To bid on this Elektrilevi OÜ tender for building an EV fast-charging connection in Otepää by 27 Feb 2026, a contractor must (mandatory) already have—or obtain before bid-opening—Elektrilevi-partner-portal registration for both a switching-authorised worker (0.22–20 kV network operations) and a C-person responsible for the works, submit an unconditional lump-sum price in the provided Excel template following Elektrilevi’s V178 guidance, and accept 14- or 35-day payment terms.
Mandatory: prove 60-month track record with ≥3 similar electrical-installation contracts (≥1 ≥€40k) and build-to-spec EV fast-charger connection at Otepää by 27 Feb 2026 while Elektrilevi supplies 240 mm² cable, substation and meter—bid only if you meet the experience threshold and can deliver on time.
This is a €0-budget, 100 % price-only contest to build an Elektrilevi-supplied 240 mm² medium-voltage cable connection for an EV fast-charger in Otepää by 27 Feb 2026—no special licenses are listed, so any licensed electrical contractor able to trench, pull and terminate 20 kV cable and give the lowest net price should bid.
To bid, contractors must confirm they have no criminal/tax debts (mandatory) and must demonstrate within the last 5 years at least one 240 mm² medium-voltage cable and substation installation project of similar scope; Elektrilevi will supply the 240 mm² cable, substation and meter, while the selected bidder must complete all remaining electrical-works for the EV fast-charging connection in Otepää by 27.02.2026—bid only if you can meet these mandatory past-performance and deadline requirements.
Elektrilevi OÜ’s mandatory, design-and-build tender requires an electrical contractor (with proven 20 kV cable and substation experience, valid excavation permits and P346 marking compliance) to construct the EV fast-charger connection at Valga mnt 1b, Otepää by 27 Feb 2026, supplying geo-referenced as-builts, photos and owner-consent proofs—bid only if you can deliver turn-key, utility-ready works and absorb any unplanned reinstatement costs.
Inscrivez-vous pour consulter les résumés et l'analyse des documents
L'analyse de la qualité de cet appel d'offres est en cours. Veuillez vérifier à nouveau dans quelques instants.
Bonjour ! Je suis votre assistant IA pour cet appel d'offres. Je peux vous aider à comprendre les exigences, les délais, les critères d'admissibilité et vous fournir des informations stratégiques.
Aucune carte de crédit requise