Tenders

M2627-01 - Supply and Installation of New Boilers, Boiler Replacement and Up-grading of Existing Heating Systems and Associated Works

Closed
Deadline
0 days left
March 02, 2026
Contract Details
Category
Other
Reference
008792-2026
Value
Not disclosed
Location
Essex, United Kingdom
Published
February 23, 2026
Organization
CPV Code
Project Timeline

Tender Published

February 02, 2026

Deadline for Questions

February 23, 2026

Submission Deadline

March 02, 2026

Budget
Not disclosed
Duration
36 months
Location
Essex
Type
Other
46
Quality Score/100
Fair

Original Tender Description

Reactive and planned programme of works to install gas boilers and associate works within the City of Southend on Sea, Essex.

Risk Analysis

Please log in to use risk analysis.

Login

Win Strategy

Please log in to access winning strategy recommendations.

Login

Competitors

Upgrade to see which companies are likely to bid on this tender, based on historical procurement data.

Login

Requirements & Qualifications

18 requirements across 5 categories

Submission (5)
Mandatory (1)
Compliance (4)
Technical (7)
Financial (1)
SUBMISSION REQUIREMENTS5
--Submit a tender for the specified works.
--Access full procurement documents on the ProContract platform.
--Submit the tender by the deadline: 2026-03-02T12:00:00+00:00.
MANDATORY EXCLUSION GROUNDS1
--No specific mandatory exclusion grounds are mentioned in the provided documents.
ELIGIBILITY REQUIREMENTS4
--Be a contractor capable of performing reactive and planned works.
--Be capable of supplying, installing, replacing, and upgrading gas boilers and heating systems.
--Be capable of operating within the City of Southend on Sea, Essex.
TECHNICAL CAPABILITY REQUIREMENTS7
--Capability to perform reactive works on gas boilers and heating systems.
--Capability to perform planned programme of works on gas boilers and heating systems.
--Expertise in the supply of gas boilers and heating systems.
FINANCIAL REQUIREMENTS1
--No specific financial requirements are mentioned in the provided documents.

Requirements Preview

Sign up to view complete requirements and analysis

Documents

4 documents available with AI summaries

OCDS RecordDOC
008792-2026_ocds_record.json

Southend City Council is seeking contractors for reactive and planned gas boiler installation, replacement, and associated heating system upgrades within Southend on Sea, Essex.

OCDS Release PackageDOC
008792-2026_ocds_release.json

This document describes a tender from Southend City Council for reactive and planned gas boiler installation and heating system upgrades in Southend on Sea, with a contract duration of 1080 days.

Official PDF VersionPDF
008792-2026_official.pdf

This document is a contract notice from Southend City Council inviting tenders for reactive and planned works involving the supply, installation, replacement, and upgrading of gas boilers and associated heating systems within the City of Southend on Sea, Essex.

Tender NoticeHTM
008792-2026.html

Southend City Council is inviting tenders for the supply, installation, replacement, and upgrading of gas boilers and heating systems, with full procurement documents available on the ProContract platform.

Documents Preview

Sign up to view document summaries and analysis

46
Fair

Tender Quality Score

This tender from Southend City Council outlines a clear scope of work but suffers from critical omissions regarding financial requirements, evaluation criteria, and estimated value, significantly impacting fairness and transparency.

Score Breakdown

Legal Compliance40/100

The tender lacks specified mandatory exclusion grounds and, critically, evaluation criteria, which are fundamental requirements for legal compliance in public procurement. While the procedure type and CPV code are appropriate, these omissions represent significant legal deficiencies.

No specific mandatory exclusion grounds mentioned
No evaluation criteria specified
Clarity55/100

The description of the works is clear, and technical requirements are outlined. However, the absence of financial requirements and, most importantly, evaluation criteria severely diminishes the overall clarity for potential bidders on how their submissions will be assessed.

No evaluation criteria specified
No specific financial requirements mentioned
Completeness50/100

While basic information, deadlines, and duration are present, the tender is significantly incomplete due to the undisclosed estimated value, the explicit absence of financial requirements for bidders, and the critical lack of defined evaluation criteria.

Estimated value not disclosed
No evaluation criteria specified
Fairness35/100

The undisclosed estimated value and the complete absence of evaluation criteria fundamentally undermine the fairness and transparency of this procurement process. Bidders cannot objectively prepare offers or understand the basis of award, creating a risk of arbitrary decisions. The contradiction regarding e-submission also raises concerns.

No evaluation criteria specified
Estimated value not disclosed
Practicality50/100

The practicality for bidders is hampered by the contradiction between the 'E-Procurement' characteristic and the 'No e-submission' flag. Additionally, the lack of a direct document URL and the undisclosed estimated value make it less practical for bidders to quickly access full details and assess the project's scale.

Contradiction regarding e-submission support
No direct document URL provided
Data Consistency65/100

The primary inconsistency lies in the 'E-Procurement' characteristic being listed while automated checks flag 'No e-submission'. While most key fields are populated and dates are logical, the missing 'Liable Person' and undisclosed value are minor gaps.

Contradiction between 'E-Procurement' characteristic and 'No e-submission' flag
Sustainability25/100

The tender makes no explicit mention of green procurement, social aspects, or innovation focus, indicating a complete absence of sustainability considerations within the tender documentation.

No green procurement criteria
No social criteria

Strengths

Clear description of the scope of works
Standard open procedure type
Documents are available on a platform (ProContract)
Reasonable submission period (28 days from today's date)
CPV code is appropriately assigned

Concerns

Absence of evaluation criteria
Undisclosed estimated contract value
No specified mandatory exclusion grounds
Lack of specific financial requirements for bidders
Contradiction regarding e-submission capabilities

Recommendations

1. Clearly define and publish comprehensive evaluation criteria to ensure transparency and fairness.
2. Disclose the estimated contract value to allow bidders to properly assess the opportunity.
3. Specify mandatory exclusion grounds and detailed financial requirements for bidders.

AI Scoring Preview

Sign up to view complete requirements and analysis

Complete quality score analysis
Detailed sub-score breakdown
Strengths & concerns insights
Strategic recommendations

No credit card required • Setup in 2 minutes

Add to Pipeline