Wil je inschrijven op overheidsaanbestedingen? Bekijk onze TaaS aanbestedingsvoorbereidingsservice
Aanbestedingen

Wateren van wegen in het district Kretinga met grondwater (pekel) ter vermindering van stof

Open
Deadline
8 dagen resterend
April 23, 2026
Contractdetails
Categorie
Open Procedure
Referentie
6986576
Waarde
Niet bekendgemaakt
Locatie
Klaipeda County, Litouwen
Gepubliceerd
April 08, 2026
CPV-code
Projecttijdlijn

Aanbesteding gepubliceerd

Maart 19, 2026

Deadline voor vragen

April 16, 2026

Deadline voor inschrijving

April 23, 2026

Opening van de aanbesteding

April 23, 2026

WinstkansPRO
🔒
Upgrade naar Professional
Bekijk je geschatte winstkans op basis van historische gegevens.
Upgrade naar Professional →
Buyer IntelligencePRO
🔒
Ontgrendel Buyer Intelligence
Bekijk uitgavenpatronen, voorkeursprocedures en meer.
Upgrade naar Professional →
SectorinzichtenPRO
🔒
Ontgrendel Sectorinzichten
Bekijk gemiddelde winnende prijzen, concurrentieniveaus en markttrends.
Upgrade naar Professional →
Budget
Niet bekendgemaakt
Looptijd
37 maanden
Locatie
Klaipeda County
Type
Open Procedure
75
Kwaliteitsscore/100
Goed
Marktbenchmark
Gem. Winnende Prijs
€771,462
Gem. Inschrijvingen
2.8
Concurrentie
Laag
MKB-winnaars
95%
989 geanalyseerde aanbestedingen

Originele aanbestedingsbeschrijving

De Centrale Inkooporganisatie is voornemens de bewatering van wegen in het district Kretinga aan te schaffen ter vermindering van stof
Groene Inkoop

Risicoanalyse uitvoeren

Identificeer potentiële risico's, inconsistenties en rode vlaggen in alle aanbestedingsdocumenten. Ontvang een gedetailleerd risicorapport met ernstniveaus en aanbevelingen voor mitigatie.

Inloggen

Winststrategie

AI-gestuurde analyse van de vereisten, kansen en uitdagingen van deze aanbesteding. Krijg strategische inzichten om je winstkans te maximaliseren.

65%
Geschatte winstkansMatige match

This tender seeks dust suppression watering services for roads in Kretinga district, with a 37-month duration. While evaluation criteria are unspecified, a winning bid will leverage demonstrated technical capability, cost-effectiveness, and a strong commitment to green procurement principles, despite the absence of explicit social value requirements.

Kernboodschappen voor winst

Reliable and efficient dust suppression for Kretinga's roads, ensuring environmental compliance and public well-being.

Sustainable operations through responsible water usage and eco-friendly practices.

Belangrijke Kansen
The lack of specified evaluation criteria presents an opportunity to define value through a strong proposal that anticipates the contracting authority's likely priorities.
The 'Green Procurement: Yes' flag indicates a strong emphasis on environmental considerations, allowing bidders to differentiate through sustainable practices and resource management.
The extended contract duration (37 months) allows for long-term planning and investment in specialized equipment and efficient operational models.
Belangrijke Uitdagingen
Absence of detailed mandatory exclusion grounds, eligibility, technical, and financial requirements means significant information gathering is needed.

Proactively seek clarification from the contracting authority regarding all missing tender requirements. Prepare a comprehensive ESPD and supporting documentation that covers a broad range of potential requirements.

Unspecified evaluation criteria make it difficult to tailor the bid for maximum scoring. The tender is open, suggesting potential for multiple bidders.

Assume a balanced evaluation approach focusing on technical merit, price, and green procurement. Develop a strong value proposition that addresses all implicit needs of the contracting authority.

The CPV code (90600000) is broad, potentially attracting a wide range of service providers.

Focus on demonstrating specialized expertise in road dust suppression and water management, rather than general cleaning services.

Ideaal Inschrijversprofiel
A company with proven experience in road maintenance, dust suppression, and water management, possessing a modern fleet of specialized watering vehicles. The ideal bidder will also demonstrate a proactive approach to environmental sustainability and efficient operational practices.
Belangrijkste Vereisten
Provision of dust suppression watering services for roads in Kretinga district.
Contract duration of 37 months.
Adherence to Green Procurement principles.
Compliance with mandatory exclusion grounds (details to be confirmed).
Demonstration of eligibility, technical capability, and financial stability (details to be confirmed).
Belangrijkste onderscheidende factoren
Demonstrated commitment to water conservation and efficient water usage in dust suppression operations.
A modern, well-maintained fleet of specialized dust suppression vehicles, potentially including low-emission models.
A robust operational plan that minimizes disruption to traffic and residents.
Proactive engagement with the contracting authority to understand their specific needs and concerns beyond the stated requirements.
Kansen voor sociale waarde
While not explicitly required, consider including a commitment to local employment or training opportunities within the Kretinga district, if feasible, to enhance the bid's broader appeal.
Focusgebieden voor de inschrijving
Price

Develop a competitive and sustainable pricing model that reflects operational efficiency and long-term value. Avoid undercutting that compromises quality or sustainability.

