Möchten Sie sich auf öffentliche Ausschreibungen bewerben? Sehen Sie sich unseren TaaS-Service zur Vorbereitung von Ausschreibungen
Ausschreibungen

Demolition & Structural Alterations

Offen
Frist
38 Tage verbleibend
August 27, 2026
Vertragsdetails
Kategorie
Open Procedure
Referenz
066471-2026
Wert
£7,254,744
Standort
London, Vereinigtes Königreich
Veröffentlicht
Juli 12, 2026
CPV-Code
Zeitplan des Projekts

Ausschreibung veröffentlicht

Juli 14, 2026

Frist für Fragen

August 20, 2026

Angebotsfrist

August 27, 2026

Vertragsbeginn

September 22, 2026

BieterinformationenPRO
🔒
Bieterinformationen freischalten
Sehen Sie Ausgabenmuster, bevorzugte Verfahren und mehr.
Upgrade auf Professional →
Budget
£7,254,744
Dauer
14 Monate
Standort
London
Typ
Open Procedure

Ursprüngliche Ausschreibungsbeschreibung

All structural interventions, modifications and demolition as detailed in Price & Myers, Witherford Watson Mann and Purcell design drawings; Demolition of Strand floor, facade, and other elements as specified by the design engineers; Survey and investigation works required to ensure design and methodology is completed in time within the restraints of the existing structure; Localised noise, dust and vibration monitoring; Clean and re-use of existing brickwork for new wall installs; Formation of new floors including padstones or steel bearing plates, steels, joisting and sheathing; Formation and infills to all pockets formed for new structure install, both for this package and other (i.e. Structural Steelwork), including padstones and steel bearing plates; All mass poured, pre-cast, or reinforced concrete works including the new stair core, stairs, underpinning, pads, ramps, slabs and upstands; All dry packing, grouting, and encasement to steel members, including those installed by Others; Attendance and return visits required for the above installs by Others; External Luxcrete repairs; CCTV and repairs of existing below ground drainage. CCTV of new drainage; Install of items free issued by others (e.g. cast-in plates by Structural Steelwork contractor); Where shown in package split, all new primary and secondary steelwork, connections, metal deck, intumescent coating, padstones, steel bearing plates and dry packing; Alterations to existing structure including formation of new risers and services penetrations, box frames and trimmer steels and timbers; 3rd party review and confirmation of any intumescent and fire stopping installs; Forming of all new lift pits including underpinning, reinforcement and waterproof concrete; Installation of all waterproofing, blinding, insulation and sump (including commissioning) requirements; Facade and party wall retention propping to facilitate demolition Works; Demolition of existing stairwell in the East Wing including all associated temporary works, and infill of new landing; All blockwork and brick walls as shown in package split including windposts; Form new openings including lintels, beams, posts; Re-levelling of existing floor substrates; Removal and excavation of existing screed and slabs, including localised repaires where required; Covering or edge protection install to all voids and openings formed by the Works; Installation of riser flooring systems to all newly formed and existing riser opening; Strengthening of existing beams, including services opening coordination and formation; Removal or containment of any asbestos (e.g. Strand buildings timber flooring), lead, guano and anthrax where required to complete the Works, with appropriate measures in place; Removal, protection and off-site storage of heritage items such as stone beams and flags, grilles, fireplaces and hearths; Removal of existing heritage windows following surveys by Others; Installation of tower crane base including piles and cap; Fire and corrosion protection to steel in-situ application (new only); Temporary & permanent steel bracing; Protection of all existing heritage finishes (where at risk of damage from the works); All scaffolding and crash decks to facilitate the works (e.g. Strand south facade elevation); Propping of existing vaults at Strand; Underslab drainage works and GRP sumps; Surveys of existing structure, looking ahead on programme to avoid last minute discoverables; Install of gulleys, manhole covers and associated below-ground drainage components;

Risikoanalyse

Die Risikoanalyse ist für Ausschreibungen in diesem Land noch nicht verfügbar. Aktuell unterstützt: Estland, Lettland, Litauen, Polen, Frankreich, Großbritannien, Dänemark, Niederlande, Norwegen und Finnland.

Erfolgsstrategie

Erhalten Sie eine KI-gestützte Gewinnstrategie, die auf diese Ausschreibung zugeschnitten ist. Beinhaltet Gewinnwahrscheinlichkeits-Score, wichtige Chancen und Herausforderungen, empfohlene Schwerpunkte für Angebote, Einblicke in die Wettbewerbspositionierung und umsetzbare Empfehlungen zur Maximierung Ihrer Chancen.

Anmelden

Wettbewerber

Upgrade, um zu sehen, welche Unternehmen wahrscheinlich auf diese Ausschreibung bieten werden, basierend auf historischen Beschaffungsdaten.

Anmelden

Anforderungen & Qualifikationen

KI extrahiert und organisiert alle Anforderungen aus den Ausschreibungsunterlagen – obligatorische Qualifikationen, technische Spezifikationen, finanzielle Bedingungen und Einreichungsregeln – klar kategorisiert, damit Sie genau wissen, was für ein Angebot erforderlich ist.

Anmelden

Grundlegende Anforderungen

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokumente

3 Dokumente mit KI-Zusammenfassungen verfügbar

OCDS RecordDOC
066471-2026_ocds_record.json

Keine Zusammenfassung für dieses Dokument verfügbar.

OCDS Release PackageDOC
066471-2026_ocds_release.json

Keine Zusammenfassung für dieses Dokument verfügbar.

Official PDF VersionPDF
066471-2026_official.pdf

Keine Zusammenfassung für dieses Dokument verfügbar.

Vorschau der Dokumente

Registrieren Sie sich, um Dokumentenzusammenfassungen und Analysen anzuzeigen

Qualitätsbewertung

Umfassende Qualitätsanalyse dieser Ausschreibung, die rechtliche Konformität, Klarheit, Vollständigkeit, Fairness, Praktikabilität, Datenkonsistenz und Nachhaltigkeit auf einer Skala von 0-100 mit detaillierter Aufschlüsselung und Empfehlungen bewertet.

Anmelden

Zur Pipeline hinzufügen