Tagasi hangete juurde

M5 Junction 10 Improvements Scheme

Suletud

Esitamise tähtaeg on möödunud

Selle hanke esitamise tähtaeg on möödunud ja taotlusi vastu ei võeta. Allolev teave on säilitatud viitamiseks.

Sirvi aktiivseid hankeid
Tähtaeg
Aegunud
Juuni 16, 2023
Lepingu üksikasjad
Kategooria
Muu
Viide
017973-2023
Väärtus
Ei avaldata
Asukoht
Gloucestershire, Wiltshire and Bristol/Bath area, Ühendkuningriik
Avaldatud
Veebruar 23, 2026
CPV kood
Projekti ajakava

Hange avaldatud

Juuni 23, 2023

Küsimuste tähtaeg

Juuni 09, 2023

Esitamise tähtaeg

Juuni 16, 2023

Eelarve
Ei avaldata
Kestus
Pole määratud
Asukoht
Gloucestershire, Wiltshire and Bristol/Bath area
Tüüp
Muu

Algne hanke kirjeldus

Gloucestershire faces significant challenges to achieve its vision for economic growth. A Joint Core Strategy (JCS) – a partnership between Gloucester City Council, Cheltenham Borough Council and Tewkesbury Borough Council was formed to produce a co-ordinated strategic development plan to show how the region will develop during the period up to 2031. This includes a shared spatial vision targeting 35,175 new homes and 39,500 new jobs by 2031. Major development of new housing (c.9,000 homes) and employment land (c.100ha) is proposed in strategic and safeguarded allocations in the West and North West of Cheltenham, much of which lies within Tewkesbury Borough Council. This, in turn, is linked to wider economic investment, including a government supported and nationally significant Cyber Park adjacent to GCHQ, predicted to generate c.7,000 jobs. The M5 J10 improvement scheme (Scheme or Project) is critical to achieving the vision set out above. The Scheme was also identified by Highways England in the Birmingham to Exeter Route Strategy as being critical to: (a) maintaining the safe and efficient operation of the M5 corridor; and (b) enabling the planned development and economic growth around Cheltenham, Gloucester and Tewkesbury. A Business Case for the Scheme was submitted in March 2019 to the Housing Infrastructure Fund, wherein the investment case was made. Funding was awarded successfully by HIF in March 2020. Further general information regarding background to the Scheme and its current status in the project lifecycle can be found at the following web link:- www.gloucestershire.gov.uk/J10 Scheme Objectives • Support economic growth and facilitate growth in jobs and housing by providing improved transport network connections in west and north-west Cheltenham. • Provide the transport connections and network capacity in west and north-west Cheltenham to facilitate the delivery of housing and economic development sites allocated or safeguarded in the Joint Core Strategy. • Provide a transport network in the west and north-west Cheltenham area with the levels of service, safety and accessibility to meet current and future needs. • Deliver a package of measures which is in keeping with the local environment , minimises any adverse environmental impacts and meets GCC’s ambition on sustainable growth, decarbonisation and net bio-diversity net gain. • Provide greater connectivity between Highways England’s Strategic Road Network (M5) and the transport network in west and north-west Cheltenham. • Provide a more integrated transport network by providing opportunities to switch to more sustainable transport modes within and to west, north-west and central Cheltenham. The Authority is conducting the procurement using the restricted procedure in accordance with the requirements of the Public Contracts Regulations 2015 (SI 2015/102) (PCR 2015) for the purpose of procuring the services and works described in the Scope.
Roheline hange

Riskianalüüs

Riskianalüüsi kasutamiseks palun logige sisse.

Logi sisse

Võidustrateegia

Võidustrateegia soovituste kasutamiseks logige sisse.

Logi sisse

Konkurendid

Uuendage, et näha, millised ettevõtted tõenäoliselt sellele hankele pakkumise esitavad, tuginedes ajaloolistele hankeandmetele.

Logi sisse

Nõuded ja kvalifikatsioonid

AI nõuete analüüs pole veel selle hanke jaoks saadaval.

Nõuded genereeritakse automaatselt, kui hankedokumendid on töödeldud.


Põhinõuded

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokumendid

Selle hanke jaoks pole töödeldud dokumente saadaval.

Dokumendid ilmuvad siia, kui need on alla laaditud ja analüüsitud.

Analüüs pooleli

Selle hanke kvaliteedianalüüsi töödeldakse. Palun kontrollige varsti uuesti.

Lisa halduspaneelile