Technical Capability

Provide detailed evidence of past performance, relevant certifications, and a clear operational methodology for dust suppression. Highlight specialized equipment and trained personnel.

Green Procurement

Detail specific measures for water conservation, waste reduction, and potential use of eco-friendly materials or practices. Quantify environmental benefits where possible.

Aanbevelingen7
Proactively Seek Clarification on Missing Requirements
KritiekGemiddelde inspanning

Given the absence of detailed mandatory exclusion grounds, eligibility, technical, and financial requirements, it is imperative to formally request this information from the contracting authority as soon as possible. This will allow for a fully compliant and tailored bid.

Ensures bid compliance and reduces risk of disqualification.
Anticipate Evaluation Criteria and Emphasize Value
HoogGemiddelde inspanning

Since evaluation criteria are not specified, assume a balanced approach. Focus on demonstrating superior technical capability, cost-effectiveness, and a strong commitment to green procurement. Highlight how the proposed solution offers the best overall value to the contracting authority.

Maximizes scoring potential by addressing likely evaluation priorities.
Showcase Sustainable Water Management Practices
HoogGemiddelde inspanning

Leverage the 'Green Procurement: Yes' requirement by detailing specific strategies for efficient water usage, water source management, and minimizing environmental impact. This could include using water-efficient equipment or optimizing watering schedules.

Positions the bidder as an environmentally responsible partner, a key differentiator.
Develop a Robust Operational Plan with Risk Mitigation
HoogHoge inspanning

Outline a detailed operational plan that addresses logistics, scheduling, equipment maintenance, and emergency response. Include a section on how potential risks (e.g., weather, equipment failure) will be mitigated to ensure continuous service delivery.

Demonstrates preparedness and reliability, building trust with the contracting authority.
Highlight Specialized Fleet and Technology
GemiddeldGemiddelde inspanning

If applicable, showcase a modern and specialized fleet of dust suppression vehicles, potentially including GPS tracking for route optimization and water usage monitoring. This demonstrates efficiency and technological advancement.

Enhances technical credibility and operational efficiency.
Thorough ESPD and Documentation Preparation
KritiekHoge inspanning

Given the limited information, ensure the ESPD and all supporting documentation are comprehensive and meticulously prepared. Anticipate potential requirements based on similar tenders and Lithuanian public procurement regulations.

Minimizes the risk of administrative errors or omissions leading to disqualification.
Consider Local Impact Commitments
LaagLage inspanning

While not mandatory, explore opportunities to include commitments related to local employment, training, or community engagement within the Kretinga district. This can add a positive dimension to the bid.

Enhances the bid's broader societal contribution and appeal.
Concurrentiepositie
Position the bid as the most reliable and environmentally conscious provider of dust suppression services, emphasizing long-term value and operational excellence over solely price-driven competition.

Concurrenten

Upgrade om te zien welke bedrijven waarschijnlijk op deze aanbesteding zullen inschrijven, gebaseerd op historische inkoopgegevens.

Inloggen

Vereisten & Kwalificaties

5 vereisten over 5 categorieën

Indiening (1)
Verplicht (1)
Naleving (1)
Technisch (1)
Financieel (1)
SUBMISSION REQUIREMENTS1
--No information available on submission requirements.
MANDATORY EXCLUSION GROUNDS1
--No information available on mandatory exclusion grounds.
ELIGIBILITY REQUIREMENTS1
--No information available on eligibility requirements.
TECHNICAL CAPABILITY REQUIREMENTS1
--No information available on technical capability requirements.
FINANCIAL REQUIREMENTS1
--No information available on financial requirements.

Voorbeeld van vereisten

Meld je aan om volledige vereisten en analyse te bekijken

Documenten

8 documenten beschikbaar met AI-samenvattingen

Atviro konkurso specialiosios sąlygosDOC
Atviro konkurso specialiosios sąlygos Versija...

This document contains the special conditions for an open tender for the service of watering roads in the Kretinga region to reduce dust using underground water.

Bendrosios sąlygos paslaugų sutartiesDOC
Bendrosios sąlygos paslaugų sutarties Kreting...

This document contains the general terms and conditions for a services contract, defining key terms and outlining the hierarchy of contractual documents.

