The subject of the tender procedure is the construction works for phase V of the reconstruction of Virtsu fishing harbor, which include:
1) continuing quay reinforcement works, installing wooden fenders on concrete quays, constructing technical and external networks necessary for the operation of the harbor (including quay shore power posts, dry hydrants), and external lighting;
2) improving harbor safety and surveillance;
3) completing the construction of access roads to the quays and the slipway, quays, and essential areas for harbor use.
The works will be carried out during the years 2026 and 2027. The contract deadline is 31.05.2027.
The works will be carried out based on the preliminary design of the landscape architecture part, no: 3420 (attached).
EU FundedElectronic Submission
Run Risk Analysis
Identify potential risks, inconsistencies, and red flags across all tender documents. Get a detailed risk report with severity levels and mitigation recommendations.
Please don't leave this page — analysis may take a few minutes
Download
Analyze
Cross-check
Report
Did you know?
Tendly's AI reads every page of every tender document so you don't have to.
Win Strategy
Get an AI-powered winning strategy tailored to this tender. Includes win probability score, key opportunities and challenges, recommended bid focus areas, competitive positioning insights, and actionable recommendations to maximize your chances.
AI extracts and organizes all requirements from tender documents — mandatory qualifications, technical specifications, financial conditions, and submission rules — clearly categorized so you know exactly what's needed to bid.
Comprehensive quality analysis of this tender scoring legal compliance, clarity, completeness, fairness, practicality, data consistency, and sustainability on a 0-100 scale with detailed breakdown and recommendations.