Vous souhaitez soumissionner aux marchés publics ? Découvrez notre service de préparation TaaS
Retour aux appels d'offres

M5 Junction 10 Improvements Scheme

Fermé

Date limite de soumission dépassée

La date limite de soumission de cet appel d'offres est dépassée et il n'accepte plus de candidatures. Les informations ci-dessous sont conservées à titre de référence.

Parcourir les appels d'offres actifs
Date limite
Expiré
Juin 16, 2023
Détails du contrat
Catégorie
Restricted Procedure
Référence
017973-2023
Valeur
Non divulgué
Lieu
Gloucestershire, Wiltshire and Bristol/Bath area, Royaume-Uni
Publié
Avril 12, 2026
Code CPV
Calendrier du projet

Publication de l'appel d'offres

Juin 23, 2023

Date limite pour les questions

Juin 09, 2023

Date limite de soumission

Juin 16, 2023

Budget
Non divulgué
Durée
Non spécifié
Lieu
Gloucestershire, Wiltshire and Bristol/Bath area
Type
Restricted Procedure

Description originale de l'appel d'offres

Gloucestershire faces significant challenges to achieve its vision for economic growth. A Joint Core Strategy (JCS) – a partnership between Gloucester City Council, Cheltenham Borough Council and Tewkesbury Borough Council was formed to produce a co-ordinated strategic development plan to show how the region will develop during the period up to 2031. This includes a shared spatial vision targeting 35,175 new homes and 39,500 new jobs by 2031. Major development of new housing (c.9,000 homes) and employment land (c.100ha) is proposed in strategic and safeguarded allocations in the West and North West of Cheltenham, much of which lies within Tewkesbury Borough Council. This, in turn, is linked to wider economic investment, including a government supported and nationally significant Cyber Park adjacent to GCHQ, predicted to generate c.7,000 jobs. The M5 J10 improvement scheme (Scheme or Project) is critical to achieving the vision set out above. The Scheme was also identified by Highways England in the Birmingham to Exeter Route Strategy as being critical to: (a) maintaining the safe and efficient operation of the M5 corridor; and (b) enabling the planned development and economic growth around Cheltenham, Gloucester and Tewkesbury. A Business Case for the Scheme was submitted in March 2019 to the Housing Infrastructure Fund, wherein the investment case was made. Funding was awarded successfully by HIF in March 2020. Further general information regarding background to the Scheme and its current status in the project lifecycle can be found at the following web link:- www.gloucestershire.gov.uk/J10 Scheme Objectives • Support economic growth and facilitate growth in jobs and housing by providing improved transport network connections in west and north-west Cheltenham. • Provide the transport connections and network capacity in west and north-west Cheltenham to facilitate the delivery of housing and economic development sites allocated or safeguarded in the Joint Core Strategy. • Provide a transport network in the west and north-west Cheltenham area with the levels of service, safety and accessibility to meet current and future needs. • Deliver a package of measures which is in keeping with the local environment , minimises any adverse environmental impacts and meets GCC’s ambition on sustainable growth, decarbonisation and net bio-diversity net gain. • Provide greater connectivity between Highways England’s Strategic Road Network (M5) and the transport network in west and north-west Cheltenham. • Provide a more integrated transport network by providing opportunities to switch to more sustainable transport modes within and to west, north-west and central Cheltenham. The Authority is conducting the procurement using the restricted procedure in accordance with the requirements of the Public Contracts Regulations 2015 (SI 2015/102) (PCR 2015) for the purpose of procuring the services and works described in the Scope.
Achats écologiques

Lancer l'analyse des risques

Identifiez les risques potentiels, les incohérences et les signaux d'alerte dans l'ensemble des documents de l'appel d'offres. Obtenez un rapport de risque détaillé avec les niveaux de gravité et les recommandations d'atténuation.

Se connecter

Stratégie gagnante

Obtenez une stratégie gagnante générée par l'IA et adaptée à cet appel d'offres. Comprend un score de probabilité de succès, les opportunités et défis clés, les axes prioritaires de l'offre, une analyse du positionnement concurrentiel et des recommandations concrètes pour maximiser vos chances.

Se connecter

Concurrents

Passez à un plan supérieur pour voir quelles entreprises sont susceptibles de soumissionner pour cet appel d'offres, basé sur les données historiques.

Se connecter

Exigences et qualifications

L'IA extrait et organise toutes les exigences des documents de l'appel d'offres — qualifications obligatoires, spécifications techniques, conditions financières et règles de soumission — clairement catégorisées pour que vous sachiez exactement ce qui est requis pour soumissionner.

Se connecter

Exigences de base

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Documents

Obtenez des résumés générés par l'IA de tous les documents de l'appel d'offres. Comprenez rapidement le contenu de chaque document sans lire des centaines de pages — couvrant le périmètre, les conditions, les critères d'évaluation et les obligations essentielles.

Se connecter

Score de qualité

Analyse qualitative complète de cet appel d'offres évaluant la conformité juridique, la clarté, l'exhaustivité, l'équité, la faisabilité, la cohérence des données et la durabilité sur une échelle de 0 à 100 avec une ventilation détaillée et des recommandations.

Se connecter

Ajouter au Pipeline