Atpakaļ uz iepirkumiem

City Cemetery Kildrum Gardens T ENV 21-063 Contractors PQQ Application

Slēgts

Iesniegšanas termiņš ir beidzies

Šī iepirkuma iesniegšanas termiņš ir beidzies un pieteikumi vairs netiek pieņemti. Zemāk esošā informācija ir saglabāta uzziņai.

Pārlūkot aktīvos iepirkumus
Termiņš
Beidzies
Februāris 14, 2022
Līguma detaļas
Kategorija
Cits
Atsauce
032047-2022
Vērtība
£885,846
Atrašanās vieta
United Kingdom, Apvienotā Karaliste
Publicēts
Februāris 24, 2026
CPV kods
Projekta laika skala

Iepirkums publicēts

Novembris 11, 2022

Termiņš jautājumiem

Februāris 07, 2022

Iesniegšanas termiņš

Februāris 14, 2022

Budžets
£885,846
Ilgums
Nav norādīts
Atrašanās vieta
United Kingdom
Tips
Cits

Oriģinālais iepirkuma apraksts

The Contract is for the provision of an extension of the existing Derry City Cemetery by construction of approximately an additional 950 burial plots. The development site at Southway Wood, (townland Ballymagowan) is sloped and is currently a mix of semi mature trees and scrub growth. The site is bounded on the northeast side by the existing City Cemetery (Lone Moor Road, BT48 2LA) and is bounded on the northwest by the existing gravel playing field and Kildrum Gardens Community Centre. The development site is approximately rectangular in footprint having an area of 0.915 hectares. The development site will be an extension of the existing cemetery with access to the proposed new burial plots from only the existing cemetery by an extension of the current internal cemetery roadway. The Construction contract will involve site clearance and preparation to facilitate an earthworks exercise to develop the necessary finalised gradients and profiles for the burial plot layout. This is also require construction of sections of modular reinforced block retaining wall. The site will be served by construction of a new bitmac access road linked to the existing internal cemetery roadway. The Contract will require construction of pedestrian footways, steps, handrailing, kerbing, drainage and installation of reinforced concrete plinths for locating head stones. The site will be completed with new perimeter fencing and walls with internal landscaping features and reinstatement. The anticipated contract programme is 9 months. Please refer to cfT documents for further details.

Risku analīze

Lūdzu, piesakieties, lai izmantotu risku analīzi.

Pieteikties

Uzvaras stratēģija

Lūdzu, piesakieties, lai piekļūtu uzvaras stratēģijas ieteikumiem.

Pieteikties

Konkurenti

Jauniniet, lai redzētu, kuri uzņēmumi, visticamāk, iesniegs piedāvājumu šim iepirkumam, pamatojoties uz vēsturiskajiem iepirkumu datiem.

Pieteikties

Prasības un kvalifikācijas

AI prasību analīze šim iepirkumam vēl nav pieejama.

Prasības tiks ģenerētas automātiski, kad tiks apstrādāti iepirkuma dokumenti.


Pamata prasības

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokumenti

Šim iepirkumam nav pieejami apstrādāti dokumenti.

Dokumenti parādīsies šeit, tiklīdz tie tiks lejupielādēti un analizēti.

Analīze gaida

Kvalitātes analīze šim iepirkumam tiek apstrādāta. Lūdzu, pārbaudiet vēlāk.

Pievienot pārvaldībai