Electricity supply for Miku property, Saunja village, Lääne-Nigula municipality, Lääne county (JT3263)

Zatvoreno

Rok za podnošenje ponuda je istekao

Rok za podnošenje ponuda za ovaj tender je istekao i više se ne primaju prijave. Informacije ispod su zadržane radi referenciranja.

Pregledaj aktivne tendere
Rok
Isteklo
Mart 10, 2026
Detalji ugovora
Kategorija
Građevinarstvo
Referenca
306827
Vrednost
€9,400
Lokacija
Estonia, Estonija
Objavljeno
Februar 27, 2026
Organizacija
CPV šifra
Kriterijumi za ocenu
Total bid cost100%
Vremenski okvir projekta

Objavljen tender

Februar 27, 2026

Rok za pitanja

Mart 03, 2026

Rok za podnošenje ponuda

Mart 10, 2026

Otvaranje ponuda

Mart 10, 2026

Datum početka ugovora

Mart 13, 2026

Verovatnoća pobedePRO
🔒
Nadogradite na Professional
Pogledajte svoju procenjenu verovatnoću pobede na osnovu istorijskih podataka.
Nadogradite na Profesionalni paket →
Informacije o naručiocuPRO
🔒
Otključajte informacije o naručiocu
Pogledajte obrasce potrošnje, preferirane procedure i još mnogo toga.
Nadogradite na Profesionalni paket →
Uvid u sektorPRO
🔒
Otključajte uvide u sektor
Pogledajte prosečne pobedničke cene, nivoe konkurencije i tržišne trendove.
Nadogradite na Profesionalni paket →
Budžet
€9,400
Trajanje
Nije navedeno
Lokacija
Estonia
Tip
Građevinarstvo
75
Rezultat kvaliteta/100
Dobro
Uporedna analiza tržišta
Prosečna pobednička cena
€524,963
Prosečan broj ponuda
4.7
Konkurencija
Srednja
Pobednici iz redova MSP
94%
5,932 analiziranih tendera

Originalni opis tendera

Tender announced: Electricity supply for Miku property, Saunja village, Lääne-Nigula municipality, Lääne county (JT3263). Construct according to the project: Reconstruct 200 m of MP overhead line, 35 m of MP underground cable line and LK. The deadline for completion of works is 26.06.2026. Pay attention to the additional note in the table of work volumes! Substation (delivery April 2026), transformer, meters and concentrator will be procured by Elektrilevi OÜ, the remaining material by the bidder. Transport of the substation (delivery April 2026), transformer, meters and concentrator, and associated costs from the supplier's delivery partner to the site are included in the bidder's scope of work.
Finansirano od strane EUElektronsko podnošenje

Pokreni analizu rizika

Identifikujte potencijalne rizike, neusklađenosti i upozorenja u svim tenderskim dokumentima. Dobijte detaljan izveštaj o rizicima sa nivoima ozbiljnosti i preporukama za ublažavanje.

Prijavite se

Strategija za pobedu

AI analiza zahteva, prilika i izazova ovog tendera. Dobijte strateške uvide za povećanje verovatnoće pobede.

75%
Procenjena verovatnoća pobedeUmereno podudaranje

This tender focuses on electrical infrastructure reconstruction with a sole evaluation criterion of total cost. Winning requires a highly competitive price, demonstrated experience in similar projects, and meticulous attention to the provided project details and cost breakdown. Leveraging efficient project execution and accurate cost estimation will be paramount.

Ključne poruke za pobedu

Most Cost-Effective Solution for Essential Electrical Infrastructure Upgrade

Proven Expertise in Elektrilevi Projects with Guaranteed Compliance

Efficient and Timely Delivery of High-Quality Electrical Works

Ključne prilike
Sole evaluation criterion is cost, allowing for a direct competitive advantage through aggressive pricing.
The tender explicitly states that Elektrilevi OÜ will procure the substation, transformer, meters, and concentrator, simplifying the bidder's material procurement and focusing their efforts on installation and remaining materials.
The project is relatively small in scope (200m overhead, 35m underground), suggesting that efficient project management and execution can lead to cost savings.
Ključni izazovi
Intense price competition due to cost being the sole evaluation criterion.

