Tenders

Reconstruction of water and sewerage pipelines on Sõle street, Kolde avenue, and Auna street, and construction of rainwater pipelines

Open
Deadline
35 days left
April 07, 2026
Contract Details
Category
Construction
Reference
305753
Value
€5,500,000
Location
Estonia
Published
February 18, 2026
CPV Code
Evaluation Criteria
Tender cost100%
Project Timeline

Tender Published

February 18, 2026

Deadline for Questions

March 31, 2026

Submission Deadline

April 07, 2026

Tender Opening

April 07, 2026

Contract Start Date

April 15, 2026

Win ProbabilityPRO
🔒
Upgrade to Professional
See your estimated win probability based on historical data.
Upgrade to Professional →
Buyer IntelligencePRO
🔒
Unlock Buyer Intelligence
See spending patterns, preferred procedures, and more.
Upgrade to Professional →
Sector InsightsPRO
🔒
Unlock Sector Insights
See average winning prices, competition levels, and market trends.
Upgrade to Professional →
Budget
€5,500,000
Duration
Not specified
Location
Estonia
Type
Construction
75
Quality Score/100
Good
Market Benchmark
Avg. Winning Price
€524,963
Avg. Bids
4.7
Competition
Medium
SME Winners
94%
5,932 tenders analyzed

Original Tender Description

The aim of the procurement is to construct the Kolde avenue rainwater sewage collector in stage C, construct the Sõle street rainwater sewage collector, build water supply, sewage, and rainwater sewage pipelines on Auna street, reconstruct sewerage pipelines at Kolde avenue 78, 80, and 84, and reconstruct internal block VK pipelines.
Green ProcurementEU FundedElectronic Submission

Risk Analysis

Please log in to use risk analysis.

Login

Win Strategy

Please log in to access winning strategy recommendations.

Login

Competitors

Upgrade to see which companies are likely to bid on this tender, based on historical procurement data.

Login

Requirements & Qualifications

20 requirements across 5 categories

Submission (7)
Mandatory (4)
Compliance (4)
Technical (4)
Financial (1)
SUBMISSION REQUIREMENTS7
--Bidders must electronically fill out the ESPD.
--Subcontractors must provide a confirmation that they do not have exclusion grounds (Alltöövõtja kinnitus.docx).
--If relying on another entity's resources, submit the "Consent of another entity to rely on its resources" form (Teise ettevõtja nõusolek tema vahenditele tuginemiseks.docx).
MANDATORY EXCLUSION GROUNDS4
--Bidders must not have any exclusion grounds as described in the ESPD.
--First-tier subcontractors must not have any exclusion grounds (e.g., criminal penalties, trustworthiness issues) as described in the subcontractor control conditions.
--Subcontractors must confirm the absence of exclusion grounds as per RHS § 95 lg 1 p-d 1-5.
ELIGIBILITY REQUIREMENTS4
--Bidders must meet the qualification conditions described in the ESPD.
--First-tier subcontractors must meet the qualification conditions described in the subcontractor control conditions.
--If relying on another entity's resources (economic, financial, technical, and professional capacity), a consent form from that entity must be provided, confirming their responsibility for contract execution.
TECHNICAL CAPABILITY REQUIREMENTS4
--Bidders must be capable of performing water and sewage pipeline reconstruction and stormwater pipeline construction works as per the technical description.
--Bidders must adhere to specific implementation conditions, including traffic management requirements, as outlined in the technical description.
--Bidders must comply with AS Tallinna Vesi's occupational health, safety, and environmental requirements for repair and construction sites.
FINANCIAL REQUIREMENTS1
--Bidders must submit a tender cost form detailing work volumes and cost breakdown.

Requirements Preview

Sign up to view complete requirements and analysis

Documents

13 documents available with AI summaries

Alltöövõtjate kontrollimise tingimused lepingu täitmise etapisPDF
305753_alltoovotjate_kontrollimise_tingimused... -- 20.8 KB

This document specifies the qualification and exclusion criteria for first-tier subcontractors, focusing on criminal convictions and trustworthiness.

VastavustingimusedPDF
305753_vastavustingimused.pdf -- 9.4 KB

This document outlines mandatory compliance conditions for bidders and their subcontractors, covering EU sanctions, power of attorney for joint bids, and grounds for subcontractor exclusion.

Pakkumuse maksumusXLS
Lisa 2 Pakkumuse maksumus.xlsx -- 62.0 KB

This document is a tender cost form, containing a list of work volumes and cost breakdowns that bidders must complete for the water and sewage pipeline reconstruction and stormwater pipeline construction project.

Hindamiskriteeriumid ja hinnatavad näitajadPDF
305753_hindamiskriteeriumid.pdf -- 2.9 KB

Tender document 'Hindamiskriteeriumid ja hinnatavad näitajad' in .PDF format (2,949 bytes).

Hankepass täiendatavate selgitustegaPDF
305753_hankepass_taiendavate_selgitustega.pdf -- 40.4 KB

This document is an explanatory European Single Procurement Document (ESPD) detailing the contracting authority's qualification conditions and exclusion grounds that bidders must complete electronically.

