Skip to main content
Retour aux appels d'offres

Installations Capitales de Cuisines et Salles de Bain

Ouvert
Date limite
219 jours restants
Novembre 01, 2026
Détails du contrat
Catégorie
Restricted Procedure
Référence
019606-2026
Valeur
Non divulgué
Lieu
Surrey, East and West Sussex, Royaume-Uni
Publié
Mars 19, 2026
Code CPV
Calendrier du projet

Publication de l'appel d'offres

Mars 04, 2026

Date limite pour les questions

Octobre 25, 2026

Date limite de soumission

Novembre 01, 2026

Date de début du contrat

Novembre 01, 2026

Intelligence acheteurPRO
🔒
Débloquer l'intelligence acheteur
Consultez les modèles de dépenses, les procédures préférées et plus encore.
Passer au Professionnel →
Budget
Non divulgué
Durée
36 mois
Lieu
Surrey, East and West Sussex
Type
Restricted Procedure
75
Score de qualité/100
Bon

Description originale de l'appel d'offres

Les conseils de district de Guildford et Waverley recherchent un entrepreneur dûment qualifié et expérimenté pour réaliser un programme d'investissement planifié de remplacement de cuisines, salles de bains, toilettes et salles d'eau dans les propriétés résidentielles occupées et vacantes de leur parc de logements. L'étendue des travaux comprend le renouvellement complet des cuisines et des salles de bains, ainsi que les travaux mécaniques, électriques, de ventilation, de finition et de conformité réglementaire associés. L'entrepreneur sera tenu de maintenir les installations essentielles pour les résidents à tout moment (en veillant à ce qu'aucun locataire ne soit laissé sans fourniture de toilettes pendant la nuit), de minimiser les perturbations dans les logements occupés, de protéger et de rétablir, si nécessaire, les appareils appartenant aux locataires, et de garantir que toutes les installations sont entièrement testées et certifiées à l'achèvement. Tous les travaux doivent être conformes aux réglementations de construction en vigueur, à la norme BS 7671 (réglementations de câblage, 18e édition), au règlement sur l'approvisionnement en eau (appareils sanitaires) de 1999 et à toutes les autres exigences légales pertinentes. La durée proposée du contrat est de trois (3) ans, avec la possibilité, à la seule discrétion de l'Autorité, de la prolonger jusqu'à deux (2) périodes supplémentaires de douze (12) mois (1 + 1 an), soit une durée maximale potentielle de cinq (5) ans. L'acquisition sera menée selon une procédure flexible et concurrentielle conformément à la loi sur les marchés publics de 2023. Le processus comprendra deux étapes : Étape 1 – Étape de sélection (PSQ) Les fournisseurs devront soumettre un questionnaire de pré-qualification (PSQ) pour démontrer leur capacité organisationnelle, leur compétence technique et leur solidité financière. Suite à l'évaluation, un maximum de cinq (5) fournisseurs seront présélectionnés pour passer à l'étape de l'offre finale. Aucune attribution de contrat ne sera effectuée à ce stade. Étape 2 – Étape de l'offre finale Les fournisseurs présélectionnés seront invités à soumettre une offre technique et commerciale entièrement développée. Les soumissions seront évaluées selon les critères d'attribution publiés afin d'identifier l'offre la plus avantageuse pour l'attribution du contrat.

Analyse des risques

Veuillez vous connecter pour utiliser l'analyse des risques.

Se connecter

Stratégie gagnante

Connectez-vous pour accéder aux recommandations de stratégie gagnante.

Se connecter

Concurrents

Passez à un plan supérieur pour voir quelles entreprises sont susceptibles de soumissionner pour cet appel d'offres, basé sur les données historiques.

Se connecter

Exigences et qualifications

21 exigences dans 5 catégories

Soumission (6)
Obligatoire (1)
Conformité (3)
Technique (10)
Financier (1)
SUBMISSION REQUIREMENTS6
--Two-stage procurement process: Stage 1 – Selection Stage (PSQ) and Stage 2 – Final Tender Stage.
--Stage 1: Submit a Pre-Qualification Questionnaire (PSQ) to demonstrate organisational capability, technical competence and financial standing.
--Up to a maximum of five (5) suppliers will be shortlisted to progress to Stage 2.
MANDATORY EXCLUSION GROUNDS1
--No specific mandatory exclusion grounds are detailed in the provided text.
ELIGIBILITY REQUIREMENTS3
--Suitably qualified and experienced Contractor.
--Must be able to deliver a planned capital programme of kitchen, bathroom, WC and wet room replacement works.
--Must be able to work across occupied and void residential properties.
TECHNICAL CAPABILITY REQUIREMENTS10
--Full renewal of kitchens and bathrooms.
--Associated mechanical, electrical, ventilation, finishing and statutory compliance works.
--Maintain essential facilities for residents at all times (ensuring no tenant is left overnight without WC provision).
FINANCIAL REQUIREMENTS1
--Must demonstrate financial standing.