Conduct thorough cost analysis, optimize material sourcing, and streamline labor deployment. Consider economies of scale if bidding on multiple similar projects. Accurately estimate all costs, including the transport of Elektrilevi-supplied components.

Ensuring all mandatory requirements, especially switching rights and Elektrilevi portal registration, are met without delay.

Proactively verify all team members' switching rights and ensure the designated work operations manager is registered in the Elektrilevi partner portal well in advance of the submission deadline. Double-check all mandatory exclusion grounds confirmations.

Accurately costing the transport and associated costs of the substation, transformer, meters, and concentrator, which are supplied by Elektrilevi but transported by the bidder.

Obtain detailed specifications and estimated weights/dimensions of the supplied components from Elektrilevi (if possible) or make reasonable assumptions based on similar equipment. Factor in potential logistical challenges at the site and obtain quotes from transport providers.

Profil idealnog ponuđača
A small to medium-sized electrical construction company with a proven track record in overhead and underground power line reconstruction, possessing the necessary switching rights and a registered representative in the Elektrilevi partner portal. They should have a strong understanding of cost optimization for materials and labor, and a history of successfully delivering projects within tight deadlines.
Ključni zahtevi
Total cost of the bid is the sole evaluation criterion.
Evidence of at least three similar electrical construction work contracts in the last 60 months, with one contract worth at least 40,000 EUR.
The bidder's team must possess the necessary switching rights.
The person responsible for work operations must be registered in the Elektrilevi partner portal.
Bidders must confirm they have not fallen under mandatory exclusion grounds.
Reconstruct 200 m MP overhead line, 35 m MP underground cable line, and LK.
Work completion deadline: 26.06.2026.
Transport and associated costs of substation (delivery April 2026), transformer, meters, and concentrator from supplier to site are part of the bidder's scope.
Ključni diskriminatori
A highly competitive and meticulously calculated price.
A clear demonstration of past successful projects with Elektrilevi or similar grid operators, highlighting efficiency and adherence to standards.
A streamlined and efficient project execution plan that minimizes downtime and maximizes productivity.
Prilike za društvenu vrednost
While not explicitly required, consider a commitment to local employment or training opportunities within the Lääne-Nigula vald area, if feasible and cost-neutral. This can be a subtle differentiator if other bidders do not address it.
Fokusne oblasti ponude
Total Cost100%

Develop a highly competitive and accurate cost proposal. Thoroughly review the 'Maksumuse tabel' and project scope to identify all cost drivers. Ensure all indirect costs, including the transport of Elektrilevi-supplied equipment, are fully accounted for. Seek competitive quotes for all materials and services not supplied by Elektrilevi.

Preporuke6
Aggressively Price for Cost Leadership
KritičnoVeliki napor

Given that cost is the sole evaluation criterion, develop a highly competitive bid price. This requires meticulous cost estimation, efficient material sourcing, and optimized labor allocation. Factor in all potential costs, including the transport of Elektrilevi-provided equipment.

Directly influences the win probability as it's the only evaluation factor.
Thoroughly Analyze Project Scope and Cost Table
KritičnoVeliki napor

Scrutinize the 'Maksumuse tabel' and the project description ('Tööprojekt') to ensure a comprehensive understanding of all work required. Pay close attention to the 'täiendavale märkusele' in the work volume table for any nuances. Accurately quantify all materials and labor needed.

Prevents underbidding due to overlooked costs and ensures a compliant and profitable bid.
Verify Switching Rights and Portal Registration
KritičnoSrednji napor

Ensure that all personnel involved in the switching operations possess the required switching rights. Confirm that the designated person responsible for work operations is registered in the Elektrilevi partner portal. This is a mandatory requirement and non-compliance will lead to disqualification.

