Ønsker du å legge inn bud på offentlige anbud? Se vår TaaS-tjeneste for anbudsklargjøring
Anbud

Building Safety Higher Risk Buildings Framework

Åpen
Frist
24 dager igjen
juli 10, 2026
Kontraktsdetaljer
Kategori
Open Procedure
Referanse
045583-2026
Verdi
£144,000,000
Sted
Hampshire and Isle of Wight, Storbritannia
Publisert
juni 08, 2026
CPV-kode
Prosjektets tidslinje

Anbud publisert

mai 19, 2026

Kontraktens startdato

september 28, 2026

KjøperinnsiktPRO
🔒
Lås opp kjøperinnsikt
Se forbruksmønstre, foretrukne prosedyrer og mer.
Oppgrader til Professional →
Budsjett
£144,000,000
Varighet
48 måneder
Sted
Hampshire and Isle of Wight
Type
Open Procedure

Opprinnelig anbudsbeskrivelse

Portsmouth City Council (the Council) is issuing this notice as it is planning to issue a tender to establish a Framework to provide building safety projects for several higher risk residential buildings within the Portsmouth area. It is anticipated that the framework will be established for an initial 4-year period, with the option to extend by up to a further 2 years in intervals to be agreed. The framework will have an estimate value range of £60m - £120m of work that may be procured through the procurement route based upon the Building Safety Programme for 2025 to 2030. The framework, although primarily for delivery of projects that cover high rise buildings with higher construction value works, will also cover low - medium rise blocks in order to package up phases of work by consideration of geography. The Council do however anticipate that approximately 70% of low-medium rise blocks building safety projects will be let via other arrangements including for the existing and re-tendered framework agreements held by the Council & the Council's term service maintenance contracts. It is not proposed to set a minimum or maximum project value for call offs, as whilst the contract value ranges may differ the core work is of a similar nature, ie. of high complexity, requiring a high level of engagement from the contractor with the majority of the projects utilising design and build and requiring significant resident engagement. The Council's Standard Framework Agreement will be used for the overarching framework. Most call-off contracts will be let using JCT Pre-Construction Agreement for 1st stage pre-construction activities and the JCT Design & Build Contact for 2nd stage construction works. However, the Council is considering allowing for use of the full suite of JCT contracts. It is the Council's intention to commence the procurement in June 2026 to allow for award in September 2026 ahead of the commencement of the first project on site in May 2027. To streamline procurement of contractors and allow high rise programme to be accelerated the Council intends to establish a single framework consisting of 3- 4 suppliers on the primary tier and 2-3 suppliers on a reserve tier to provide contingency in the event of performance and / or capacity issues. The Council is intending to invite proposals for Millgate House, as part of the tendering process to establish the framework agreement with the highest ranked framework contractor being awarded a call-off package of work including the Millgate House project. Should up to the next 3 highest ranked suppliers achieve a score within a percentage of the highest-ranking supplier, it is also the council's intention to award a call off package of work to each of these suppliers also. In total the Council anticipates partnering with up to 4 contractors who will work on a pipeline package of multiple projects, including the Design, Construction and compliance with legal and regulatory authorities such as the Building Safety Regulator. It is anticipated that each pipeline package will consist of 3 - 5 projects of varying individual complexities, with anticipated value ranging from £8M initially up to approximately £30M, with higher end value subject to business case sign off of later stages and subject to package contractor performance. Overall, the packages offered will be of equal value and complexity to each other. The Council's intention is that contractors will be required to meet minimum performance KPIs to be awarded further works within the Pipeline. Beyond allocation of packages from the original tender process, the council will also reserve the right to award further work via mini competition or direct award on basis of: - ranking - subsequent linked work phases - application of framework rates basis - enabling continuity of work force during BSR period Local Government Review As part of the wider Local Government Review (LGR), the Council is required to actively engage in discussions with neighbouring authorities to explore potential opportunities for collaboration, shared service delivery, and governance alignment. While this engagement is ongoing, no formal decisions or agreements have been reached at this stage. The likely impacts of Local Government Review are being considered and will be included for within the estimate total value of the opportunity, with full details to be provided when the formal tender notice is issued. Portsmouth City Council & Successor Unitary Authority established as result of Local Government Re-organisation which will likely broadly cover Portsmouth, Gosport, Fareham & Havant boundaries. Gosport Borough Council, Fareham Borough Council and Havant Borough Council will also be able to utilise the framework in advance of the new unitary authority vesting on 1st April 2028. In the event of reorganisation, contracts will include clauses that allow for the assignment of the contract to successor authorities. Any assignment clause is likely to state any contract may be assigned to any new authority that succeeds the original contracting authority. For further details in respect of LGR see the following link - https://www.portsmouth.gov.uk/services/council-and-democracy/devolution-and-plans-for- local-government-reorganisation/ Core Scope of Works The core scope of works will include but not limited to: Fire Stopping New Compartment Walls New Communal Fire Door Sets New Fire Rated Property Entrance Doors (External and Internal) Class B-s1, d0 Communal Decoration Installation of External Wall Systems Fire Rated Window Replacement Walkway / Balcony Railing Repair / Replacement Installation of Emergency Lighting Installation of Fire Alarm Systems Installation of Evacuation Alert Systems Solar Panel Remediations Installation of AOVs Ventilation Repairs / Improvements Installation of Sprinklers Dry/Wet Riser Installation / Replacement Establishment Project Details Mill Gate House (1-76) Remediation project will be used to establish the framework. This is a complex fire project, involving a resident decant, that is typical of the work to be procured through the framework. Value estimate is £1.5m. A two stage D&B Procurement process will be used, with contractor to provide PCSA costs, schedule of rates and quality submission under a JCT PCSA contract followed by a JCT Design and Build 2024 contract. Mill Gate House Project Programme: • Tender: June 2026 • On site: 01/03/2027 • Complete: 05/05/2028

