Kingsway Tunnel Embankment Stabilisation - Outbound Road

Tender Overview

ORGANIZATION

Merseytravel

LOCATION

Merseyside, United Kingdom

VALUE

£2,000,000

DEADLINE

March 03, 2026 at 12:00

CATEGORY

Other

CPV CODE

45233100

REFERENCE

008788-2026

Project Timeline

Contact Information

View Original

Original Tender Description

The purpose of this commission is to seek the appointment of a specialist engineering contractor to provide Early Contractor Involvement and design of the slope stabilisation measures and variable messaging sign (VMS) foundation and superstructure, followed by the implementation of the design of the , Rockfall containment netting adjacent to the West bound carriageway of the A59 Kingsway Tunnel approach road between Mill Lane Bridge and Breck Road Bridge, together with the installation of the VMS foundation and superstructure and the associated power and data connections. In addition, remedial works to the existing drapery mesh to the inbound carriageway adjacent to Breck road. Services will include, but not be limited to: • Early contractor involvement/assessment/advice • Identification and procurement of any additional surveys required to complete the design • Design of the works to the outbound and inbound embankment as set out in this document and the VMS foundation and superstructure • Surveys and inspections associated with the design of the above elements • Support party wall surveyor in developing any necessary agreements with owners of adjacent properties • Vegetation clearance from the embankment • Provision of access for engineer inspection of embankment (as required) • Rock scaling works (as required) • Installation of slope stabilisation measures (Drapery mesh) • Support party wall surveyor in agreeing any necessary agreements with adjacent properties
⚠️

MANDATORY EXCLUSION GROUNDS

  • (None explicitly stated in the provided information)

ELIGIBILITY REQUIREMENTS

  • Be a specialist engineering contractor.
  • Register or log in to the Proactis procurement portal to access and participate in the tender.
  • Possess expertise in construction work for highways and roads (CPV 45233100).
🔧

TECHNICAL CAPABILITY REQUIREMENTS

  • Provide Early Contractor Involvement (ECI), assessment, and advice.
  • Identify and procure any additional surveys required to complete the design.
  • Design slope stabilisation measures and Variable Messaging Sign (VMS) foundation and superstructure.
  • Conduct surveys and inspections associated with the design elements.
  • Implement the design of rockfall containment netting adjacent to the West bound carriageway of the A59 Kingsway Tunnel approach road.
  • Install VMS foundation and superstructure, including associated power and data connections.
  • Perform remedial works to existing drapery mesh to the inbound carriageway adjacent to Breck road.
  • Support party wall surveyor in developing and agreeing necessary agreements with owners of adjacent properties.
  • Perform vegetation clearance from the embankment.
  • Provide access for engineer inspection of the embankment (as required).
  • Perform rock scaling works (as required).
  • Install slope stabilisation measures (Drapery mesh).
  • Demonstrate capability to complete the contract within 12 months.
💰

FINANCIAL REQUIREMENTS

  • Demonstrate financial capacity to undertake a project with an estimated contract value of 2,000,000 EUR.
📋

SUBMISSION REQUIREMENTS

  • Submit the bid by the deadline: 2026-03-03T12:00:00+00:00.
  • Participate in the tender via the Proactis procurement portal.

Requirements Preview

Sign up to view complete requirements and analysis

AI-powered requirement analysis
Complete compliance breakdown
Strategic bidding insights
Instant eligibility check

No credit card required • Setup in 2 minutes

HTM
Lot L-1
Administrative DocumentsL-1.html
Summary:
This document provides instructions for bidders to log in or register on the Proactis procurement portal to access and participate in the tender, along with details on cookie usage.
DOC
OCDS Record
OCDS Data008788-2026_ocds_record.json
Summary:
This tender seeks a specialist engineering contractor for Early Contractor Involvement, design, and implementation of slope stabilization measures and Variable Messaging Sign infrastructure on the A59 Kingsway Tunnel approach road.
DOC
OCDS Release Package
OCDS Data008788-2026_ocds_release.json
Summary:
Merseytravel seeks a specialist engineering contractor for Early Contractor Involvement, design, and implementation of slope stabilization measures and Variable Messaging Sign (VMS) infrastructure along the A59 Kingsway Tunnel approach road.
PDF
Official PDF Version
General Information008788-2026_official.pdf
Summary:
This tender seeks a specialist engineering contractor for the Early Contractor Involvement, design, and implementation of slope stabilisation measures and Variable Messaging Sign (VMS) foundation/superstructure installation on the A59 Kingsway Tunnel approach road.
HTM
Tender Notice
General Information008788-2026.html
Summary:
Merseytravel invites specialist engineering contractors for Early Contractor Involvement, design, and implementation of slope stabilisation, rockfall containment, and VMS foundation/superstructure installation on the A59 Kingsway Tunnel approach road.