Ensures eligibility and avoids immediate disqualification.
Highlight Experience with Similar Elektrilevi Projects
VisokoSrednji napor

When submitting evidence of past contracts, specifically emphasize projects that are similar in scope and complexity to this tender, particularly those undertaken for Elektrilevi or other Estonian grid operators. Detail the successful completion and adherence to deadlines.

Builds confidence in the bidder's capability and understanding of Elektrilevi's requirements.
Accurately Cost Transport of Supplied Equipment
VisokoSrednji napor

Carefully estimate the costs associated with transporting the substation, transformer, meters, and concentrator from the supplier to the site. This includes potential challenges like access, lifting equipment, and insurance. Obtain quotes from transport providers if necessary.

Prevents cost overruns and ensures profitability.
Review Tender Documents Thoroughly
SrednjeSrednji napor

Dedicate sufficient time to thoroughly review all provided tender documents, including 'Väikehanke alusdokumendid', 'Tööprojekt', and 'Maksumuse tabel'. Understand all technical specifications, timelines, and contractual obligations.

Ensures a compliant and well-informed bid.
Konkurentsko pozicioniranje
Position the bid as the most economically advantageous offer, backed by a strong track record of efficient project delivery and compliance with Elektrilevi's stringent requirements. Emphasize the bidder's ability to seamlessly integrate the transport of Elektrilevi-supplied components into their overall project plan.

Konkurenti

Nadogradite da biste videli koje kompanije će se verovatno nadmetati na ovom tenderu, na osnovu istorijskih podataka o javnim nabavkama.

Prijavite se

Zahtevi i kvalifikacije

9 zahteva u 5 kategorija

Predaja (3)
Obavezno (1)
Usklađenost (2)
Tehnički (2)
Finansijski (1)
SUBMISSION REQUIREMENTS3
--Submit the bid cost according to the specified form.
--Provide evidence of at least three similar electrical construction work contracts in the last 60 months.
--One of these contracts must be worth at least 40,000 EUR.
MANDATORY EXCLUSION GROUNDS1
--Bidders must confirm they have not fallen under mandatory exclusion grounds.
ELIGIBILITY REQUIREMENTS2
--Bidders must meet qualification conditions.
--Bidders must have properly fulfilled similar electrical construction work contracts in the last 60 months.
TECHNICAL CAPABILITY REQUIREMENTS2
--The bidder's team must possess the necessary switching rights.
--The person responsible for work operations must be registered in the Elektrilevi partner portal.
FINANCIAL REQUIREMENTS1
--The total cost of the bid is the sole evaluation criterion.

Pregled zahteva

Registrujte se da biste videli potpune zahteve i analizu

Dokumenti

4 dokumenata dostupno sa AI sažecima

VastavustingimusedPDF
306827_vastavustingimused.pdf -- 10.5 KB

Bidders must confirm that their team has the necessary switching rights and a person responsible for work operations is registered in the Elektrilevi partner portal, and submit the bid cost according to the specified form.

Varasemate hankelepingute informatsioonDOC
Varasemate hankelepingute informatsioon.docx -- 22.3 KB

Bidders must provide proof of at least three similar electrical construction contracts completed in the last 60 months, with one contract valued at a minimum of 40,000 euros.

Hindamiskriteeriumid ja hinnatavad näitajadPDF
306827_hindamiskriteeriumid.pdf -- 2.9 KB

The contracting authority evaluates bids based on economic advantage, where the lowest price is the best, and the total bid cost is the sole evaluation criterion.

Kõrvaldamise alused ja kvalifitseerimistingimusedPDF
306827_korvaldamise_alused_ja_kvalifitseerimi... -- 7.1 KB

Bidders must confirm they do not fall under mandatory exclusion grounds and meet qualification criteria, including having at least three properly executed similar electrical construction contracts in the last 60 months.

