Atgal į konkursus

CP2251-22 Dawlish HIF

Uždarytas

Pateikimo terminas pasibaigė

Šio konkurso pateikimo terminas pasibaigė ir paraiškos nebepriimamos. Žemiau pateikta informacija saugoma informaciniais tikslais.

Naršyti aktyvius konkursus
Galutinis terminas
Pasibaigęs
Birželis 30, 2023
Informacija apie sutartį
Kategorija
Kita
Nuoroda
018621-2023
Vertė
£4,710,236
Vieta
United Kingdom, Jungtinė Karalystė
Paskelbta
Vasaris 24, 2026
Organizacija
CPV kodas
Projekto grafikas

Konkursas paskelbtas

Birželis 30, 2023

Klausimų pateikimo terminas

Birželis 23, 2023

Pasiūlymų pateikimo terminas

Birželis 30, 2023

Biudžetas
£4,710,236
Trukmė
Nenurodyta
Vieta
United Kingdom
Tipas
Kita

Originalus konkurso aprašymas

Devon County Council (DCC) are delivering a key piece of infrastructure on behalf of Teignbridge District Council (TDC) in the Shutterton area of Dawlish (Grid Ref – 296289, 78512). Homes England are an interested party. The scheme will provide a section of new link road, through a green field site, which will eventually join up with 3rd party infrastructure and housing deliveries. DCC’s scheme extends on from the first section of link road that has been built by Persimmon Homes. The “Dawlish HiF (Housing Infrastructure Fund)” scheme that DCC are delivering includes, but not limited to, the construction of: • A 26m span highway bridge • Approximately 110m of highway embankments on the approaches to the bridge, including carriageway and foot/cycle paths • Approximately 360m of at grade carriageway • Surface water and foul water drainage features • Drainage basins, swale and associated items • Ecological mitigation enhancement features • Landscaping • Fencing DCC will deliver the full scope of the works in connection with the delivery of the infrastructure between CH310 to CH800, on behalf of TDC. DCC and TDC had the option to deliver a reduced scope of works (CH310-440 only) only if the Tender offered by all Tenderer’s for the full scope of the works was above the available funding budget available or below the minimum quality or TDC Full Council did not approve the additional funding to allow for its award. In addition, DCC could not award all or some of the lots until the necessary Land and Highways Agreements had been secured. The maximum funding available for the works is £4,900,000.00. The maximum funding available for the reduced scope of works, in the eventuality that additional funding was not approved by TDC, is £3,700,000.00. The Procurement had been divided into Lots. Tenderers could bid for one or more of the following lots: Lot 1 Bridge and Spine Road (Entire scheme CH310-800) - Additional Funding This includes for the entire scheme works in accordance with the entirety of the Contract Documents. Therefore, the delivery of all features within the Contract Documents in connection to the delivery of infrastructure between Chainages 310 and 800. These works are consented under Planning Consents References 21/02872/FUL and 21/02674/MAJ. Lot 2 Bridge works alone (Reduced scheme CH310-440 only) - Additional Funding and Lot 3 Bridge works alone (Reduced scheme CH310-440 only) This includes for a reduced extent of scheme works. Lot 2 and 3 is for the delivery of all features within the Contract Documents in connection to the delivery of infrastructure between Chainages 310 and 440 only. These works are consented under Planning Consents Reference 21/02872/FUL. DCC expected to appoint 1 Contractor for Lot 1. If TDC Full Council did not approve the funding for the preferred tenderer’s Tender Price or tender returns be returned at a level that did not achieve a qualitative evaluation score of 50% or more of the total percentage available for quality or planning permission for the planning application reference ‘21/02674/MAJ’ was refused by TDC, DCC expected to appoint 1 Contractor for Lot 2 instead, which is a reduced scope of works. If TDC did not approve the additional funding required to deliver Lot 1 or 2, DCC expected to appoint 1 Contractor for Lot 3 instead. DCC reserved the right to not award all or some of the lots. Works are anticipated to commence Summer 2023.
Žaliasis pirkimas

Rizikos analizė

Prisijunkite, kad galėtumėte naudoti rizikos analizę.

Prisijungti

Laimėjimo strategija

Prisijunkite, kad galėtumėte naudoti laimėjimo strategijos rekomendacijas.

Prisijungti

Konkurentai

Atnaujinkite, kad matytumėte, kurios įmonės greičiausiai pateiks pasiūlymą šiam konkursui, remiantis istoriniais viešųjų pirkimų duomenimis.

Prisijungti

Reikalavimai ir kvalifikacija

AI reikalavimų analizė šiam konkursui dar nepasiekiama.

Reikalavimai bus sugeneruoti automatiškai, kai bus apdoroti konkurso dokumentai.


Pagrindiniai reikalavimai

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokumentai

Šiam konkursui nėra apdorotų dokumentų.

Dokumentai čia pasirodys, kai tik jie bus atsisiųsti ir išanalizuoti.

Analizė vykdoma

Šio konkurso kokybės analizė yra apdorojama. Prašome patikrinti vėliau.

Įtraukti į „Pipeline“