Aperçu des exigences

Inscrivez-vous pour consulter les exigences et l'analyse complètes

Documents

Aucun document traité n'est disponible pour cet appel d'offres.

Les documents apparaîtront ici une fois qu'ils auront été téléchargés et analysés.

75
Bon

Score de qualité de l'appel d'offres

This tender for Kitchen & Bathroom Capital Installations is generally well-structured with clear technical requirements and a defined two-stage process. However, the lack of disclosed financial value and specific evaluation criteria are notable weaknesses.

Répartition du score

Conformité légale75/100

The tender adheres to the Procurement Act 2023 and outlines a clear two-stage competitive flexible procedure. The CPV code is provided, and the contract duration is specified. The main concern is the lack of a disclosed estimated value, which can impact legal compliance regarding transparency thresholds, though it is marked as 'Value Classified'. Deadlines are present but the submission deadline relative to the contract start date might be tight depending on the actual release of full tender documents.

Estimated value not disclosed (marked as 'Value Classified')
Clarté80/100

The description of works is detailed and comprehensive, clearly outlining the scope, expected quality, and specific compliance requirements (Building Regulations, BS 7671, Water Supply Regulations). The two-stage process is also clearly explained. However, the absence of published award criteria in the provided text is a significant clarity issue.

No evaluation criteria specified
Exhaustivité70/100

Most basic information is present, including title, reference, organization, and a detailed description of works. The contract duration and potential extension are specified. However, the estimated financial value is not disclosed, and the content of the tender documents is not available, hindering a full assessment of completeness.

Estimated Value not disclosed
No document content available
Équité85/100

The tender uses a competitive flexible procedure and a two-stage process, which generally promotes fairness. The requirement for a PSQ to shortlist up to five suppliers is standard. The criteria for qualification are based on capability, competence, and financial standing, which are objective. The main concern is the lack of disclosed evaluation criteria for the final tender stage, which could impact fairness if not clearly communicated later. The value being classified also raises minor transparency concerns.

No evaluation criteria specified
Value Classified
Aspect pratique65/100

The tender specifies a two-stage process with a PSQ and a final tender. The contract duration and start date are provided. However, the lack of information regarding e-submission methods and the absence of document URLs for accessing the PSQ or other tender documents limit practicality. The contract start date being the same as the submission deadline is a significant practical issue.

No e-submission specified
Contract start date is the same as submission deadline
Cohérence des données90/100

Key fields such as title, reference, organization, CPV code, and contract duration are populated. The status is 'active'. There are no reported disputes. The dates provided (submission deadline and contract start) are logically inconsistent as they are identical, which is a critical data consistency issue.

Submission Deadline and Contract Start date are identical
Durabilité50/100

The tender description does not explicitly mention any green procurement, social aspects, or innovation requirements. This suggests a lack of focus on sustainability criteria within the tender's stated objectives.

No explicit mention of green procurement
No explicit mention of social aspects

Points forts

Detailed scope of works and technical requirements
Clear two-stage procurement process outlined
Compliance with relevant regulations specified
CPV code provided

Préoccupations

Submission deadline identical to contract start date
Estimated value not disclosed
No evaluation criteria specified
No document content available for review

Recommandations

1. Clarify and adjust the submission deadline and contract start date to allow adequate time for tender preparation and evaluation.
2. Disclose the estimated contract value and publish the evaluation criteria for the final tender stage.
3. Provide direct links or access methods for all tender documents.

Aperçu de la notation IA

Inscrivez-vous pour consulter les exigences et l'analyse complètes

Analyse complète du score de qualité
Répartition détaillée des sous-scores
Aperçu des forces et des préoccupations
Recommandations stratégiques

Aucune carte de crédit requise • Configuration en 2 minutes

Nouveau service

Vous voulez qu'on s'occupe de cet appel d'offres ?

Nos experts en marchés publics préparent tout. Solution éprouvée — vous relisez, validez et soumettez.

~1hVotre temps uniquement
80%+80%+
$0D'avance
Voir la comparaison complète
Sans TaaSAvec TaaS
40–80 heures
Temps de préparation
~1 heure
Votre temps uniquement
15–25%
Taux de réussite moyen
80%+
Taux de réussite
Risque d'erreurs
Vérification manuelle
QA expert
Contrôle de conformité
Vous faites tout
Gérez tout vous-même
Nous faisons tout
Service clé en main
Gagnons cet appel d'offres !
Payez uniquement en cas de victoire — frais de succès uniquement · Utilisé par plus de 400 entreprises
Ou faites-le vous-même

Ajouter au Pipeline