Skip to main content
Looking to bid on government tenders? See our TaaS tender preparation service
Tenders

Construction of a general-purpose hall – Stage II

Open
Deadline
4 days left
April 08, 2026
Contract Details
Category
Construction
Reference
2026/BZP 00165930/01
Value
Not disclosed
Location
Podkarpackie, Poland
Published
March 28, 2026
Organization
CPV Code
Project Timeline

Tender Published

March 23, 2026

Deadline for Questions

April 01, 2026

Submission Deadline

April 08, 2026

Win ProbabilityPRO
🔒
Upgrade to Professional
See your estimated win probability based on historical data.
Upgrade to Professional →
Buyer IntelligencePRO
🔒
Unlock Buyer Intelligence
See spending patterns, preferred procedures, and more.
Upgrade to Professional →
Sector InsightsPRO
🔒
Unlock Sector Insights
See average winning prices, competition levels, and market trends.
Upgrade to Professional →
Budget
Not disclosed
Duration
Not specified
Location
Podkarpackie
Type
Construction
75
Quality Score/100
Good
Market Benchmark
Avg. Winning Price
€12,641,706
Avg. Bids
0.1
Competition
Low
SME Winners
86%
133,693 tenders analyzed

Original Tender Description

Construction of a general-purpose hall – Stage II

Run Risk Analysis

Identify potential risks, inconsistencies, and red flags across all tender documents. Get a detailed risk report with severity levels and mitigation recommendations.

Login

Win Strategy

AI-powered analysis of this tender's requirements, opportunities, and challenges. Get strategic insights to maximize your win probability.

65%
Estimated Win ProbabilityModerate Fit

This tender for the construction of a general-purpose hall (Phase II) by Gmina Cieszanów presents a moderate competition opportunity. A winning bid will focus on demonstrating robust technical capability, particularly in electrical and HVAC systems, and leveraging the lack of specified evaluation criteria to propose a highly competitive price while ensuring quality and timely delivery. The absence of explicit green or social value requirements allows for a price-centric strategy, but demonstrating efficiency in the photovoltaic and energy storage aspects can still be a subtle differentiator.

Key Winning Messages

Reliable and Efficient Hall Construction: Delivering a high-quality, functional general-purpose hall on time and within budget, with a focus on robust electrical, HVAC, and energy solutions.

Cost-Effective Solution with Integrated Energy Efficiency: Offering a competitive price while incorporating a modern photovoltaic and energy storage system for long-term operational benefits.

Key Opportunities
Lack of specified evaluation criteria allows for a strong price-driven bid.
Opportunity to differentiate through efficient design and execution of the photovoltaic and energy storage system.
Potential to propose value-engineered solutions for electrical and HVAC systems given the open-ended nature of these requirements.
The absence of explicit green and social value requirements simplifies bid preparation, allowing focus on core technical and price elements.
Key Challenges
Lack of detailed evaluation criteria makes it difficult to optimize bid scoring.

Assume price will be a dominant factor. Focus on delivering a technically sound proposal that meets all mandatory requirements at a competitive price. If possible, seek clarification from the contracting authority regarding evaluation methodology.

Undisclosed estimated value and duration can lead to uncertainty in cost estimation and resource allocation.

Conduct thorough market research and internal cost analysis based on similar past projects. Build in contingency for unforeseen issues. Clearly define project timelines and resource needs in the bid.

Potential for ambiguity in technical requirements without further detail.

Proactively seek clarification on any unclear technical specifications. Present a detailed technical solution that clearly addresses each requirement, demonstrating a deep understanding of the project's needs.

