Skip to main content
Želite da licitirate na javnim nabavkama? Pogledajte našu uslugu pripreme tendera TaaS
Tenderi

Rekonstrukcija igrališta Jugapuu (Kesktee 65)

Otvoreno
Rok
ostalo 15 dana
April 20, 2026
Detalji ugovora
Kategorija
Građevinarstvo
Referenca
305820
Vrednost
€190,000
Lokacija
Estonia, Estonija
Objavljeno
Mart 24, 2026
CPV šifra
Kriterijumi za ocenu
Total bid price in euros (excluding VAT)100%
Vremenski okvir projekta

Objavljen tender

Mart 24, 2026

Rok za pitanja

April 13, 2026

Rok za podnošenje ponuda

April 20, 2026

Otvaranje ponuda

April 20, 2026

Verovatnoća pobedePRO
🔒
Nadogradite na Professional
Pogledajte svoju procenjenu verovatnoću pobede na osnovu istorijskih podataka.
Nadogradite na Profesionalni paket →
Uvid u sektorPRO
🔒
Otključajte uvide u sektor
Pogledajte prosečne pobedničke cene, nivoe konkurencije i tržišne trendove.
Nadogradite na Profesionalni paket →
Budžet
€190,000
Trajanje
9 meseci
Lokacija
Estonia
Tip
Građevinarstvo
75
Rezultat kvaliteta/100
Dobro
Uporedna analiza tržišta
Prosečna pobednička cena
€524,963
Prosečan broj ponuda
4.7
Konkurencija
Srednja
Pobednici iz redova MSP
94%
5,932 analiziranih tendera

Originalni opis tendera

Svrha nabavke je zaključivanje ugovora o javnoj nabavci za izgradnju igrališta Kesktee 65. Detaljniji uslovi nalaze se u osnovnim dokumentima nabavke.
Elektronsko podnošenje

Pokreni analizu rizika

Identifikujte potencijalne rizike, neusklađenosti i upozorenja u svim tenderskim dokumentima. Dobijte detaljan izveštaj o rizicima sa nivoima ozbiljnosti i preporukama za ublažavanje.

Prijavite se

Strategija za pobedu

AI analiza zahteva, prilika i izazova ovog tendera. Dobijte strateške uvide za povećanje verovatnoće pobede.

65%
Procenjena verovatnoća pobedeUmereno podudaranje

This tender for the Jugapuu playground reconstruction is a price-driven opportunity with a strong emphasis on BIM compliance. A winning strategy will focus on aggressive cost management, meticulous adherence to BIM requirements, and demonstrating robust subcontractor vetting to mitigate exclusion risks.

Ključne poruke za pobedu

The most cost-effective and BIM-compliant solution for Jugapuu playground reconstruction.

Reliable execution through rigorously vetted partners and proven project management.

Ključne prilike
Leverage BIM expertise for efficient project planning and execution, potentially leading to cost savings.
Aggressively price the bid to secure the 100% weighting on cost.
Demonstrate proactive subcontractor management to avoid exclusion grounds.
Ključni izazovi
Intense price competition due to 100% cost weighting.

Conduct thorough cost analysis, optimize material sourcing, minimize overheads, and explore efficiencies in construction methods. Consider a slightly lower margin if confident in execution.

Ensuring complete and accurate BIM documentation and compliance.

Dedicate a BIM specialist to oversee the creation and submission of the BIM implementation plan and models. Conduct internal reviews to ensure all client requirements and templates are met.

Potential for subcontractor disqualification due to background checks.

Select subcontractors with a strong track record and transparent business practices. Request detailed documentation from them early in the process and conduct your own due diligence beyond the minimum requirements.