Risikoanalyse

Risikoanalyse er ikke tilgjengelig for dette landets anbud ennå. Støttes for øyeblikket: Estland, Latvia, Litauen, Polen, Frankrike, Storbritannia, Danmark, Nederland, Norge og Finland.

Vinnstrategi

Få en AI-drevet vinnerstrategi skreddersydd for dette anbudet. Inkluderer sannsynlighetsscore for å vinne, viktige muligheter og utfordringer, anbefalte fokusområder for tilbudet, innsikt i konkurranseposisjonering og handlingsrettede anbefalinger for å maksimere sjansene dine.

Logg inn

Konkurrenter

Oppgrader for å se hvilke selskaper som sannsynligvis vil legge inn tilbud på dette anbudet, basert på historiske anskaffelsesdata.

Logg inn

Krav og kvalifikasjoner

AI trekker ut og organiserer alle krav fra anbudsunderlagene – obligatoriske kvalifikasjoner, tekniske spesifikasjoner, finansielle betingelser og innleveringsregler – tydelig kategorisert slik at du vet nøyaktig hva som kreves for å gi et tilbud.

Logg inn

Grunnleggende krav

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokumenter

3 dokumenter tilgjengelig med AI-sammendrag

OCDS RecordDOC
045583-2026_ocds_record.json

Ingen sammendrag tilgjengelig for dette dokumentet.

Vis
OCDS Release PackageDOC
045583-2026_ocds_release.json

Ingen sammendrag tilgjengelig for dette dokumentet.

Vis
Official PDF VersionPDF
045583-2026_official.pdf

Ingen sammendrag tilgjengelig for dette dokumentet.

Vis

Forhåndsvisning av dokumenter

Registrer deg for å se dokumentoppsummeringer og analyser

Kvalitetsscore

Omfattende kvalitetsanalyse av dette anbudet som vurderer juridisk samsvar, klarhet, fullstendighet, rettferdighet, praktisk gjennomførbarhet, datakonsistens og bærekraft på en skala fra 0-100 med detaljert oversikt og anbefalinger.

Logg inn

Legg til i pipeline