Pregled dokumenata

Registrujte se da biste videli sažetke i analizu dokumenata

75
Dobro

Rezultat kvaliteta tendera

This tender for electrical supply in Lääne maakond is generally well-structured with clear requirements and a straightforward evaluation criterion. However, it lacks specific details on sustainability and some practical aspects of submission could be improved.

Pregled rezultata

Zakonska usklađenost75/100

The tender adheres to standard procurement procedures, including a clear CPV code and a reasonable timeline. The financing conditions are detailed, though the payment terms are standard for the contract value. No disputes are noted. The procedure type (VO) is standard for this value range.

Jasnoća80/100

The description of the work is clear, outlining the specific reconstruction tasks and materials to be supplied by each party. Requirements for exclusion grounds, eligibility, and technical capability are documented. The evaluation criterion is explicitly stated as the total bid cost.

Potpunost70/100

Most basic information is present, including title, reference, organization, estimated value, and contract start date. However, the tender documents are not all fully accessible or analyzable by AI (e.g., .zip, .xls files), which might hinder a complete assessment of all attached information. The duration of the contract is implied by the work completion deadline but not explicitly stated as a contract duration.

Some tender documents are not fully accessible or analyzable by AI.
Pravičnost85/100

The tender is conducted via e-procurement, and the estimated value is disclosed. The evaluation criterion (lowest price) is objective. While the requirement for similar past contracts is standard, the specific value threshold for one contract (40,000 EUR) is a common practice to ensure capability. No overtly tailored requirements to specific companies were detected.

Praktičnost65/100

E-submission is available. The contract start date is specified. Financing conditions are detailed, including payment terms and the option of factoring. However, the URL for management system documents is a bit complex to navigate, and the specific duration of the contract beyond the work completion date is not explicitly stated.

URL for management system documents could be more direct.
Konzistentnost podataka90/100

Key fields such as title, reference, organization, value, and dates are populated. There are no noted suspensions or disputes. The dates provided (Reveal Date, Submission Deadline, Opening Date, Contract Start) are logically sequenced.

Održivost50/100

The tender mentions 'EU Funded' but lacks specific criteria related to green procurement, social aspects, or innovation. This is a missed opportunity to encourage sustainable practices.

No specific green procurement or social criteria are included.

Prednosti

Clear and specific technical requirements.
Objective evaluation criterion (lowest price).
Well-defined financial and payment terms.
E-procurement enabled.

Nedostaci

Limited information on sustainability aspects.
Some tender documents not fully AI-analyzable.
Contract duration beyond work completion not explicitly stated.

Preporuke

1. Incorporate specific sustainability criteria (e.g., waste management, energy efficiency) into future tenders.
2. Ensure all tender documents are in easily analyzable formats.
3. Clearly state the overall contract duration, not just the work completion deadline.

Pregled AI ocene

Registrujte se da biste videli potpune zahteve i analizu

Potpuna analiza ocene kvaliteta
Detaljan pregled pod-ocena
Uvidi u prednosti i zabrinutosti
Strateške preporuke

Nije potrebna kreditna kartica • Podešavanje za 2 minuta

Nova usluga

Želite da prepustite nama ovaj tender?

Naši stručnjaci za javne nabavke pripremaju sve. Dokazano efikasno — Vi pregledate, odobrite i predate.

~1hVaše vreme
80%+80%+
$0Unapred
Pogledajte punu uporednu analizu
Bez TaaS-aSa TaaS-om
40-80 sati
Vreme pripreme
~1 sat
Vaše vreme
15-25%
Prosečan procenat uspešnosti
80%+
Procenat uspešnosti
Rizik od grešaka
Ručna provera
Stručna kontrola kvaliteta
Provera usaglašenosti
Sve radite Vi
Kompletna obrada
Sve radimo mi
Kompletna usluga
Dobijmo ovaj tender
Platite samo kada pobedite · Preko 400 kompanija nam veruje
Ili uradite sami

Dodaj u plan