Alltöövõtja kinnitusDOC
Alltöövõtja kinnitus.docx -- 17.5 KB

This document is a subcontractor's confirmation that they do not have any grounds for exclusion from the public procurement procedure as stipulated in Section 95 (1) points 1-5 of the Public Procurement Act.

Lisa 1 Tehniline kirjeldusDOC
Lisa 1Tehniline kirjeldus.docx -- 2.3 MB

This technical description outlines the objective, scope, and execution conditions, including traffic management requirements, for the reconstruction of water and sewage pipelines and the construction of stormwater pipelines in Sõle street, Kolde avenue, and Auna street.

Lisa 3 Töötervishoiu-, -ohutuse- ja keskkonnanõudedPDF
Lisa 3 Töötervishoiu-, -ohutuse- ja keskkonna... -- 515.5 KB

This document outlines AS Tallinna Vesi's occupational health, safety, and environmental requirements that contractors must adhere to on repair and construction sites, including submitting a risk analysis and work safety plan before commencing work.

Lisa 5 Leppetrahvi määramise akti vormDOC
Lisa 5 Leppetrahvi määramise akti vorm.docx -- 39.8 KB

This document is a template for a contractual penalty act, detailing various breaches and their corresponding penalty amounts to be applied to the contractor during the execution of the contract.

Lisad 4, 6 ja 7XLS
Lisad 4, 6 ja 7.xlsx -- 27.8 KB

Tender document 'Lisad 4, 6 ja 7' in .XLSX format (28,454 bytes).

Teise ettevõtja nõusolek tema vahenditele tuginemiseksDOC
Teise ettevõtja nõusolek tema vahenditele tug... -- 52.4 KB

This document is a third-party (e.g., subcontractor) consent form allowing the tenderer to rely on its economic, financial, technical, and professional capabilities to meet tender qualification requirements, while also confirming responsibility for contract execution.

Toruehituse töövõtulepingu vormDOC
Toruehituse töövõtulepingu vorm.docx -- 119.5 KB

This document is a draft contract for the reconstruction and construction of water, sewage, and stormwater pipelines in Sõle, Kolde, and Auna streets, outlining the terms, appendices, and general conditions for the awarded contractor.

Ühispakkujate volikiriDOC
Ühispakkujate volikiri.docx -- 62.6 KB

Tender document 'Ühispakkujate volikiri' in .DOCX format (64,128 bytes).

Documents Preview

Sign up to view document summaries and analysis

75
Good

Tender Quality Score

This tender is well-documented and structured, demonstrating good clarity and completeness. However, a significant contradiction regarding the classification of the estimated value severely impacts its fairness and data consistency.

Score Breakdown

Legal Compliance90/100

The tender appears to be legally compliant, featuring reasonable submission deadlines, appropriate CPV codes, and no detected disputes. The use of ESPD and EU funding suggests adherence to relevant regulations.

Clarity85/100

The project description is clear, and requirements are well-structured and referenced through specific documents. Evaluation criteria are indicated, and performance conditions refer to contract clauses, contributing to good clarity.

Completeness90/100

All essential information, including basic details, financial data, timeline, and location, is provided. A comprehensive set of 14 documents supports the tender, ensuring high completeness.

Fairness50/100

While e-procurement is enabled and requirements seem generic, the tender explicitly states 'Value Classified: Yes' despite providing an 'Estimated Value: 5,500,000.00 EUR'. This contradiction creates ambiguity and significantly undermines transparency and fairness.

Contradiction: Estimated Value disclosed but marked as 'Value Classified: Yes'.
Practicality75/100

Electronic submission is supported, and the contract start date is known. Financing information refers to contract clauses. However, the explicit contract duration is not stated in the basic information, which is a minor practical oversight.

Contract duration not explicitly stated in basic information.
Data Consistency50/100

Key fields are populated, and dates are logical. However, the direct contradiction between the disclosed estimated value and its classification status ('Value Classified: Yes') represents a significant data inconsistency.

Contradiction: Estimated Value disclosed but marked as 'Value Classified: Yes'.
Sustainability60/100

The tender is characterized as 'Green Procurement' and is 'EU Funded', which are positive aspects. However, it explicitly lacks social criteria and innovation focus, limiting its overall sustainability scope.

Lack of explicit social criteria.
Lack of explicit innovation focus.

Strengths

Comprehensive documentation and structured requirements.
Clear project description and well-defined scope.
Electronic submission and e-procurement enabled.
Includes Green Procurement aspects and is EU Funded.
Reasonable submission period for bidders.

Concerns

Significant contradiction: Estimated Value disclosed but marked as 'Value Classified: Yes'.
Contract duration not explicitly stated in the basic information.
Absence of explicit social criteria in the tender.
Lack of explicit innovation focus within the procurement.

Recommendations

1. Clarify the status of the estimated value to ensure full transparency and data consistency.
2. Explicitly state the contract duration in the basic information section for better bidder planning.
3. Integrate social and innovation criteria to enhance the overall sustainability profile of the procurement.

AI Scoring Preview

Sign up to view complete requirements and analysis

Complete quality score analysis
Detailed sub-score breakdown
Strengths & concerns insights
Strategic recommendations

No credit card required • Setup in 2 minutes

Add to Pipeline