Ønsker du å legge inn bud på offentlige anbud? Se vår TaaS-tjeneste for anbudsklargjøring
Anbud

Westwick Row – Hovedentreprenørens prosjekterings- og byggearbeider

Åpen
Frist
87 dager igjen
juli 12, 2026
Kontraktsdetaljer
Kategori
Restricted Procedure
Referanse
025964-2026
Verdi
£29,640,000
Sted
Bedfordshire and Hertfordshire, Storbritannia
Publisert
april 08, 2026
Organisasjon
CPV-kode
Prosjektets tidslinje

Anbud publisert

mars 20, 2026

Frist for spørsmål

juli 05, 2026

Frist for innlevering

juli 12, 2026

Kontraktens startdato

juli 12, 2026

Budsjett
£29,640,000
Varighet
48 måneder
Sted
Bedfordshire and Hertfordshire
Type
Restricted Procedure
75
Kvalitetsscore/100
God

Opprinnelig anbudsbeskrivelse

Anskaffelse av entreprenørens designtjenester og byggearbeider under en åpen, konkurransedyktig fleksibel prosedyre, inkludert obligatoriske deltakelsesbetingelser, etterfulgt av to konkurrerende anbudsrunder. Tildelingen til den vellykkede budgiveren vil følge en to-trinns design- og byggekontraktstilnærming. Under en avtale om forhåndstjenester vil den utpekte entreprenøren utvikle det tekniske designet og bygningsmetodene, med forbehold om en sekundær utnevnelse for å levere byggearbeider basert på den godkjente planen.

Risikoanalyse

Risikoanalyse er ikke tilgjengelig for dette landets anbud ennå. Støttes for øyeblikket: Estland, Latvia, Litauen, Polen, Frankrike, Storbritannia, Danmark, Nederland, Norge og Finland.

Vinnstrategi

Få en AI-drevet vinnerstrategi skreddersydd for dette anbudet. Inkluderer sannsynlighetsscore for å vinne, viktige muligheter og utfordringer, anbefalte fokusområder for tilbudet, innsikt i konkurranseposisjonering og handlingsrettede anbefalinger for å maksimere sjansene dine.

Logg inn

Konkurrenter

Oppgrader for å se hvilke selskaper som sannsynligvis vil legge inn tilbud på dette anbudet, basert på historiske anskaffelsesdata.

Logg inn

Krav og kvalifikasjoner

5 krav på tvers av 5 kategorier

Innlevering (1)
Obligatorisk (1)
Overholdelse (1)
Teknisk (1)
Finansiell (1)
SUBMISSION REQUIREMENTS1
--[No specific requirements listed in the provided text]
MANDATORY EXCLUSION GROUNDS1
--[No specific requirements listed in the provided text]
ELIGIBILITY REQUIREMENTS1
--[No specific requirements listed in the provided text]
TECHNICAL CAPABILITY REQUIREMENTS1
--[No specific requirements listed in the provided text]
FINANCIAL REQUIREMENTS1
--[No specific requirements listed in the provided text]

Forhåndsvisning av krav

Registrer deg for å se komplette krav og analyser

Dokumenter

3 dokumenter tilgjengelig med AI-sammendrag

OCDS RecordDOC
025964-2026_ocds_record.json

Ingen sammendrag tilgjengelig for dette dokumentet.

Vis
OCDS Release PackageDOC
025964-2026_ocds_release.json

Ingen sammendrag tilgjengelig for dette dokumentet.

Vis
Official PDF VersionPDF
025964-2026_official.pdf

Ingen sammendrag tilgjengelig for dette dokumentet.

Vis

Forhåndsvisning av dokumenter

Registrer deg for å se dokumentoppsummeringer og analyser

75
God

Anbudskvalitetsscore

This tender presents a well-structured procurement process for design and construction works, with a clear description and good data consistency. However, it lacks specific details on evaluation criteria and sustainability aspects.

Poengfordeling

Juridisk samsvar75/100

The tender adheres to general legal compliance by providing a clear procedure, proper CPV code, and no reported disputes. The deadline, while potentially tight, is specified. The 'Competitive flexible procedure' suggests a structured approach. However, the absence of a reveal date for documents is a minor procedural gap.

Missing reveal date
Klarhet80/100

The description of the procurement is clear, outlining a two-stage design and build contract approach. The requirements for participation are mentioned as mandatory, but specific details are not provided in the extract. The lack of specified evaluation criteria is a significant clarity issue.

No evaluation criteria specified
Fullstendighet70/100

Most basic information is present, including title, reference, organization, estimated value, and contract duration. However, the crucial 'AI-EXTRACTED REQUIREMENTS' section is largely empty, indicating a lack of detailed mandatory, eligibility, technical, financial, and submission requirements within the provided text. The tender documents are listed but their content is not accessible.

No specific requirements listed in AI-extracted section
No document content available
Rettferdighet85/100

The tender uses a competitive flexible procedure and discloses the estimated value, promoting fairness. The deadline is specified, though its reasonableness is debatable. The lack of specific eligibility and technical requirements in the provided text could be a concern if these are not detailed in the full documents, but the general approach appears objective. No company-specific tailoring is evident.

Praktisk gjennomførbarhet65/100

The tender specifies a contract duration and start date, which are practical considerations. However, the absence of information regarding e-submission and financing details limits its practicality for potential bidders. The contract start date coinciding with the submission deadline is highly impractical and likely an error.

No e-submission mentioned
Financing information not specified
Datakonsistens90/100

Key fields such as title, reference, organization, estimated value, and deadlines are populated. There are no reported disputes or suspensions. The dates provided are logical, except for the contract start date coinciding with the submission deadline, which is a significant inconsistency.

Contract start date coincides with submission deadline
Bærekraft50/100

The tender does not explicitly mention any green procurement, social aspects, or innovation focus. It is also not indicated as EU funded. This suggests a lack of emphasis on sustainability criteria.

Not green procurement
No social criteria

Styrker

Clear title and reference number
Organization and estimated value disclosed
Description of the two-stage design and build approach
CPV code provided

Bekymringer

Missing specific requirements in AI-extracted section
No evaluation criteria specified
Contract start date coincides with submission deadline
Lack of sustainability considerations

Anbefalinger

1. Provide detailed evaluation criteria within the tender documentation.
2. Clarify and correct the contract start date to be distinct from the submission deadline.
3. Incorporate and specify sustainability and innovation requirements if applicable.

Forhåndsvisning av AI-score

Registrer deg for å se komplette krav og analyser

Fullstendig analyse av kvalitetsresultat
Detaljert nedbrytning av delresultater
Innsikt i styrker og bekymringer
Strategiske anbefalinger

Ingen kredittkort kreves • Oppsett på 2 minutter

Legg til i pipeline