Halton Borough Council is seeking EPC (Engineer Procure and Construct) proposals for a smart microgrid project encompassing a 3.62MWp solar farm, battery storage, EV charging, and extensive 11kV/33kV infrastructure, including a minimum two-year warranty and O&M services.
Halton Borough Council seeks EPC proposals for a Smart Microgrid Project, including a 3.62MWp solar farm, 2MW/4MWh battery storage, EV charging infrastructure, and an 11kV ring main to power council facilities, with a minimum two-year warranty and O&M.
Halton Borough Council seeks an EPC contractor for a turn-key smart microgrid project, including a 3.62MWp solar farm, battery storage, EV charging, and associated 11kV infrastructure to power council facilities.
Halton Borough Council seeks EPC proposals for the design, installation, and commissioning of a Smart Microgrid Project, including a 3.62MWp solar farm, battery storage, EV charging infrastructure, and associated electrical works, plus two years of operations and maintenance.
Sign up to view document summaries and analysis
This tender outlines a significant and environmentally beneficial smart microgrid project with a clear technical scope, but it suffers from critical omissions regarding evaluation criteria and explicit financial requirements, impacting clarity and fairness.
The tender appears generally compliant with procurement regulations, providing essential information and a clear CPV code. However, the absence of explicit mandatory exclusion grounds in the provided text and missing procedure codes are minor deficiencies. The missing reveal date also affects transparency.
The project's background, scope, and technical requirements are exceptionally well-detailed and unambiguous, providing a clear understanding of the work involved. However, the complete absence of specified evaluation criteria is a significant drawback, making it difficult for bidders to formulate competitive proposals.
Basic tender information, financial value, duration, and location are adequately provided. The technical requirements are comprehensive. Nevertheless, the tender lacks explicit evaluation criteria and detailed financial requirements, and one of the listed documents failed to download, indicating potential gaps in accessible information.
The tender's fairness is significantly compromised by the complete absence of evaluation criteria, which undermines transparency and objectivity in the selection process. The lack of electronic submission also creates barriers to equal access. While requirements are not tailored, the 33-day submission period for a complex €15.6M EPC project is relatively tight.
The absence of electronic submission is a major practical impediment in modern procurement, potentially increasing administrative burden for bidders. The failed download of one document also presents a practical challenge. However, the contract start date and duration are clearly specified.
The tender exhibits good data consistency with logical dates and no reported disputes. Minor inconsistencies include missing codes for the procedure type and liable person, and a contradictory "Value Classified: Yes" despite the value being disclosed.
The project is inherently strong in sustainability, focusing on renewable energy (solar), energy storage, and electric vehicle infrastructure, directly addressing climate emergency goals. It also incorporates innovative elements like a smart microgrid and SCADA system. However, there is no explicit mention of social criteria.
Sign up to view complete requirements and analysis
No credit card required • Setup in 2 minutes
Hello! I'm your AI assistant for this tender. I can help you understand requirements, deadlines, eligibility criteria, and provide strategic insights.
No credit card required