Brauchen Sie Hilfe von Ausschreibungsexperten? Sehen Sie unseren Service zur Angebotserstellung
Ausschreibungen

Austausch des Heizkessels für den Stadtrat von Aylsham

Offen
Frist
4 Tage verbleibend
30. September 2026
Vertragsdetails
Kategorie
Open Procedure
Referenz
083362-2026
Wert
£50,000
Standort
East Anglia, Vereinigtes Königreich
Veröffentlicht
18. September 2026
Organisation
CPV-Code
Zeitplan des Projekts

Ausschreibung veröffentlicht

3. September 2026

Frist für Fragen

23. September 2026

Angebotsfrist

30. September 2026

Vertragsbeginn

1. November 2026

BieterinformationenPRO
🔒
Bieterinformationen freischalten
Sehen Sie Ausgabenmuster, bevorzugte Verfahren und mehr.
Upgrade auf Professional →
Budget
£50,000
Dauer
2 Monate
Standort
East Anglia
Typ
Open Procedure

Ursprüngliche Ausschreibungsbeschreibung

1) New Town Hall Main Boiler - LOCATION, AYLSHAM, NORFOLK, NR11 6EL • Supply and install new 2no. Commercial 48KW (total 96KW) high efficiency condensing boilers. Minimum 5 years manufacturer's guarantee • Boilers to be fitted in existing boiler room (cellar) at a suitable height to reduce risk from flooding. • Existing pipework to be re-routed to new boilers. • Supply and instal new flue liner in chimney stack. This may be subcontracted out but subcontractor will report to the successful contractor. • Flues to be connected to new flue liner. • Old boiler to be removed from site and disposed of. • New boilers to be plumbed in to new plate heat exchanger to split system up and keep existing system open vent, utilizing the existing header tank in loft. • New larger circulation pump fitted to serve original heating system. • System to be split into 2 zones. The first zone will be the original heating system and the second zone will consist of the Council Chamber and Archives room (first floor). • 2no. motorized valves. • New 35mm copper pipe work from boiler area installed to existing heating system. • System to be adapted to a sealed pressurized system with expansion vessel and filling loop. • System filter fitted to filter out debris in the heating system. • New 28mm copper gas pipe installed from gas meter to new boilers. • Boiler to be wired in to 3-amp fused spur. • Supply and fit HIVE smart heating controls to control 2 x zones for use with App. Provide instructions on app • Condense pipe from boiler plumbed into nearest drain. 2) Replace 2no. gas heaters with Fan assisted heaters • New fan assisted heater to be installed to replace gas heaters (2no.). One on the ground floor (Green Room) and one on the first floor (council chamber). • New pipe work from new boiler area fitted to new radiator locations. Pipe work to be surface mounted in copper but hidden, where possible underflooring. • Existing gas heaters to be removed and disposed of to make way for new radiators. • System will be flushed to comply with manufacture instructions, to remove sludge and debris, using a chemical cleaner. • System corrosion inhibitor will be introduced into the heating system. • Green room heater to be connected to Zone 1, council chamber to be connected to Zone 2. 3) Installation of 3no. Radiators • Installation of 2no. radiators in the archive room (zone 2). • Installation of 1no. radiator in the ground floor east toilet (zone 1). • Area to be connected with a 2 port valve and thermostat. • All necessary pipework supplied and fitted. 4) Other • Boiler will be commissioned and registered with Gas Safety Certificate • Warranty to be provided (with option of extension where available). • The Town Hall is a working building. All works to be programmed in in coordination with Town Council officers so that there is either minimal impact on hirers of the building, or the building can be closed for safety reasons. • Any damage to the fabric of the Town Hall should be made good • All waste materials to be cleared from site in accordance with the contractor's waste transfer licence. • The successful contractor will be expected to provide a risk assessment and method statement for the works, and provide evidence of Public Liability insurance. • A site visit is strongly recommended prior to pricing for works. This can be arranged through the Town Council's Maintenance Manager Gavin Watson (email gavin.watson@aylsham-tc.gov.uk or call 07585 600539)

Risikoanalyse

Die Risikoanalyse ist für Ausschreibungen in diesem Land noch nicht verfügbar. Aktuell unterstützt: Estland, Lettland, Litauen, Polen, Frankreich, Großbritannien, Dänemark, Niederlande, Norwegen und Finnland.

Erfolgsstrategie

Erhalten Sie eine KI-gestützte Gewinnstrategie, die auf diese Ausschreibung zugeschnitten ist. Beinhaltet Gewinnwahrscheinlichkeits-Score, wichtige Chancen und Herausforderungen, empfohlene Schwerpunkte für Angebote, Einblicke in die Wettbewerbspositionierung und umsetzbare Empfehlungen zur Maximierung Ihrer Chancen.

Anmelden

Wettbewerber

Upgrade, um zu sehen, welche Unternehmen wahrscheinlich auf diese Ausschreibung bieten werden, basierend auf historischen Beschaffungsdaten.

Anmelden

Anforderungen & Qualifikationen

KI extrahiert und organisiert alle Anforderungen aus den Ausschreibungsunterlagen – obligatorische Qualifikationen, technische Spezifikationen, finanzielle Bedingungen und Einreichungsregeln – klar kategorisiert, damit Sie genau wissen, was für ein Angebot erforderlich ist.

Anmelden

Grundlegende Anforderungen

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokumente

3 Dokumente mit KI-Zusammenfassungen verfügbar

OCDS RecordDOC
083362-2026_ocds_record.json

Keine Zusammenfassung für dieses Dokument verfügbar.

OCDS Release PackageDOC
083362-2026_ocds_release.json

Keine Zusammenfassung für dieses Dokument verfügbar.

Official PDF VersionPDF
083362-2026_official.pdf

Keine Zusammenfassung für dieses Dokument verfügbar.

Vorschau der Dokumente

Registrieren Sie sich, um Dokumentenzusammenfassungen und Analysen anzuzeigen

Qualitätsbewertung

Umfassende Qualitätsanalyse dieser Ausschreibung, die rechtliche Konformität, Klarheit, Vollständigkeit, Fairness, Praktikabilität, Datenkonsistenz und Nachhaltigkeit auf einer Skala von 0-100 mit detaillierter Aufschlüsselung und Empfehlungen bewertet.

Anmelden