Ideal Bidder Profile
A construction company with proven experience in industrial hall construction, specifically demonstrating expertise in electrical installations (including integration with existing infrastructure), HVAC systems, photovoltaic installations with energy storage, and industrial flooring. The ideal bidder will have a strong track record of delivering projects on time and within budget, with a clear understanding of Polish construction regulations and standards. They should also possess the financial stability to undertake a project of this nature, even with undisclosed value.
Key Requirements
Impact plate at the hall and ground hardening necessary for the proper functioning of the warehouse.
Section of electrical installation from the existing meter cable on the plot to the electrical box and from the box to the fire protection switch on the hall wall.
Photovoltaic installation on the hall roof and an energy storage unit enclosed by walls and a ceiling with fire-rated doors.
Mechanical supply and exhaust ventilation installation with a ventilation unit and hall heating via a duct system.
Industrial garage doors in the quantity of 2 pcs.
Industrial floor in the storage room.
Gres tile floor in the technical room (energy storage).
Key Discriminators
A highly competitive price coupled with a technically superior and well-integrated photovoltaic and energy storage system.
Demonstrated efficiency and speed in project execution through a well-defined project plan and experienced team.
Proactive and clear communication throughout the bidding process, including seeking clarifications where necessary.
Social Value Opportunities
While not explicitly required, consider a commitment to local employment or training opportunities as a subtle differentiator, especially if local sourcing is feasible. This can be framed as a benefit to the Gmina Cieszanów community.
Bid Focus Areas
PriceN/A (assumed high)

Develop a highly competitive pricing strategy by optimizing material costs, labor, and overheads. Ensure all direct and indirect costs are accurately accounted for, with a small but strategic profit margin.

Technical ComplianceN/A (assumed high)

Thoroughly address all technical requirements, providing detailed specifications and methodologies for each component. Highlight the experience and expertise of the project team in delivering similar complex installations.

Photovoltaic & Energy Storage SystemN/A (assumed medium-high)

Present a well-designed, efficient, and reliable photovoltaic and energy storage solution. Emphasize the long-term cost savings and operational benefits for the Gmina Cieszanów, even if not a primary evaluation criterion.

Recommendations6
Clarify Technical Specifications
CriticalMed effort

Proactively seek clarification from Gmina Cieszanów regarding any ambiguities in the technical requirements, particularly concerning the scope of electrical and HVAC installations, and the exact specifications for the impact plate and ground hardening.

Ensures a compliant and accurate bid, reducing the risk of post-award disputes or costly variations.
Develop a Price-Centric Strategy
CriticalHigh effort

Given the unspecified evaluation criteria, assume price will be a dominant factor. Conduct a rigorous cost analysis to identify opportunities for cost optimization without compromising quality or compliance.

Maximizes the chances of winning in a potentially price-sensitive procurement.
Highlight PV & Energy Storage Expertise
HighMed effort

Detail the proposed photovoltaic and energy storage system, emphasizing its efficiency, reliability, and potential for long-term operational cost savings for the contracting authority. Showcase experience with similar integrated systems.

Adds value beyond the basic requirements and can serve as a subtle differentiator.
Develop a Detailed Project Plan
HighMed effort

Create a comprehensive project plan outlining key milestones, resource allocation, and risk mitigation strategies. This demonstrates organizational capability and commitment to timely delivery.

Builds confidence in the bidder's ability to execute the project effectively.
Consider Local Community Engagement
LowLow effort

If feasible and cost-effective, include a commitment to local employment or sourcing of materials/services. Frame this as a benefit to the Gmina Cieszanów.

May offer a minor competitive advantage or positive perception, especially in local government tenders.
Contingency Planning for Unknowns
MediumMed effort

Incorporate a reasonable contingency into the pricing and schedule to account for the undisclosed estimated value and duration, and potential unforeseen site conditions or regulatory changes.

Protects profitability and project timelines.
Competitive Positioning
Position the bid as the most cost-effective yet technically sound solution, emphasizing reliability and efficiency in the core construction and integrated energy systems. Highlight the bidder's proven track record in delivering similar industrial construction projects on time and within budget.

Competitors

Upgrade to see which companies are likely to bid on this tender, based on historical procurement data.

