Connectez-vous pour accéder aux recommandations de stratégie gagnante.
Se connecterPassez à un plan supérieur pour voir quelles entreprises sont susceptibles de soumissionner pour cet appel d'offres, basé sur les données historiques.
Se connecter12 exigences dans 5 catégories
Inscrivez-vous pour consulter les exigences et l'analyse complètes
8 documents disponibles avec des résumés IA
Bidders must confirm that their bid meets all conditions set forth in the tender documents, including submitting the bid price and adhering to environmental requirements.
Bidders must submit completed contract data on Form Annex 3, proving at least one construction technical condition survey of port facilities with a total cost of at least EUR 30,000 (excluding VAT) within the last 36 months.
The bidder must submit a completed cost table (Annex 4) with detailed bid costs for the technical surveys of port quays and the west mole.
The contracting authority will evaluate bids primarily based on cost, with the lowest price receiving the maximum score.
Bidders must confirm they do not meet exclusion grounds as per RHS § 95 and must have completed at least one contract for technical condition surveys of port facilities within the last 36 months, valued at a minimum of €30,000 (excluding VAT).
This document is a third party's (subcontractor's) consent allowing the bidder to rely on their qualifications in the procurement process.
This document is a power of attorney authorizing one bidder to submit a bid on behalf of another bidder for the technical surveys of Muuga port quays tender.
This document presents a proposal for submitting bids for technical surveys of Muuga port quays, outlining tender procedures and bidder qualification requirements.
Inscrivez-vous pour consulter les résumés et l'analyse des documents
This tender for technical surveys of Muuga port quays is generally well-structured, with clear requirements and a reasonable process. However, it could benefit from more explicit sustainability considerations and clearer documentation for certain technical specifications.
The tender appears to comply with general legal requirements, including a clear procedure and proper CPV code. Deadlines are reasonable, and there are no reported disputes. Regulatory compliance is assumed based on the provided information.
The description of the services required is clear, and the requirements are documented. Evaluation criteria are specified, although the primary focus on cost could be more detailed. Conditions are generally clear.
Most basic information is present, including value, duration, and deadlines. However, the technical description is in a ZIP file, which is not directly accessible for analysis, potentially impacting completeness. Financing conditions are referenced in the contract project.
The tender offers full document access and discloses the estimated value. Deadlines are reasonable, and criteria are objective (primarily cost-based). E-procurement is utilized. No specific company tailoring was detected.
E-submission and e-procurement are in place. The contract start date is not explicitly stated but implied by the contract duration. Financing information is referenced in the contract project. The duration is specified.
Key fields are populated, and there are no reported suspensions or disputes. Dates appear logical and consistent within the provided information.
The tender includes 'Green Procurement' as a characteristic, which is positive. However, there are no explicit social aspects or innovation focuses mentioned, and it is not indicated as EU funded.
Inscrivez-vous pour consulter les exigences et l'analyse complètes
Aucune carte de crédit requise • Configuration en 2 minutes
Nos experts en marchés publics préparent tout. Solution éprouvée — vous relisez, validez et soumettez.
Bonjour ! Je suis votre assistant IA pour cet appel d'offres. Je peux vous aider à comprendre les exigences, les délais, les critères d'admissibilité et vous fournir des informations stratégiques.
Aucune carte de crédit requise