Mandatory compliance tender: Elektrilevi OÜ will only evaluate bids from contractors that already have (i) a 0.22-20 kV switching-authorised employee and (ii) a designated C-isik (works supervisor) both pre-registered in Elektrilevi’s Partner Portal before the deadline, must build the low-voltage connection at Vanamõisa by 16.01.2026 using Elektrilevi-supplied materials, submit an all-inclusive lump-sum price in the provided Excel template, and accept Elektrilevi’s standard payment terms and version-23 construction contract conditions without any deviations.
No summary available for this document.
Mandatory qualification: bidder must prove at least 3 similar low-voltage electrical construction contracts in the last 5 years, including at least one ≥ €40k (ex-VAT), and must allow Elektrilevi to contact past clients to verify performance—if you can’t meet this track-record requirement, skip this tender.
This Elektrilevi OÜ tender for a low-voltage connection in Vanamõisa village requires contractors to build per supplied project by 16 Jan 2026 (mandatory), while Elektrilevi provides all major equipment; bidders must simply offer the lowest tax-excluded lump-sum price (100 % weighting) and accept Elektrilevi’s latest standard construction contract terms, so any qualified electrical-works firm able to meet the deadline should bid.
Mandatory: no criminal/corruption/tax-debt exclusions and at least 3 low-voltage electrical construction contracts (≥1 ≥€50k) delivered in the last 5 years; voluntary: clean prior-contract record; Elektrilevi supplies meter, concentrator, substation & transformer, works must finish by 16 Jan 2026—bid only if you meet these compulsory qualification thresholds.
No summary available for this document.
Sign up to view document summaries and analysis
Comprehensive quality analysis of this tender scoring legal compliance, clarity, completeness, fairness, practicality, data consistency, and sustainability on a 0-100 scale with detailed breakdown and recommendations.
LoginHello! I'm your AI assistant for this tender. I can help you understand requirements, deadlines, eligibility criteria, and provide strategic insights.
No credit card required