Brauchen Sie Hilfe von Ausschreibungsexperten? Sehen Sie unseren Service zur Angebotserstellung
Ausschreibungen

ISO11 Begasungslobby-Ersatzprojekt – Tiefbauarbeiten und Rolle des Hauptplaners/Hauptauftragnehmers nach CDM

Offen
Frist
2 Tage verbleibend
30. September 2026
Vertragsdetails
Kategorie
Open Procedure
Referenz
089575-2026
Wert
£185,000
Standort
Surrey, East and West Sussex, Vereinigtes Königreich
Veröffentlicht
21. September 2026
CPV-Code
Zeitplan des Projekts

Ausschreibung veröffentlicht

22. September 2026

Frist für Fragen

23. September 2026

Angebotsfrist

30. September 2026

Vertragsbeginn

6. November 2026

BieterinformationenPRO
🔒
Bieterinformationen freischalten
Sehen Sie Ausgabenmuster, bevorzugte Verfahren und mehr.
Upgrade auf Professional →
Budget
£185,000
Dauer
11 Monate
Standort
Surrey, East and West Sussex
Typ
Open Procedure

Ursprüngliche Ausschreibungsbeschreibung

This opportunity (“Contract”) is for a single supplier to provide: 1. Civil Works and CDM Principal Designer/Principal Contractor Role for the ISO11 Fumigation Lobby Replacement Project. 2. Conversion of Structural Engineer’s drawings to Construction Drawings. 3. Liaison with Local Authority to ensure compliance with Building Control. This will include providing drawings and information as required by the Local Authority and hosting them during site visits. Fees for Building Control will be paid for by The Pirbright Institute. 4. Construction of a Temporary Biocontainment Wall which will allow the area to be externalised from ISO11 to enable construction works to take place. The wall shall provide a bioseal between the working area and the contained area. Suppliers must allow for works carried out close to this wall to be carried out with care and attention to prevent damage to the wall. 5. Strip out of existing fumigation chamber and autoclave. 6. Remove door between G48 & G44 (ISO8), brick up and render. 7. Remove the external door in G62, brick up and render. 8. Create opening into G49/G62 area after temporary containment barrier is in place. 9. Create new loading area in G49 / G62 area. This will include making good the floors, walls and ceiling to the same standards as ISO11 to maintain sealability. Remove and make good any raised door threshold so that there is smooth access to the fumigation lobby for pallet trucks. 10. Create space for new Fumigation Lobby and construct flooring inside Fumigation chamber to match with the flooring in ISO11 and ensure the threshold in and out of the fumigation lobby is flush to the floor so pallet trucks can access without any obstacles. 11. Remove current double doors in G51, brick up and render. 12. Create new opening to G51 and supply/install new double doors with SR4 security rating. 13. Create new unloading area in G51 with double door entry from the external hard standing (currently underneath the staircase). Walls and ceilings to be rendered and painted with wipeable paint for hygienic areas. Floor to be constructed to same standard as internal flooring to match that of the fumigation chamber to ensure unobstructed access to pallet trucks. 14. Remove and replace external staircase to allow forklift truck access to room G51 and maintain access to the first-floor plantroom. 15. Replace double doors to first floor plantroom and decorate. 16. The supplier is to make allowance to liaise with the fumigation lobby supplier to ensure they have the details to integrate the new fumigation lobby into the refurbished area. 17. The supplier shall allow for covered skip for metal and construction waste to be stored on site for 6 months quarantine before disposing off site. 18. The Pirbright Institute would also like to obtain an option cost to refurbish room G44, so that it can become part of ISO11. The supplier is to allow for upgrade the flooring to the same standard as ISO11 so that there is unobstructed access between G44 & G48 areas, walls and ceiling to be refurbished to ensure they maintain sealability. The works in 6 will apply to the door in G44 between G40 and G47 if this option is ordered. 19. The supplier is to provide CDM Principal Designer and Principal Contractor Role for the entire project. Details of this are shown in ITT Part 1 - Appendix 1 - Civil & CDM Scope of Works. 20. On completion, an O&M is to be submitted which provides details of works from design to completion. This shall include as built drawings and Building Control Completion Certificates.

Risikoanalyse

Die Risikoanalyse ist für Ausschreibungen in diesem Land noch nicht verfügbar. Aktuell unterstützt: Estland, Lettland, Litauen, Polen, Frankreich, Großbritannien, Dänemark, Niederlande, Norwegen und Finnland.

Erfolgsstrategie

Erhalten Sie eine KI-gestützte Gewinnstrategie, die auf diese Ausschreibung zugeschnitten ist. Beinhaltet Gewinnwahrscheinlichkeits-Score, wichtige Chancen und Herausforderungen, empfohlene Schwerpunkte für Angebote, Einblicke in die Wettbewerbspositionierung und umsetzbare Empfehlungen zur Maximierung Ihrer Chancen.

Anmelden

Wettbewerber

Upgrade, um zu sehen, welche Unternehmen wahrscheinlich auf diese Ausschreibung bieten werden, basierend auf historischen Beschaffungsdaten.

Anmelden

Anforderungen & Qualifikationen

KI extrahiert und organisiert alle Anforderungen aus den Ausschreibungsunterlagen – obligatorische Qualifikationen, technische Spezifikationen, finanzielle Bedingungen und Einreichungsregeln – klar kategorisiert, damit Sie genau wissen, was für ein Angebot erforderlich ist.

Anmelden

Grundlegende Anforderungen

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokumente

3 Dokumente mit KI-Zusammenfassungen verfügbar

OCDS RecordDOC
089575-2026_ocds_record.json

Keine Zusammenfassung für dieses Dokument verfügbar.

OCDS Release PackageDOC
089575-2026_ocds_release.json

Keine Zusammenfassung für dieses Dokument verfügbar.

Official PDF VersionPDF
089575-2026_official.pdf

Keine Zusammenfassung für dieses Dokument verfügbar.

Vorschau der Dokumente

Registrieren Sie sich, um Dokumentenzusammenfassungen und Analysen anzuzeigen

Qualitätsbewertung

Umfassende Qualitätsanalyse dieser Ausschreibung, die rechtliche Konformität, Klarheit, Vollständigkeit, Fairness, Praktikabilität, Datenkonsistenz und Nachhaltigkeit auf einer Skala von 0-100 mit detaillierter Aufschlüsselung und Empfehlungen bewertet.

Anmelden