Connectez-vous pour accéder aux recommandations de stratégie gagnante.
Se connecterPassez à un plan supérieur pour voir quelles entreprises sont susceptibles de soumissionner pour cet appel d'offres, basé sur les données historiques.
Se connecter12 exigences dans 5 catégories
Inscrivez-vous pour consulter les exigences et l'analyse complètes
4 documents disponibles avec des résumés IA
This OCDS record provides structured, machine-readable data detailing the London Borough of Camden's restricted tender for heating system upgrades at Rowley Way Estate, including buyer and publication information.
This OCDS Release Package provides structured, machine-readable data detailing the London Borough of Camden's tender for comprehensive heating system upgrades at Rowley Way Estate.
This tender notice details the Rowley Way Estate heating infrastructure works, requiring contractors to meet specific financial capacity (e.g., £35M turnover, 0.6 current ratio) and technical ability (e.g., three case studies demonstrating relevant experience) conditions for participation.
This tender notice outlines a £11.4M heating infrastructure upgrade project for Rowley Way Estate, requiring contractors with a minimum annual turnover of £35M and a current ratio of at least 0.6 in their two most recent financial years.
Inscrivez-vous pour consulter les résumés et l'analyse des documents
This tender for heating infrastructure works provides a clear project description and basic information but suffers from critical omissions, notably the absence of evaluation criteria and lack of e-submission, which significantly impact fairness and clarity. The financial requirements also appear disproportionately high relative to the project value.
The tender defines the procedure type and CPV codes correctly, and there are no reported disputes. However, the 'Missing reveal date' prevents a full assessment of compliance with minimum publication periods, and the summary lacks specific mandatory exclusion grounds.
The project description is highly detailed and unambiguous, and the AI-extracted technical and financial requirements are clear. A significant deficiency is the explicit absence of specified evaluation criteria, which is crucial for bidders to understand how their proposals will be assessed.
Basic information such as title, reference, organization, value, duration, and location are well-provided. All listed documents have summaries. However, the critical omission of evaluation criteria, along with an empty 'Liable Person' field and missing codes for procedure type, reduces overall completeness.
The tender value is disclosed, and from today's date, there is ample time for preparation. However, the lack of specified evaluation criteria severely compromises transparency and objectivity. The absence of e-submission creates barriers to equal access. Furthermore, the financial requirement of a £35M annual turnover for a £11.4M project appears disproportionately high and potentially restrictive, limiting competition to a very narrow pool of large contractors. The low current ratio requirement (0.6) is also unusual.
Key practical details like contract start date and duration are clearly specified. The most significant practical drawback is the explicit lack of electronic submission, which is a standard expectation for modern, efficient procurement processes.
The tender data is largely consistent, with no reported disputes and an active status. Dates are logical, although the submission deadline and contract start date being identical is uncommon. Minor inconsistencies include an empty 'Liable Person' field and missing codes for the procedure type and restricted type.
The tender does not explicitly incorporate any green procurement, social, or innovation criteria. It is also not EU funded, which often correlates with higher sustainability standards.
Inscrivez-vous pour consulter les exigences et l'analyse complètes
Aucune carte de crédit requise • Configuration en 2 minutes
Bonjour ! Je suis votre assistant IA pour cet appel d'offres. Je peux vous aider à comprendre les exigences, les délais, les critères d'admissibilité et vous fournir des informations stratégiques.
Aucune carte de crédit requise