Jauniniet, lai redzētu, kuri uzņēmumi, visticamāk, iesniegs piedāvājumu šim iepirkumam, pamatojoties uz vēsturiskajiem iepirkumu datiem.
Pieteikties33 prasības 5 kategorijās
Reģistrējieties, lai skatītu pilnas prasības un analīzi
5 dokumenti pieejami ar AI kopsavilkumiem
This compliance-only document merely requires bidders to confirm (mandatory radio-button declarations) that no Russian-linked subcontractors/suppliers exceeding 10% of contract value will be used, to submit a joint-bid authorisation if applicable, and to identify any claimed trade secrets without hiding price or evaluation data—no technical, financial or qualification criteria for the lift replacement itself are provided.
This is a lowest-price-wins tender (100 % price criterion) for the mandatory turnkey replacement of Rakvere Hospital’s 1980-era transport lift with a modern accessibility-compliant unit, so bidders must be able to design, obtain permits, dismantle and dispose of the old lift, execute all building, electrical and low-voltage works, and install a fully operational new lift inside the existing shaft.
This simplified open-procedure tender requires mandatory replacement of Rakvere Hospital’s 1980-era transport lift (shaft reuse) with a modern, accessibility-compliant unit; bidders must submit a completed ESPD (no separate documents) and will be evaluated mainly on price, making it suitable for any Estonian-registered contractor with lift-installation experience and valid tax/insurance records.
Rakvere Hospital is tendering a mandatory turnkey replacement of its 1980s transport lift (no. 4) within 6 months, requiring full compliance with accessibility regulations, fire-safety integration, and proven lift-installation experience including all necessary licences and on-site inspection.
Rakvere Hospital is tendering a mandatory turnkey replacement of its 1980s transport lift (no. 4) in the existing shaft, requiring bidders to first inspect the site, design and install a new EN81/2014/33/EU-compliant passenger-goods lift meeting all Estonian accessibility and fire-safety regulations, and carry out full dismantling, disposal and construction works with final commissioning and conformity certification.
Reģistrējieties, lai skatītu dokumentu kopsavilkumus un analīzi
Kvalitātes analīze šim iepirkumam tiek apstrādāta. Lūdzu, pārbaudiet vēlāk.
Sveicināti! Es esmu jūsu AI asistents šim iepirkumam. Es varu palīdzēt jums saprast prasības, termiņus, atbilstības kritērijus un sniegt stratēģiskus ieskatus.
Nav nepieciešama kredītkarte