Profil idealnog ponuđača
A construction company with proven experience in public infrastructure projects, specifically playground or park renovations, possessing strong BIM capabilities and a well-established network of reliable subcontractors. They must have a lean operational structure to offer a highly competitive price.
Ključni zahtevi
Completed technical specification compliance table
Completed cost breakdown (Lisa 2 Kululoend) without alterations or conditions
BIM models and implementation plan according to provided technical conditions and requirements
Subcontractor background verification (fraud, money laundering, human trafficking)
List of models used and their formats, following BIM implementation plan
Ključni diskriminatori
A highly optimized and lean cost structure that allows for a significantly lower bid price while maintaining quality.
A demonstrably superior BIM implementation plan that showcases advanced capabilities and efficiency gains.
A proactive and transparent approach to subcontractor vetting, providing more assurance than competitors.
Prilike za društvenu vrednost
While not explicitly required, consider a commitment to local employment or training opportunities within the project execution phase. This can be a subtle differentiator if other bidders do not address it.
Fokusne oblasti ponude
Total bid price in euros (excluding VAT)100.0%

Achieve the lowest possible bid price through meticulous cost breakdown, efficient resource allocation, and optimized construction methodologies. Every euro saved directly translates to maximum evaluation points.

Preporuke7
Meticulously Complete Technical Specification Compliance Table
KritičnoVeliki napor

Ensure every item in the technical specification compliance table is accurately addressed, with clear 'Yes' or 'No' answers and supporting evidence where required. Any ambiguity or omission can lead to disqualification.

Avoids mandatory disqualification and demonstrates thorough understanding of requirements.
Aggressively Price for 100% Cost Weighting
KritičnoVeliki napor

Conduct a granular cost analysis to identify all possible cost-saving opportunities. Benchmark against similar projects and consider a slightly reduced profit margin if confident in operational efficiency and volume.

Maximizes score for the sole evaluation criterion, significantly increasing win probability.
Develop a Robust and Compliant BIM Implementation Plan
KritičnoVeliki napor

Utilize the provided template (RHAD_Lisa 1.3) and ensure the plan details how BIM will be used throughout the project lifecycle, including model formats and coordination. Align this plan with the technical conditions and client requirements.

Meets a critical technical requirement and demonstrates capability, avoiding disqualification.
Proactive Subcontractor Due Diligence
KritičnoSrednji napor

Go beyond the stated requirements for subcontractor background checks. Request detailed documentation and references, and conduct your own risk assessment to ensure no subcontractor will trigger exclusion grounds.

Prevents disqualification due to subcontractor issues and ensures project continuity.
Ensure Unaltered Cost Breakdown Submission
VisokoMali napor

Submit the 'Lisa 2 Kululoend' exactly as required, without any conditions, notes, or alterations. Any deviation can lead to disqualification.

Avoids mandatory disqualification due to submission format errors.
Highlight BIM Efficiency Gains in Proposal Narrative
SrednjeSrednji napor

While not directly scored, subtly weave into the narrative how your BIM approach will lead to fewer errors, better coordination, and potentially faster completion, indirectly supporting the cost-effectiveness.

Adds perceived value beyond just price and technical compliance.
Consider Local Employment/Training Commitment
NiskoMali napor

If feasible, include a brief statement about utilizing local labor or offering training opportunities as part of the project execution. This can be a positive, albeit unscored, element.

Potential positive impression on the contracting authority.
Konkurentsko pozicioniranje
Position your bid as the most financially astute and technically sound choice, emphasizing your ability to deliver the project at the lowest cost while meeting all BIM and compliance mandates. Highlight the reliability of your subcontractor vetting process as a key risk-reduction factor.

Konkurenti

Nadogradite da biste videli koje kompanije će se verovatno nadmetati na ovom tenderu, na osnovu istorijskih podataka o javnim nabavkama.

Prijavite se

Zahtevi i kvalifikacije

14 zahteva u 5 kategorija

Predaja (5)
Obavezno (1)
Usklađenost (5)
Tehnički (2)
Finansijski (1)
SUBMISSION REQUIREMENTS5
--The tender is not divided into lots due to the technical complexity of contract execution and the need for cooperation and simultaneity of construction works for different lots.
--The tender pass is an initial confirmation of the entrepreneur's self-declaration, containing the conditions set by the contracting authority and the format of expected answers, but it is not filled out directly, but electronically.
--Bidders must submit the BIM implementation plan based on the provided template for the Jugapuu playground reconstruction project.
MANDATORY EXCLUSION GROUNDS1
--The contracting authority verifies subcontractors' backgrounds regarding fraud, money laundering, and human trafficking, requiring relevant explanations and evidence.
ELIGIBILITY REQUIREMENTS5
--Bidders must confirm compliance with all tender document conditions.
--Bidders must submit a completed technical specification compliance table as an Excel file.
--Bidders must submit a completed cost breakdown (Lisa 2 Kululoend) without alterations or conditions.
TECHNICAL CAPABILITY REQUIREMENTS2
--Bidders are required to prepare BIM models and submit an implementation plan according to the provided technical conditions and requirements.
--Bidders must submit a form listing all subcontractors to be used in the contract execution, including their data and the scope of subcontracting.
FINANCIAL REQUIREMENTS1
--The total cost of the bid is the sole evaluation method with a 100% weighting.

