Looking to bid on government tenders? See our TaaS tender preparation service
Tenders

2025-061 Technical Auditing for Engineering

Closed

Submission Deadline Has Passed

This tender's submission deadline has passed and is no longer accepting applications. The information below is kept for reference purposes.

Browse Active Tenders
Deadline
Expired
July 09, 2026
Contract Details
Category
Open Procedure
Reference
058319-2026
Value
£4,000,000
Location
United Kingdom
Published
July 02, 2026
Organization
CPV Code
Project Timeline

Tender Published

June 22, 2026

Deadline for Questions

July 02, 2026

Submission Deadline

July 09, 2026

Contract Start Date

September 02, 2026

Buyer IntelligencePRO
🔒
Unlock Buyer Intelligence
See spending patterns, preferred procedures, and more.
Upgrade to Professional →
Budget
£4,000,000
Duration
24 months
Location
United Kingdom
Type
Open Procedure

Original Tender Description

This procurement is for auditors to be employed by the Authority, to carry out asset management audits and engineering asset assurance inspections at gas and electricity sites. Ofgem requires a supplier to assess, inspect and investigate the asset management systems and equipment of licensees with a view to providing assurance that suitable governance is in place and equipment is being maintained in accordance with the relevant standards in practice. In order to do so, the suppliers may be required, but not limited to the following pieces of work: Item 1 The suppliers would provide their expert view on the following: Whether the Licensee’s asset management policies and procedures are fit for purpose and consistent with international best practice. Additionally, the supplier would provide an assessment of asset management maturity within the organisation. Whether licensees are following these policies and procedures correctly, in terms of the monitoring, maintenance and repair/replacement of their assets and whether the staff responsible for completing these procedures are appropriately trained. Whether licensees are accurately recording these activities, including into Network Asset Risk Metrics (NARMs)/other metrics, and making appropriate/timely interventions where issues are identified through such measures and otherwise. Item 2 The Inspectors provided by the suppliers will be employed to carry out engineering asset assurance surveys and Inspections at onshore gas and electricity sites. The scope of services, as further detailed in Annex A technical specification, would include (but is not limited to) the following: To inspect key electricity assets and systems including: transformers, reactors, circuit breakers, protection & control equipment, auxiliary systems, high voltage connections, cabling, busbars and buscouplers, disconnectors, earth switches, civil structures, fire suppression equipment, batteries, overhead lines (including towers and poles) and cables (including fluid filled systems, cooling and monitoring equipment). To inspect key gas assets and systems including: gas terminals, local distribution zone offtakes, above ground installations, pipeline safety and maintenance records, compressor stations, protection and control equipment, metering installations, odorant injection facilities, storage facilities, pressure control installations, auxiliary systems, civil structures, associated electrical and communication & instrumentation installations, gas monitoring and fire suppression equipment, pre-heating and cooling installations. For above assets that are within scope of the audit, review of maintenance schedules and plans and historic maintenance records, defects and repairs; also audit of technical and performance data submitted to Ofgem. The supplier’s inspectors will be asked to give a view as part of submitted reports and or presentations to Ofgem, on the adequacy of the maintenance regime, maintenance performance and forward plans for the assets based on their findings from the site visits and review of maintenance schedules and maintenance records. The supplier’s inspectors will also need to make recommendations on improvements to maintenance plans and performance where they identify gaps and shortcomings based on their findings from the audit, their knowledge of best practice and experience of working with other operators of similar equipment. Item 3 The supplier’s inspectors may also be asked to investigate the circumstances of electricity or gas network incidents or issues and provide a technical report to Ofgem setting out the root cause with conclusions about the wider circumstances and recommendations to ensure compliance with the relevant standards and policies. This work would involve: Inspecting the relevant plant and equipment Researching the circumstances of the incident or issue by reviewing data and other information Writing a report on findings and presenting it to Ofgem. For each inspection, Ofgem will require the suppliers to: A report on the findings from a process and procedures audit on each licensee. Item 1. A report detailing the findings of each site audit carried out. Item 2. A report detailing the facts and conclusions of a network incident. Item 3. A presentation to Ofgem setting out the findings from each audit / inspection / investigation. For further information, please refer to the attached Invitation to Tender (ITT) documents.

Risk Analysis

Risk analysis is not yet available for this country's tenders. Currently supported: Estonia, Latvia, Lithuania, Poland, France, UK, Denmark, Netherlands, Norway, and Finland.

Win Strategy

Get an AI-powered winning strategy tailored to this tender. Includes win probability score, key opportunities and challenges, recommended bid focus areas, competitive positioning insights, and actionable recommendations to maximize your chances.

Login

Competitors

Upgrade to see which companies are likely to bid on this tender, based on historical procurement data.

Login

Requirements & Qualifications

AI extracts and organizes all requirements from tender documents — mandatory qualifications, technical specifications, financial conditions, and submission rules — clearly categorized so you know exactly what's needed to bid.

Login

Basic Requirements

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Documents

3 documents available with AI summaries

OCDS RecordDOC
058319-2026_ocds_record.json

No summary available for this document.

OCDS Release PackageDOC
058319-2026_ocds_release.json

No summary available for this document.

Official PDF VersionPDF
058319-2026_official.pdf

No summary available for this document.

Documents Preview

Sign up to view document summaries and analysis

Quality Score

Comprehensive quality analysis of this tender scoring legal compliance, clarity, completeness, fairness, practicality, data consistency, and sustainability on a 0-100 scale with detailed breakdown and recommendations.

Login

Add to Pipeline