principles with a clear CPV code and active status. Deadlines appear reasonable given the scope, though the submission deadline is relatively short. No disputes are indicated. The procedure type is not specified, which is a minor omission.

Procedure type not specified
Clarity80/100

The description of the works is clear, specifying the two bridge locations and the dual nature of the task (design and execution). The reference to the 'Program funkcjonalno – użytkowy' as an attachment for detailed requirements is a good practice for clarity.

Completeness70/100

Most basic information is present, including title, reference, organization, and deadlines. However, the estimated value of the contract is not disclosed, which is a significant omission. The duration is specified as 3 months. Key documents are available.

Estimated value not disclosed
Fairness85/100

The tender appears fair, with objective technical requirements and full document access. The use of e-procurement is noted. The absence of specific evaluation criteria could be a concern, but the requirements themselves do not appear tailored to specific companies.

Evaluation criteria not specified
Practicality65/100

The tender utilizes e-procurement, which is positive. The contract duration of 3 months is specified. However, information regarding financing is not provided, and the contract start date is not explicitly stated. The submission deadline is quite short.

Financing information not provided
Contract start date not specified
Data Consistency90/100

Key fields such as title, reference, organization, and deadlines are populated. There are no indications of suspension or disputes. Dates are logical, with the submission deadline well in the future relative to the publication date.

Sustainability50/100

There is no explicit mention of green procurement, social aspects, or innovation within the provided tender information. The tender is not indicated as EU-funded.

No explicit sustainability criteria (green, social, innovation)

Strengths

Clear technical requirements for bridge renovation
Availability of tender documents
Use of e-procurement
Well-defined CPV code and location

Concerns

Estimated contract value not disclosed
Missing specific evaluation criteria
Short submission deadline
Lack of sustainability considerations

Recommendations

1. Disclose the estimated contract value to provide better context for bidders.
2. Specify the evaluation criteria to ensure transparency and fairness in the selection process.
3. Consider extending the submission deadline to allow for more thorough preparation by potential bidders.

AI Scoring Preview

Sign up to view complete requirements and analysis

Complete quality score analysis
Detailed sub-score breakdown
Strengths & concerns insights
Strategic recommendations

No credit card required • Setup in 2 minutes

New Service

Want us to handle this tender?

Our procurement experts prepare everything. Proven to work — you review, approve, and submit.

~1hYour time only
80%+80%+
$0Upfront
See full comparison
Without TaaSWith TaaS
40-80 hrs
Preparation time
~1 hr
Your time only
15-25%
Average win rate
80%+
Win rate
Risk of errors
Manual review
Expert QA
Compliance check
You do all
Handle everything
We do all
End-to-end service
Let's Win This Tender
Pay only when you win · 400+ companies trust us
Or do it yourself

Add to Pipeline