Looking to bid on government tenders? See our TaaS tender preparation service
Tenders

Electrical contracting at Frier Vest port terminal

Open
Deadline
33 days left
May 18, 2026
Contract Details
Category
Other
Reference
2026-106586
Value
Not disclosed
Location
Agder og Sor-Ostlandet, Norway
Published
April 08, 2026
Organization
CPV Code
Project Timeline

Tender Published

April 13, 2026

Deadline for Questions

May 11, 2026

Submission Deadline

May 18, 2026

Budget
Not disclosed
Duration
Not specified
Location
Agder og Sor-Ostlandet
Type
Other

Original Tender Description

The electrical contracting will be carried out as a total contract according to NS 8407, based on the attached functional description. Upon contract award, the contract is planned to be transferred to the total contractor for "Development of terminal area – phase 1". The total contractor for phase 1 establishes trenches, conduits/cable routes and other infrastructure in the ground, delivers the technical house and installs light poles (interface with electrical). The electrical contractor designs and specifies requirements for this infrastructure, verifies that the solution

Run Risk Analysis

Identify potential risks, inconsistencies, and red flags across all tender documents. Get a detailed risk report with severity levels and mitigation recommendations.

Login

Win Strategy

Get an AI-powered winning strategy tailored to this tender. Includes win probability score, key opportunities and challenges, recommended bid focus areas, competitive positioning insights, and actionable recommendations to maximize your chances.

Login

Competitors

Upgrade to see which companies are likely to bid on this tender, based on historical procurement data.

Login

Requirements & Qualifications

AI extracts and organizes all requirements from tender documents — mandatory qualifications, technical specifications, financial conditions, and submission rules — clearly categorized so you know exactly what's needed to bid.

Login

Basic Requirements

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Documents

19 documents available with AI summaries

External Tender DocumentsDOC

No summary available for this document.

01.01 ANSK-EL01-KB-091_F02 Del I - Konkurransebeskrivelse.pdfPDF
01.01 ANSK-EL01-KB-091_F02 Del I - Konkurrans... -- 543.0 KB

No summary available for this document.

01.02 ANSK-EL01-DL-100_F01 Dokumentliste.pdfPDF
01.02 ANSK-EL01-DL-100_F01 Dokumentliste.pdf -- 76.0 KB

No summary available for this document.

01.03 ANSK-EL01-PS-095_F02 Prisskjema.xlsxXLS
01.03 ANSK-EL01-PS-095_F02 Prisskjema.xlsx -- 48.0 KB

No summary available for this document.

01.04 ANSK-EL01-DS-096_F02 Dokumentasjonsskjema.xlsxXLS
01.04 ANSK-EL01-DS-096_F02 Dokumentasjonsskje... -- 33.0 KB

No summary available for this document.

02 ANSK-EL01-KG-092_F02 Del II - Kontraktsgrunnlaget - Elektroentreprise.pdfPDF
02 ANSK-EL01-KG-092_F02 Del II - Kontraktsgru... -- 639.0 KB

No summary available for this document.

15.01 52300159-RIM-09_F03 Miljørisikoanalyse og -vurdering FVH - etablering av t...PDF
15.01 52300159-RIM-09_F03 Miljørisikoanalyse ... -- 1.6 MB

No summary available for this document.

15.02 52300159-RIM-10_F03 Miljøoppfølgingsplan (MOP) FVH - etablering av termina...PDF
15.02 52300159-RIM-10_F03 Miljøoppfølgingspla... -- 1.1 MB

No summary available for this document.

16.01 SHA-plan - Frier Vest Havneterminal - Terminalområdet_V1.pdfPDF
16.01 SHA-plan - Frier Vest Havneterminal - T... -- 608.0 KB

No summary available for this document.

16.02 GH Terminalområdet_Hovedbedriftsavtale_V1.pdfPDF
16.02 GH Terminalområdet_Hovedbedriftsavtale_... -- 65.0 KB

No summary available for this document.

20.05 E3000_Rev F01 - Elkraft og føringsveier Terminalområde.pdfPDF
20.05 E3000_Rev F01 - Elkraft og føringsveier... -- 991.0 KB

No summary available for this document.

20.06 E1001_Rev H03.pdfPDF
20.06 E1001_Rev H03.pdf -- 1.8 MB

No summary available for this document.

20.07 E1002_Rev H02.pdfPDF
20.07 E1002_Rev H02.pdf -- 1.7 MB

No summary available for this document.

20.08 E1011_Rev H04.pdfPDF
20.08 E1011_Rev H04.pdf -- 1.1 MB

No summary available for this document.

20.09 E1012_Rev H04.pdfPDF
20.09 E1012_Rev H04.pdf -- 1.4 MB

No summary available for this document.

25.00 EL01-FB-111_Rev F02 Funksjonsbeskrivelse - Elektroentreprise.pdfPDF
25.00 EL01-FB-111_Rev F02 Funksjonsbeskrivels... -- 745.0 KB

No summary available for this document.

25.01 B700_Datasheet rotasjonsport.pdfPDF
25.01 B700_Datasheet rotasjonsport.pdf -- 371.0 KB

No summary available for this document.

25.02 Wiki_Datasheet foldeport.pdfPDF
25.02 Wiki_Datasheet foldeport.pdf -- 407.0 KB

No summary available for this document.

25.03 Wiki_Foundation drawing foldeport.pdfPDF
25.03 Wiki_Foundation drawing foldeport.pdf -- 978.0 KB

No summary available for this document.

Documents Preview

Sign up to view document summaries and analysis

Quality Score

Comprehensive quality analysis of this tender scoring legal compliance, clarity, completeness, fairness, practicality, data consistency, and sustainability on a 0-100 scale with detailed breakdown and recommendations.

Login

Add to Pipeline