Documents Preview

Sign up to view document summaries and analysis

AI document summaries
Key requirement extraction
Risk & compliance alerts
Strategic document insights

No credit card required • Setup in 2 minutes

66
Good

Tender Quality Score

This tender for Kingsway Tunnel Embankment Stabilisation is generally well-described with clear technical requirements and good data consistency, but critically lacks specified evaluation criteria, significantly impacting clarity, completeness, and fairness.

Score Breakdown

Legal Compliance70/100

The tender defines the procedure type and CPV codes appropriately, and there are no reported disputes. However, the reveal date is missing, the 'Liable Person' field is empty, and the absence of evaluation criteria represents a gap in mandatory disclosure requirements.

Missing reveal date
Empty 'Liable Person' field
Clarity65/100

The description of the scope of work and the AI-extracted technical requirements are clear and unambiguous. However, the critical absence of specified evaluation criteria makes it difficult for bidders to understand how their proposals will be assessed, significantly reducing overall clarity for the procurement process.

No evaluation criteria specified
Completeness65/100

Most basic information, including title, reference, organization, deadlines, value, duration, and location, is provided. Documents are also listed. Nevertheless, the tender is incomplete due to the missing evaluation criteria, the empty 'Liable Person' field, and missing codes for the procedure type.

No evaluation criteria specified
Empty 'Liable Person' field
Fairness50/100

Document access via the portal, disclosed value, reasonable submission time (from today's date), and e-procurement support contribute positively to fairness. However, the complete lack of specified evaluation criteria is a major concern, as it introduces subjectivity and reduces transparency in the award process, making it inherently less fair for bidders.

No evaluation criteria specified
Practicality85/100

The tender supports electronic submission, clearly states the contract start date and duration, and provides an estimated value. The overall process appears practical for bidders, despite the absence of a direct document URL in the provided summary.

No direct document URL provided in summary
Data Consistency75/100

Key dates are logical and consistent, and there are no reported disputes or suspensions. However, the 'Liable Person' field is empty, and the procedure type codes are missing, indicating minor data gaps and inconsistencies.

Empty 'Liable Person' field
Missing procedure type codes
Sustainability30/100

The tender does not explicitly include any green procurement, social aspects, or innovation focus. It is also not indicated as EU funded, which often correlates with higher sustainability standards.

No green procurement aspects
No social criteria

Strengths

Clear and detailed description of the scope of work
Estimated value, duration, and contract start date are clearly specified
Electronic submission via a dedicated portal is supported
CPV code is appropriately assigned, and location is provided
Requirements for technical capability and eligibility are well-defined

Concerns

Critical absence of specified evaluation criteria
Missing reveal date and 'Liable Person' information
No explicit mention of green, social, or innovation procurement aspects
Procedure type codes are missing
No direct document URL provided in the summary

Recommendations

1. Immediately publish clear and objective evaluation criteria to ensure fairness and transparency.
2. Complete all missing basic information, including the reveal date and liable person.
3. Consider integrating sustainability, social, or innovation clauses into future tenders.

AI Scoring Preview

Sign up to view complete requirements and analysis

Complete quality score analysis
Detailed sub-score breakdown
Strengths & concerns insights
Strategic recommendations

No credit card required • Setup in 2 minutes

Generate DocumentsReview Documents
B
Tender Quality Score
66/ 100 · Good

Tender Assistant

Ask me anything about this tender

Tender Assistant

Hello! I'm your AI assistant for this tender. I can help you understand requirements, deadlines, eligibility criteria, and provide strategic insights.

What are the main requirements?
When is the deadline?
Who is eligible to bid?

No credit card required

Setup in 2 minutes

Save with Notes