Pregled zahteva

Registrujte se da biste videli potpune zahteve i analizu

Dokumenti

14 dokumenata dostupno sa AI sažecima

Alltöövõtjate kontrollimise tingimused lepingu täitmise etapisPDF
305820_alltoovotjate_kontrollimise_tingimused... -- 20.7 KB

The contracting authority will verify subcontractors' backgrounds for fraud, money laundering, and human trafficking, requiring relevant explanations and evidence.

VastavustingimusedPDF
305820_vastavustingimused.pdf -- 13.6 KB

Bidders must confirm adherence to all tender document conditions and submit a completed technical specification compliance table in Excel format.

Pakkuja esitab täielikult täidetud Lisa 5. Tehnilisele kirjeldusele vastavuse ta...XLS
Lisa 5 Tehnilisele kirjeldusele vastavuse tab... -- 1.4 MB

The bidder must submit a completed table demonstrating that their offered products and materials comply with the requirements specified in the technical description.

Kas pakkuja kinnitab, et lisa 2. kululoendis on täidetud nõuetekohaselt iga rida...XLS
RHAD_Lisa 2 Kululoend.xlsx -- 27.3 KB

The bidder must confirm that Appendix 2 cost list is filled out correctly without modifications or conditions.

Hindamiskriteeriumid ja hinnatavad näitajadPDF
305820_hindamiskriteeriumid.pdf -- 3.2 KB

This document outlines the evaluation criteria for the Jugapuu playground reconstruction tender, where the total bid price is the sole evaluation method with a 100% weighting.

Hankepass täiendatavate selgitustegaPDF
305820_hankepass_taiendavate_selgitustega.pdf -- 73.0 KB

The Procurement Pass (ESPD) is an initial self-declaration by the economic operator, containing the contracting authority's stipulated conditions and expected response formats, but it is filled out electronically, not directly.

RHAD_Hankemenetluse kordDOC
RHAD_Hankemenetluse kord.doc -- 101.5 KB

The procurement procedure rules outline the general terms, conditions, and submission requirements for the Jugapuu playground reconstruction tender.

RHAD_Lisa 1.2. BIM tehnilised tingimusedDOC
RHAD_Lisa 12 BIM tehnilised tingimused.docx -- 38.4 KB

The contracting authority requires the creation of BIM models and the submission of an implementation plan according to the provided technical conditions and requirements.

RHAD_Lisa 1.3. BIM rakenduskava alusmallDOC
RHAD_Lisa 13 BIM rakenduskava alusmall.docx -- 2.1 MB

This document provides the BIM implementation plan template for the Jugapuu playground reconstruction project, which is required for tender submission.

RHAD_Lisa 1.4. Esitatavate mudelite nimekirjadXLS
RHAD_Lisa 14 Esitatavate mudelite nimekirjad.... -- 24.5 KB

The bidder must submit lists of models used in the playground reconstruction project and their formats, adhering to the BIM implementation plan and the client's requirements.

RHAD_Lisa 1. Tehniline kirjeldusDOC
RHAD_Lisa 1 Tehniline kirjeldus.docx -- 1.2 MB

This technical specification defines the requirements for the reconstruction of the Jugapuu playground, based on the project, approvals, and applicable legislation.

RHAD_Lisa 3.1. Alltöövõtja kinnitusedDOC
RHAD_Lisa 31 Alltöövõtja kinnitused.docx -- 13.6 KB

The subcontractor must confirm that they do not have grounds for exclusion from the procurement procedure by submitting a corresponding confirmation.