Specialiosios sąlygos paslaugų sutartisDOC
Specialiosios sąlygos paslaugų sutartis Kreti...

This document contains the special conditions for a service contract for the procurement of dust suppression watering services for roads in the Kretinga district.

Atviro konkurso bendrosios sąlygosPDF
Atviro konkurso bendrosios Kretingos r. vieti...

This document contains the general conditions for an open tender procedure for the procurement of dust suppression watering for roads in the Kretinga district.

espd-request.pdfPDF
espd-request.pdf -- 79.2 KB

No content extracted

NoticePDF
Notice_6986576.pdf

This document contains a tender notice for the provision of services for watering road surfaces in Kretinga district to reduce dust, using groundwater.

Techninė specifikacija 2026 m. (laistymas)PDF
Techninė specifikacija 2026 m. (laistymas) (u...

This document contains the technical specification for dust reduction watering services for gravel roads in Kretinga district, outlining the scope, requirements, and quantities.

README.txtTXT
README.txt -- 835 B

This document contains corrupted data and is not readable, making it impossible to determine its purpose or content.

Voorbeeld van documenten

Meld je aan om document samenvattingen en analyse te bekijken

75
Goed

Kwaliteitsscore aanbesteding

This tender for road watering services in Kretinga district is generally well-structured with clear documentation, but lacks specific evaluation criteria and details on sustainability aspects. The estimated value is not disclosed, impacting a full assessment of fairness and completeness.

Scoreoverzicht

Wettelijke naleving75/100

The tender adheres to open procedure (2014/24/ES) and includes necessary documents like technical specifications and general/special conditions. The CPV code is provided. However, the absence of a specified reveal date for submissions and the lack of explicit evaluation criteria are minor procedural gaps.

Missing reveal date
No evaluation criteria specified
Duidelijkheid80/100

The title and description clearly state the purpose of the procurement: dust reduction watering for roads in the Kretinga district. Key documents like technical specifications and contract conditions are available, providing a good understanding of the service required.

Volledigheid70/100

Most basic information is present, including the organization, reference number, and contract duration. However, the estimated value is not disclosed, which is a significant omission for a complete assessment of the tender's scope and financial implications.

Estimated Value not disclosed
Eerlijkheid85/100

The tender is an open procedure, promoting broad participation. The use of e-procurement is a positive aspect. However, the lack of disclosed estimated value and the absence of specified evaluation criteria could potentially hinder a fully objective assessment by bidders.

Value not disclosed
No evaluation criteria specified
Praktische uitvoerbaarheid65/100

The tender is active and has a submission deadline. E-procurement is indicated. However, the specific start date of the contract is not explicitly mentioned, and financing information is absent, which could affect practical planning for potential bidders.

Contract start date not specified
Financing information not provided
Gegevensconsistentie90/100

Key fields such as title, reference, organization, and deadlines are populated. The tender status is 'active', and there are no reported disputes or suspensions. Dates appear logical within the context of a tender process.

Duurzaamheid50/100

The tender does not explicitly mention any green procurement, social aspects, or innovation focus. It is not indicated as EU funded, which limits the assessment of sustainability integration.

No green procurement mentioned
No social criteria mentioned

Sterke punten

Clear title and description of services
Comprehensive set of required documents provided
Open procedure and e-procurement utilized
Active status with logical timeline elements

Aandachtspunten

Estimated value not disclosed
Lack of specified evaluation criteria
Absence of sustainability considerations (green, social, innovation)
Missing contract start date

Aanbevelingen

1. Disclose the estimated value of the contract.
2. Clearly define the evaluation criteria for submitted bids.
3. Incorporate sustainability aspects into the tender requirements.

Voorbeeld van AI-score

Meld je aan om volledige vereisten en analyse te bekijken

Volledige analyse van de kwaliteitsscore
Gedetailleerde uitsplitsing van subscores
Inzichten in sterke en zwakke punten
Strategische aanbevelingen

Geen creditcard vereist • Setup in 2 minuten

Nieuwe Dienst

Laat ons deze aanbesteding voor je verzorgen?

Onze inkoopexperts bereiden alles voor. Bewezen effectief — jij beoordeelt, keurt goed en dient in.

~1hJouw tijd
80%+80%+
$0Vooraf
Volledige vergelijking bekijken
Zonder TaaSMet TaaS
40-80 uur
Voorbereidingstijd
~1 uur
Jouw tijd
15-25%
Gemiddelde winstkans
80%+
Succesratio
Risico op fouten
Handmatige controle
Expert QA
Nalevingcontrole
Jij doet alles
Alles zelf regelen
Wij doen alles
End-to-end service
Laten we deze aanbesteding winnen
Betaal pas als je wint · Meer dan 400 bedrijven vertrouwen ons
Of doe het zelf

Toevoegen aan pipeline