Login

Requirements & Qualifications

12 requirements across 5 categories

Submission (1)
Mandatory (1)
Compliance (1)
Technical (8)
Financial (1)
SUBMISSION REQUIREMENTS1
--No information
MANDATORY EXCLUSION GROUNDS1
--No information
ELIGIBILITY REQUIREMENTS1
--No information
TECHNICAL CAPABILITY REQUIREMENTS8
--Impact plate at the hall and ground hardening necessary for the proper functioning of the warehouse.
--Section of electrical installation from the existing meter cable on the plot to the electrical box and from the box to the fire protection switch on the hall wall.
--General lighting installation, 230V socket outlets, and 400V socket outlets.
FINANCIAL REQUIREMENTS1
--No information

Requirements Preview

Sign up to view complete requirements and analysis

Documents

2 documents available with AI summaries

Notice PDFPDF
08de88b2-7312-67a1-056e-e50001aa965b.pdf

This document is a tender notice for the construction of a general-purpose hall, phase II, issued by the Municipality of Cieszanów, requiring electronic submission of bids.

SWZ.pdfPDF
SWZ.pdf

This document contains the Specifications for the Procurement Procedure (SWZ) for the construction of a general-purpose hall - phase II, detailing the contracting authority, general information, financing, and a description of the subject of the contract.

Documents Preview

Sign up to view document summaries and analysis

75
Good

Tender Quality Score

This tender for the construction of a general-purpose hall - phase II by GMINA CIESZANÓW is generally well-structured, with clear technical requirements and available documentation. However, the undisclosed estimated value and lack of specified evaluation criteria are notable concerns.

Score Breakdown

Legal Compliance75/100

The tender appears to comply with general procurement regulations, including a proper CPV code and active status. The procedure type is not specified, which is a minor omission. No disputes are indicated. Deadlines are present but could be considered tight given the scope.

Clarity80/100

The description of the works is detailed and specific, outlining the required technical capabilities clearly. The AI-extracted requirements provide a good overview of the expected technical specifications.

Completeness70/100

Most basic information is present, including the title, reference, organization, and a deadline. However, the estimated value and contract duration are not disclosed, impacting overall completeness.

Estimated value not disclosed
Contract duration not specified
Fairness85/100

The tender provides full access to documents and specifies technical requirements objectively. The use of e-procurement is a positive aspect. The lack of disclosed estimated value could be a concern for bidders in assessing their competitiveness.

Estimated value not disclosed
Practicality65/100

The tender specifies e-procurement, which is practical. However, the contract start date is missing, and financing information is not detailed, which could hinder practical planning for potential bidders.

Contract start date missing
Financing information not detailed
Data Consistency90/100

Key fields such as title, reference, organization, and deadline are populated. There are no indications of suspension or disputes. Dates are logically presented, with the submission deadline clearly stated.

Sustainability50/100

There is no explicit mention of green procurement, social aspects, or innovation within the tender documents. The inclusion of a photovoltaic installation and energy storage unit suggests some environmental consideration, but it is not formally integrated into sustainability criteria.

No explicit green procurement criteria
No explicit social criteria

Strengths

Clear and detailed technical requirements
Availability of tender documents
Use of e-procurement
Proper CPV code provided

Concerns

Estimated value not disclosed
Missing evaluation criteria
Contract duration not specified
Financing information not detailed

Recommendations

1. Disclose the estimated value of the contract.
2. Specify the evaluation criteria for bid assessment.
3. Provide details on the contract duration and financing.

AI Scoring Preview

Sign up to view complete requirements and analysis

Complete quality score analysis
Detailed sub-score breakdown
Strengths & concerns insights
Strategic recommendations

No credit card required • Setup in 2 minutes

New Service

Want us to handle this tender?

Our procurement experts prepare everything. Proven to work — you review, approve, and submit.

~1hYour time only
80%+80%+
$0Upfront
See full comparison
Without TaaSWith TaaS
40-80 hrs
Preparation time
~1 hr
Your time only
15-25%
Average win rate
80%+
Win rate
Risk of errors
Manual review
Expert QA
Compliance check
You do all
Handle everything
We do all
End-to-end service
Let's Win This Tender
Pay only when you win · 400+ companies trust us
Or do it yourself

Add to Pipeline