RHAD_Lisa 3. Alltöövõtu kasutamise vormDOC
RHAD_Lisa 3 Alltöövõtu kasutamise vorm.docx -- 15.3 KB

The bidder must submit a form listing all subcontractors to be used in fulfilling the contract, including their details and the scope of subcontracting.

RHAD_Lisa 6. Ühispakkujate volikiri (vajadusel)DOC
RHAD_Lisa 6 Ühispakkujate volikiri (vajadusel... -- 22.9 KB

This power of attorney is required if a joint bidder submits a bid, to authorize one joint bidder to represent the others in the procurement procedure.

Pregled dokumenata

Registrujte se da biste videli sažetke i analizu dokumenata

75
Dobro

Rezultat kvaliteta tendera

This tender for the reconstruction of the Jugapuu playground is generally well-structured with clear requirements and a straightforward evaluation process. However, it lacks explicit sustainability considerations and some documentation formats are not machine-readable.

Pregled rezultata

Zakonska usklađenost75/100

The tender adheres to standard procurement procedures, including proper CPV classification and a reasonable timeline. There are no immediate indications of disputes or regulatory non-compliance. Deadlines appear reasonable within the context of the submission period.

Jasnoća80/100

The tender provides a clear objective and specifies that detailed conditions are in the base documents. Requirements for BIM models, cost breakdowns, and subcontractor confirmations are explicitly stated. The evaluation criteria are clearly defined as solely based on price.

Potpunost70/100

Most essential information is present, including estimated value, duration, and deadlines. However, the financing condition is stated as 'Toodud hankelepingu projektis' which implies the details are within an attached document, and the actual financing source is not explicitly detailed in the basic information. Several key documents are in formats not supported by AI analysis.

Financing details are referenced in an attached document rather than explicitly stated.
Pravičnost85/100

The tender is conducted via e-procurement, and the evaluation is based on a single, objective criterion (price). Access to documents is provided, and the value is disclosed. There are no apparent requirements tailored to specific companies.

Praktičnost65/100

E-submission is mandated. The contract start date is not explicitly stated, only the duration. Financing information is referenced within the contract project document. The duration is clearly specified.

Contract start date is not explicitly provided.
Konzistentnost podataka90/100

Key fields such as title, reference, organization, deadlines, and value are populated. There are no reported disputes or suspensions. Dates are logically sequenced.

Održivost50/100

The tender does not explicitly mention green procurement, social aspects, or innovation. It is not indicated as EU-funded, which often implies adherence to certain sustainability standards.

Lack of explicit green procurement criteria.
Absence of social responsibility considerations.

Prednosti

Clear evaluation criteria (price-based).
Mandatory e-submission and e-procurement.
Detailed technical requirements (BIM).
Well-defined exclusion and eligibility criteria.

Nedostaci

Lack of explicit sustainability criteria.
Some key documents are in non-analyzable formats.
Contract start date not explicitly stated.

Preporuke

1. Incorporate specific green and social procurement criteria.
2. Ensure all essential documents are in machine-readable formats.
3. Clearly state the contract start date.

Pregled AI ocene

Registrujte se da biste videli potpune zahteve i analizu

Potpuna analiza ocene kvaliteta
Detaljan pregled pod-ocena
Uvidi u prednosti i zabrinutosti
Strateške preporuke

Nije potrebna kreditna kartica • Podešavanje za 2 minuta

Nova usluga

Želite da prepustite nama ovaj tender?

Naši stručnjaci za javne nabavke pripremaju sve. Dokazano efikasno — Vi pregledate, odobrite i predate.

~1hVaše vreme
80%+80%+
$0Unapred
Pogledajte punu uporednu analizu
Bez TaaS-aSa TaaS-om
40-80 sati
Vreme pripreme
~1 sat
Vaše vreme
15-25%
Prosečan procenat uspešnosti
80%+
Procenat uspešnosti
Rizik od grešaka
Ručna provera
Stručna kontrola kvaliteta
Provera usaglašenosti
Sve radite Vi
Kompletna obrada
Sve radimo mi
Kompletna usluga
Dobijmo ovaj tender
Platite samo kada pobedite · Preko 400 kompanija nam veruje
Ili uradite sami

Dodaj u plan