Tagasi hangete juurde

CP2251-22 Dawlish HIF

Suletud

Esitamise tähtaeg on möödunud

Selle hanke esitamise tähtaeg on möödunud ja taotlusi vastu ei võeta. Allolev teave on säilitatud viitamiseks.

Sirvi aktiivseid hankeid
Tähtaeg
Aegunud
Juuni 30, 2023
Lepingu üksikasjad
Kategooria
Muu
Viide
018621-2023
Väärtus
£4,710,236
Asukoht
United Kingdom, Ühendkuningriik
Avaldatud
Veebruar 23, 2026
Organisatsioon
CPV kood
Projekti ajakava

Hange avaldatud

Juuni 30, 2023

Küsimuste tähtaeg

Juuni 23, 2023

Esitamise tähtaeg

Juuni 30, 2023

Eelarve
£4,710,236
Kestus
Pole määratud
Asukoht
United Kingdom
Tüüp
Muu

Algne hanke kirjeldus

Devon County Council (DCC) are delivering a key piece of infrastructure on behalf of Teignbridge District Council (TDC) in the Shutterton area of Dawlish (Grid Ref – 296289, 78512). Homes England are an interested party. The scheme will provide a section of new link road, through a green field site, which will eventually join up with 3rd party infrastructure and housing deliveries. DCC’s scheme extends on from the first section of link road that has been built by Persimmon Homes. The “Dawlish HiF (Housing Infrastructure Fund)” scheme that DCC are delivering includes, but not limited to, the construction of: • A 26m span highway bridge • Approximately 110m of highway embankments on the approaches to the bridge, including carriageway and foot/cycle paths • Approximately 360m of at grade carriageway • Surface water and foul water drainage features • Drainage basins, swale and associated items • Ecological mitigation enhancement features • Landscaping • Fencing DCC will deliver the full scope of the works in connection with the delivery of the infrastructure between CH310 to CH800, on behalf of TDC. DCC and TDC had the option to deliver a reduced scope of works (CH310-440 only) only if the Tender offered by all Tenderer’s for the full scope of the works was above the available funding budget available or below the minimum quality or TDC Full Council did not approve the additional funding to allow for its award. In addition, DCC could not award all or some of the lots until the necessary Land and Highways Agreements had been secured. The maximum funding available for the works is £4,900,000.00. The maximum funding available for the reduced scope of works, in the eventuality that additional funding was not approved by TDC, is £3,700,000.00. The Procurement had been divided into Lots. Tenderers could bid for one or more of the following lots: Lot 1 Bridge and Spine Road (Entire scheme CH310-800) - Additional Funding This includes for the entire scheme works in accordance with the entirety of the Contract Documents. Therefore, the delivery of all features within the Contract Documents in connection to the delivery of infrastructure between Chainages 310 and 800. These works are consented under Planning Consents References 21/02872/FUL and 21/02674/MAJ. Lot 2 Bridge works alone (Reduced scheme CH310-440 only) - Additional Funding and Lot 3 Bridge works alone (Reduced scheme CH310-440 only) This includes for a reduced extent of scheme works. Lot 2 and 3 is for the delivery of all features within the Contract Documents in connection to the delivery of infrastructure between Chainages 310 and 440 only. These works are consented under Planning Consents Reference 21/02872/FUL. DCC expected to appoint 1 Contractor for Lot 1. If TDC Full Council did not approve the funding for the preferred tenderer’s Tender Price or tender returns be returned at a level that did not achieve a qualitative evaluation score of 50% or more of the total percentage available for quality or planning permission for the planning application reference ‘21/02674/MAJ’ was refused by TDC, DCC expected to appoint 1 Contractor for Lot 2 instead, which is a reduced scope of works. If TDC did not approve the additional funding required to deliver Lot 1 or 2, DCC expected to appoint 1 Contractor for Lot 3 instead. DCC reserved the right to not award all or some of the lots. Works are anticipated to commence Summer 2023.
Roheline hange

Riskianalüüs

Riskianalüüsi kasutamiseks palun logige sisse.

Logi sisse

Võidustrateegia

Võidustrateegia soovituste kasutamiseks logige sisse.

Logi sisse

Konkurendid

Uuendage, et näha, millised ettevõtted tõenäoliselt sellele hankele pakkumise esitavad, tuginedes ajaloolistele hankeandmetele.

Logi sisse

Nõuded ja kvalifikatsioonid

AI nõuete analüüs pole veel selle hanke jaoks saadaval.

Nõuded genereeritakse automaatselt, kui hankedokumendid on töödeldud.


Põhinõuded

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokumendid

Selle hanke jaoks pole töödeldud dokumente saadaval.

Dokumendid ilmuvad siia, kui need on alla laaditud ja analüüsitud.

Analüüs pooleli

Selle hanke kvaliteedianalüüsi töödeldakse. Palun kontrollige varsti uuesti.

Lisa halduspaneelile